Council archive · source document
07/2114 - MCU - Detached House [As Published] · 132007.2114
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version ’20, 2 Apsil 2007 Whether particular buildings may be occupied for residential purposes For more information go to schedule 2 table 1 of the JP Regulation. Assessment period 15 days. No response is a deemed refusal. An application to use an existing building that is not class 1, 2, 3 or 4 for residential purposes may trigger a- referral to the local government as the concurrence agency. Design and sting ssment period § days. ‘No response isa 17. An application may trigger referral to the local government as the concurrence agency if the building work does not comply with the performance criteria of parts 11 and 12 of the Queensland Development Code, An application may trigger referral to the local government as the concurrence agency if the building work does not comply with the qualitative statement for building clearance and site cover. designated rainwater tank area For more information go to schedule 2 (able 1 of the IP Regulation and ihe QDC pant 25. Assessment period 1$ days. No response is a deemed refusal. deemed refusal, .| 19. An application may trigger referral to the local government as the concurrence agency if the building work does not comply with the qualitative statement for performance criteria 4, 5, 7, 8 or 9 of the Queensland Lous : : Development Code, part 11 or 12. : Fire safety in particular:-budget 20. An application may trigger referral to the local government as the concurrence agency to determine the accommodation buildings building will comply with the fire safety standard under the Building Act 1975 when the building work has For more’information‘go to schedule 2 table 1 of the been completed. IP. : ‘Assessment pesiod 15 days. No sesponse isa deemed refusal, 21. An application may trigger referrat to the local government as the concurrence agency to determine if the ic De building work More information go to-schedute 2 table 1 of the « — complies with the performance criteria of the Queensland Development code part 15; and -1P-Requtation and the QE pan 15. e the Work does not comply with an acceptable solution stated in the part. : AS days. No response is a , @ dees . , . i ing work for residential'service | 22. An application for building work for premises in which residential care service under the Residential ‘For more‘information go to-schedula 2 table t of the | | Services (Accreditation) Act 2002, section 4, is conducted, or is proposed to be conducted, will trigger IP Regulation and the QDC part 20. referral to the-local government as the concurrence agency. Assessment period 15 days. No! Tesponse is a deemed refusal, Building work for removal or 23. An application for the removal and/or rebuilding at another site of a building or other structure, will trigger rebuilding - referral to the loca! government as the concurrence agency. For more information go to schedule 2 table 1 of the 1P Regulation. ‘ ‘Assessment period 5 days. No response isa . deemed refusal, . Building work for rainwater tank in 24. An application may trigger referral to the local government as the concurrence agency to determine if the building work or structure complies with the relevant performance criteria if - « Under the Building Regulation 2006, a rainwater tank is proposed to be installed as part of relevant building work, in a designated rainwater tank area; and ¢ Under the Queensland Development Code, part 25; the rainwater tank does not include an acceptable solution for a relevant performance criteria.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2114 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.