SERVICES & ORGANISATION COMMITTEE MEETING AGENDA 6 NOVEMBER 2018
BRANCH ACTIVITIES RECENT ACHIEVEMENTS CURRENT PRIORITIES THE NEXT QUARTER
Streetscape Plans - progressive Survey of Noosa Drive and Hastings Planning for the Noosa Drive and Concept development for Noosa
development of Streetscape Plans in Street precinct is underway. Hastings Street precinct is Drive and Hasting Street precinct.
accordance with the Noosa Design Design of the raised crossing in underway. Assess available base data for
Principles Maple Street Cooroy is complete. Reviewing base data available for Cooroy, Pomona, Noosa Junction
Pioneer Park, Cooran design and Cooroy, Pomona, and Noosa and Gympie Terrace precincts and
community consultation is complete. Junction and Gympie Terrace determine if additional survey is
precincts. required.
Designs progressing for: Collate and review background
o Cooroy Hinterland Playground information for each precinct.
car parking.
o Noosa Parade, Noosa Heads
o Peregian Beach boardwalk,
amenities and Village Square.
Cooroy Hinterland Playground – Management Plan developed Finalisation of masterplan and Undertake a Councillor’s Workshop
design and construct an iconic Final concept master plan delivery development of detailed designs. to present the preferred design for
playground. by consultant for approval. Issue Project Management Plan the playground.
Identification of emergent works and Assess project risks, benefits and Formalise stakeholder consultation
projects in surrounding area that budget plan and commence community
support the playground feedback sessions.
Market sounding to identify Finalise budgets for future design
organisations capable of delivering and delivery activities.
playground detailed designs and Finalisation of detailed designs.
construction, including bespoke
design elements
PTAIP DDA Bus stop compliance Designs have been completed for 7 Complete designs for remaining Issue remaining designs for
program – continued delivery of the bus stops, an additional 2 bus stop stops. construction.
program. designs are currently underway. Construction of 7 more bus stops to Tender remaining Bus stops for
Construction quotes are being be completed. construction.
sourced for 2 Leslie Dr Noosa
Heads bus stops and the Orient Dr
Sunrise Beach bus stop.
The David Low Way Castaways
Beach Bus stop has been
completed, with an additional David
Low Way Bus stop at 85% of
construction complete.
Page 52 of 97
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.