Original source · versioned page text
2211-31930 SRA_Response with conditions_OPW22-0251
Attached to the e-mail OPW22/0251 - SRA application correspondence.
2211-31930 SRA
Permit and License Management
GPO Box 2454
Brisbane Qld 4001
Note: Appropriately qualified person(s) means a person or persons
who has professional qualifications, training, skills and experience
relevant to soil chemistry or acid sulfate soil management and can
give authoritative assessment, advice and analysis in relation to acid
sulfate soil management using the relevant protocols, standards,
methods or literature.
7. Remove and dispose of the existing access ramp at an appropriately Within three months of
licenced facility that accepts such waste. commencement of the
demolition
10.6.3.3.1.1 – Operational work involving marine plants— The chief executive administering the
Planning Act 2016 nominates the Director-General of Department of Agriculture and Fisheries to be
the enforcement authority for the development to which this development approval relates for the
administration and enforcement of any matter relating to the following conditions:
8. Development is limited to permanently remove, damage, destroy At all times
marine plants within 22.5m2 as shown in Table 1: Permanent impacts
to marine plants and Figure 2: Proposed marine plant impacts at
Catalina Jetty of the report titled Marine Plant Assessment – Catalina
Jetty, Gympie Terrace, Noosaville Retaining Wall Upgrade prepared
by Native Foresters, dated 27th April 2023 and document no 230427
(as amended in red by SARA on 17 July 2023).
9. Development is limited to temporarily remove, damage, destroy At all times
marine plants within 209.15 m2 as shown in Table 2: Temporary
impacts to marine plants and Figure 2: Proposed marine plant
impacts at Catalina Jetty of the report titled Marine Plant Assessment
– Catalina Jetty, Gympie Terrace, Noosaville Retaining Wall
Upgrade prepared by Native Foresters, dated 27th April 2023 and
document no 230427 (as amended in red by SARA on 17 July 2023).
10. The revetment reconstruction and sediment stabilisation must be At all times
carried out generally in accordance with the following plans:
(a) General Arrangement Plan and Details prepared by Long View
Consulting Engineers, dated Jan 2023, drawing number S020 and
revision P3
(b) Sections and Details prepared by Long View Consulting
Engineers, dated May 2023, drawing number S030 and revision P2.
11. Maintain the development in accordance with the plans referenced in At all times
condition 10, and the requirements of any conditions included in this
referral agency response.
12. Submit written notice to the Department of Agriculture and Fisheries (a) At least 5 business
at [email protected] advising when the development days but no greater
authorised under this referral agency response: than 20 business days
prior to the
(a) will start commencement of the
works
(b) when it has been completed.
(b) Within 15 business
Any notice must state the application’s reference number: 2211- days of the completion
31930 SRA. of the fisheries
development works
13. Spoil is not disposed of on tidal lands or within waterways and is At all times
State Assessment and Referral Agency Page 5 of 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.