Council archive · source document
Geotech Report · OPW26/0094
Project No. PG-10899 Page | 5 November 2023 Ref: PG-10899, 2023-10-16, GR VER 1 DD Sunnyside CD Sunnyside Pty Ltd – Geotechnical Investigation - Proposed Residence, 30 Mossman Court, Noosa Heads accordance with AS 2870-2011 'Residential Slabs and Footings', following appropriate ground improvement works under the footings. It is recommended that the readers satisfy themselves that the use of AS 2870-2011 is applicable for the proposed design and the above site classification re-confirmed following the completion of the bulk earthworks operation. 7.0 EARTHWORKS AND SITE PREPARATION CONSIDERATIONS Earthworks are expected to comprise cuts of up to 3m for the proposed basement excavation. Some over-excavation may be required to allow for ground improvement works. It is recommended that the following site preparation and earthworks procedures be carried out as part of the earthworks procedures during development. • All earthworks operations should be carried out in general accordance with AS 3798-2007 "Guidelines on Earthworks for Commercial and Residential Developments". • Trafficability across the site at the time of the investigation was assessed to be fair to good with no difficulties encountered at the time of the investigation. Following stripping and excavation for the basement, the exposed sands will be difficult to traffic for conventional vehicles. Consideration could be given to adopting a 150mm layer of pavement gravel as a working platform across the site. • All topsoil (i.e. soil containing organic matter) and soils containing deleterious matter should be stripped from the construction area at the commencement of the earthworks operation. Dirty sands (i.e. >5% fine content), particularly the upper level sands (existing fill), could be difficult to manage and consideration could be given to the disposal of this material. • The stripped surface should be proof rolled using a vibrating roller or a large vibrating plate compactor (say 300kg), to identify areas of weak surficial soils and to compact the upper level material. • The “clean” sands on site will be suitable for re-use as structural fill, provided material is free of organic matter and deleterious material. The silty sand may prove difficult to re-use and consideration should be given to preferential disposal of this material. • Imported fill should be of fair to good quality with a minimum Soaked CBR value of 10%, a maximum Iss=1.0% and a maximum particle size of 75mm, or a clean sand. • All filling should be undertaken in layer thicknesses of approximately 250mm (or as appropriate for the compaction equipment being used). Fill should be compacted to a minimum dry density ratio of 98% Standard in accordance with AS1289 5.1.1 for cohesive fill and 75% Density Index for non-cohesive fill (i.e. sand).
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Geotech Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.8 MB (small file)
- File type
No other editions are linked here.