SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                                                                6 NOVEMBER 2018



BRANCH ACTIVITIES                     RECENT ACHIEVEMENTS                         CURRENT PRIORITIES                          THE NEXT QUARTER
Streetscape Plans - progressive        Survey of Noosa Drive and Hastings           Planning for the Noosa Drive and         Concept development for Noosa
development of Streetscape Plans in      Street precinct is underway.                   Hastings     Street   precinct   is        Drive and Hasting Street precinct.
accordance with the Noosa Design       Design of the raised crossing in               underway.                                Assess available base data for
Principles                               Maple Street Cooroy is complete.             Reviewing base data available for          Cooroy, Pomona, Noosa Junction
                                       Pioneer Park, Cooran design and                Cooroy, Pomona, and Noosa                  and Gympie Terrace precincts and
                                         community consultation is complete.            Junction and Gympie Terrace                determine if additional survey is
                                                                                        precincts.                                 required.
                                                                                      Designs progressing for:                 Collate and review background
                                                                                        o Cooroy Hinterland Playground             information for each precinct.
                                                                                           car parking.
                                                                                        o Noosa Parade, Noosa Heads
                                                                                        o Peregian Beach boardwalk,
                                                                                           amenities and Village Square.
Cooroy Hinterland Playground –         Management Plan developed                   Finalisation of masterplan and            Undertake a Councillor’s Workshop
design and construct an iconic         Final concept master plan delivery            development of detailed designs.            to present the preferred design for
playground.                              by consultant for approval.                 Issue Project Management Plan               the playground.
                                       Identification of emergent works and        Assess project risks, benefits and        Formalise stakeholder consultation
                                         projects in surrounding area that             budget                                      plan and commence community
                                         support the playground                                                                    feedback sessions.
                                       Market       sounding    to   identify                                                  Finalise budgets for future design
                                         organisations capable of delivering                                                       and delivery activities.
                                         playground detailed designs and                                                         Finalisation of detailed designs.
                                         construction, including bespoke
                                         design elements
PTAIP DDA Bus stop compliance          Designs have been completed for 7         Complete designs for remaining              Issue    remaining designs for
program – continued delivery of the       bus stops, an additional 2 bus stop        stops.                                        construction.
program.                                  designs are currently underway.          Construction of 7 more bus stops to         Tender remaining Bus stops for
                                       Construction quotes are being               be completed.                                 construction.
                                          sourced for 2 Leslie Dr Noosa
                                          Heads bus stops and the Orient Dr
                                          Sunrise Beach bus stop.
                                       The David Low Way Castaways
                                          Beach Bus stop has been
                                          completed, with an additional David
                                          Low Way Bus stop at 85% of
                                          construction complete.



                                                                                                                                                        Page 52 of 97
Log in to download the original file

2018-11-06 Services & Organisation Committee Agenda(PDF, 3MB).pdf · 3.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.