a. a 1.5-metre wide concrete pedestrian footpath within the road verge for the entire
length of the site’s frontage to Albert Street. The footpath’s width can be reduced (to
a minimum of 1.2 metres), only in locations where a 1.5-metre wide footpath would
impede on minimum clearances from services (i.e., light poles) or result in the
creation of trip hazards for pedestrians;
b. removal of the existing property accesses and reinstatement of the kerb, footpath and
verge area to match the balance of the site frontage, including the provision of topsoil
and turf where the existing verge is grassed;
c. the verge area is to include street trees in accordance with the Landscaping Works
and Retention of Existing Trees as part of this approval;
d. the provision of 6 on-street carparks as shown on the Approved Plans (as amended),
in a manner that does not disadvantage adjacent properties or the function and safety
of the local road network. All proposed 6 on-street carparks must be line marked in
accordance with AS2890.05, include a minimum width of 2.1m measured from kerb
invert and achieve a minimum separation of 1 metre between all driveway crossovers
and kerb tangents point to not disadvantage existing sight lines; and
e. the provision of 4 on-street motorbike parks as shown on the Approved Plans (as
amended), in a manner that does not disadvantage adjacent properties or the
function and safety of the local road network. All proposed 4 on-street motorbike
parks must be line marked in accordance with AS2890.05 and achieve a minimum
separation of 1 metre between all driveway crossovers and kerb tangent points to not
disadvantage existing sight lines.
Condition 37 (a, b, c, d, and e) are imposed pursuant to s145 of the Planning Act 2016
being non-trunk infrastructure.
Site Access and Driveways
38. A sealed access driveway must be provided from Thomas Street to the development. The
works must be undertaken generally in accordance with Arkos Architects, Ground Floor
Plan Traffic Engineer mark-ups as requested, drawing no. 2.02 XR2 dated 10 April 2026,
other than with respect to the motorcycle bays on Thomas Street noted to be removed, two
(2) of which must be retained.
39. A sealed exit driveway must be provided to Albert Street. The works must be undertaken
generally in accordance with Traffic Transport Plus, Swept Path (MRV 8.8m) – EGRESS,
Drawing number FIGURE F2, Revision 4, dated 16 April 2026 and Traffic Transport Plus,
Swept Path (MRV 8.8m) – EGRESS, Drawing number FIGURE F3, Revision 4, dated 16
April 2026.
Car Parking
40. 56 car parking spaces and 10 motorcycle spaces as shown on the Approved Plans (as
amended) must be provided and marked on the site. The works must be undertaken in
accordance with an Operational Works approval, generally in accordance with the
Approved Plans (as amended) and must include in particular:
a. 29 of the on-site car parking spaces (as set out on the Approved Plans, as amended)
shall be clearly marked as being for Short-term accommodation uses and shall be
accessible at all times. The balance of the on-site car parking spaces (as set out on the
Approved Plans, as amended) shall be clearly marked as being for Food and Drink
Outlet uses and shall be accessible at all times;
b. pedestrian routes in accordance with the conditions of this Decision Notice;
c. 1 disabled parking space/s within the total; and
d. dimensions, User Class, crossfalls and gradients in accordance with Australian
Standard AS2890: Parking Facilities.
Page 7 of 12 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.