Council archive · source document
Geotech Report · OPW26/0094
Project No. PG-10899 Page | 6 November 2023 Ref: PG-10899, 2023-10-16, GR VER 1 DD Sunnyside CD Sunnyside Pty Ltd – Geotechnical Investigation - Proposed Residence, 30 Mossman Court, Noosa Heads • Field density testing should be carried out to check the standard of compaction achieved and the placement moisture content. The frequency and extent of testing should be as per guidelines in AS.3798-2007. 8.0 BATTERS – SHORT TERM EXCAVATION PROFILE It is understood that cut batters to 3m in height will be required as part of the basement construction. Considering the proposed maximum height of cut, the following recommendations are made for the bulk excavation of the site. Batters < 2.0m in height • 1V:1.5H batter with crest of batter >2m from buildings or structures. Batters > 2.0m in height • 1V:1.5H batter with the crest of the batter at least 2.0m inside the site boundary. • 2.0m minimum distance from any building or structure. If batters are to be left exposed for an extended period of time, a battler angle of 1V:2H is recommended and berm widths are to be strictly maintained. The above batter slopes assume no seepage is present in the batters and the batters are above the water table. 9.0 TEMPORARY BATTER SUPPORT Where the excavations cannot be battered to a stable angle, they will need to be supported to prevent instability. Support systems could include: • Sheet Piles – anchoring or cross-bracing of the excavation are likely to be required for sheet piles or possibly cantilevered, and due consideration should be given to the potential for anchor installation and vibration to adversely affect adjacent areas. • Contiguous Piles – whilst no vibration is associated with their installation, it is likely a more expensive solution. • Steel Soldier Piles and Jetted Precast Panels – difficulties in maintaining stability whilst jetting the panels and is likely to be a higher risk option. Where sheet piles are to installed through medium dense or ‘denser’ sands, pre- drilling may be required to ensure installation. Where sands are retained, shoring pressures should be based on the lateral earth pressure coefficients given in Table 2, in conjunction with a triangular pressure distribution where the pressure can be calculated from P=0.5ka H2, provided the excavation is not surcharged by adjacent buildings/services and some tolerance or movement exists.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Geotech Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.8 MB (small file)
- File type
No other editions are linked here.