Skip to the record
Accept no substitutions.

Original source · versioned page text

2018-11-06 Services & Organisation Committee Agenda

of 97

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Page 88 of 97

OPERATIONAL PLAN 2018-19 PROGRESS REPORT

THE NOOSA COMMUNITY

No. Project                                                    Responsibility                          Breit                                                                              Status
1    Adoption of Cultural Plan and development of a 2019       Director Community Services             Final draft of Cultural Plan will be presented to Council for approval in        Ontrack    @&
     Action Plan                                                                                       November/December 2018

2    Adoption of Community Health and Wellbeing Plan and       Director Community Services             First draft of Community Health and Wellbeing Plan distributed to Reference      On track   @
     development of a 2019/20 Action Plan                                                              Group and key intemal stakeholders for comment

3    Begin construction of an iconic playground at Cooroy      infrastructure Planning, Design and     Detailed design underway                                                         On track   @
     following community consultation                          Delivery Manager
4    Complete Noosaville Library refurbishment                 Libraries & Galleries Manager           Construction complete, currently in defects management period. Library staff     On track   @
                                                                                                       have begun relocation.
5    Implementation of Sport and Active Recreation 2018/19     Director Community Services             2018/19 Sport and Active Recreation Plan actions commenced                       On track   ©
     Action Plan
6    Complete construction of Park Road Boardwalk Project      infrastructure Planning, Design and     Finishing touches are currently being reviewed and applied, focusing on          On track   @
                                                               Delivery Manager                        landscaping features, handrails and road surfacing.

                                                                                                                                                                                 Page 88 of 97
Log in to download the original file

2018-11-06 Services & Organisation Committee Agenda(PDF, 3MB).pdf · 3.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.