SERVICES & ORGANISATION COMMITTEE MEETING AGENDA 6 NOVEMBER 2018
BRANCH ACTIVITIES RECENT ACHIEVEMENTS CURRENT PRIORITIES THE NEXT QUARTER
Park Road Boardwalk – supervise Successful completion of piling Boardwalk construction almost Complete construction of
project to ensure delivery on time and on works and boardwalk substructure. complete. boardwalk, additional works and
budget. handover.
Business as Usual activities Contracts awarded and construction Design of Noosa Parade corridor, Design for the Botanic Gardens
commenced for Mary River and Old Black Mountain Road, Bicentennial Shade structure.
Noosa Road Bridges. Drive car park, Peregian Beach Grant funding for Noosa Parade
Completed public consultation for amenities, boardwalk, Village corridor upgrade.
the Noosa Botanic Garden Shade Square, Musavale Road slip repair, Consultation for Peregian Beach
House. Gympie Terrace Stage 2 and Pacific amenities, boardwalk, Village
Design complete for Swan Avenue Avenue upgrades, O-Boat Square upgrades and renewals.
revetment wall, demolition of SLSQ
and Grosvenor Terrace stormwater Tender for Hilton Terrace corridor
drainage upgrades. building and Castaways Beach
upgrade Stage 1 works, Orealla
carpark upgrades.
Construction drawings issued for Crescent Bridge, and Noosa River
Read Park car park, Grosvenor Redevelopment of North Shore Holiday Park v-drain upgrades.
camp ground.
Terrace drainage upgrades. Delivery of Musavale Road slip
Construction complete for Maple Grant funding for Botanic Gardens repair, Pioneer Park playground,
Street Raised crossing, Main Beach Shade structure. Bicentennial Drive car park,
Boardwalk. Donnelly’s Road, Design support for Tewantin Bypass demolition of SLSQ building,
Station Street, Poinciana Avenue - Beckman’s Road, Cooroy Castaways Beach carpark and
and Moorindil Street roundabouts Connection Roads projects and Poinciana Avenue footpath stage 3
upgrades. Transport Strategy. upgrades.
Construction of drainage and Tendering for Poinciana Avenue
landscaping in Pioneer Park, footpath stage 3, Gympie Terrace
Cooran completed. stormwater drainage renewals and
Pioneer Park playground upgrade.
Delivery of Park Road Boardwalk,
Noosaville Library, Hilton Terrace
service relocations, Main Beach
Boardwalk landscaping, Mary River
and Old Noosa Road Bridges, Read
Park car park, Eenie Creek Road
wayfinding signage stage 2,
Grosvenor Terrace stormwater
drainage, Noosa River Holiday Park
amenities replacements and
upgrades
Page 53 of 97
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.