2211-31930 SRA_Response with conditions_OPW22-0251
Attached to the e-mail OPW22/0251 - SRA application correspondence.
2211-31930 SRA
Attachment 1—Referral agency conditions
(Under section 56(1)(b)(i) of the Planning Act 2016 the following conditions must be attached to any development
approval relating to this application) (Copies of the documents referenced below are found at Attachment 5)
No. Conditions Condition timing
Development Permit – Operational work
10.17.3.1.1 – Tidal works or work in a coast management district—The chief executive administering
the Planning Act 2016 nominates the Director-General of Department of Transport and Main Roads to
be the enforcement authority for the development to which this development approval relates for the
administration and enforcement of any matter relating to the following conditions:
1. The revetment wall reconstruction and stabilisation of eroded backfill For duration of works
and foreshore terrace subgrade soils must be carried out generally in
accordance with the following plans:
(a) Site and general arrangement plan prepared by Long View
Consulting Engineers, dated May 2022, drawing number S010 and
revision P2 (as amended in red by SARA on 17 July 2023)
(b) General arrangement plan and details prepared by Long View
Consulting Engineers, dated Jan 2023, drawing number S020 and
revision P3
(c) Section and details prepared by Long View Consulting Engineers,
dated May 2022, drawing number S030 and revision P2.
2. Maintain the development in accordance with the plans referenced in At all times
Condition 1, and the requirements of any conditions included in this
referral agency response.
3. For the revetment wall reconstruction and stabilisation of eroded For the duration of the
backfill and foreshore terrace subgrade soils works, only use clean works
materials which are free from prescribed water contaminants.
4. Development must prevent the release of sediment to tidal waters. For the duration of the
works
5. Submit “As Constructed drawings” to [email protected] or mail Within 20 business
to: days of the completion
Department of Environment and Science of the works
Permit and License Management
GPO Box 2454
Brisbane Qld 4001
6. (a) In the event that the works cause disturbance or oxidisation of (a) Upon disturbance
acid sulfate soil, the affected soil must be treated and thereafter or oxidisation until
managed (until the affected soil has been neutralised or contained) the affect soil has
in accordance with the current Queensland Acid Sulfate Soil been neutralised or
Technical Manual: Soil management guidelines, prepared by the contained
Department of Science, Information Technology, Innovation and the
Arts, 2014.
(b) Submit certification from an appropriately qualified person on acid (b) At the time the
sulfate soil, confirming that the affected soil has been neutralised or soils have been
contained in accordance with (a) above to [email protected] neutralised or
or mail to: contained
Department of Environment and Science
State Assessment and Referral Agency Page 4 of 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.