15010_Noosa Council_Decision Notice_221215 · OPW18/0022

Attached to the e-mail Operational Works Application OPW18/0022 - 279 Gympie Terrace, Noosaville.

of 25

Text shows just the words. Original shows the document exactly as it was published.

Original PDF page 3, section 1. The text section number identifies this passage in the reader.

                                                                                                          OPW15/0172


                              e.       Other relevant parties
                      4.      A Construction Management Plan must be submitted to Council for approval a
                              minimum of 5 working days prior to the pre-start meeting and must specifically
                              address the following:
                              a.       Traffic Management during all aspects of the construct phase including:
                                       i. A Traffic Management Control Plan in accordance with Manual of Uniform
                                            Traffic Control Devices (MUTCD) detailing all temporary signage and
                                            traffic control measures prior to construction
                                       ii. Maintenance of safe pedestrian access across the frontage of the site
                                             both during daily construction and after daily construction has ceased
                                       iii. Proposed fencing to the site during the construction phase of the
                                              development
                                       iv. Adequate parking arrangements for construction workers. The carparking
                                             spaces on the river side of Gympie Terrace must not be used by
                                             construction workers.
                                       v. Adequate parking arrangements for the deliveries to the site. The
                                            adjacent “Loading Zone” in the frontage of No 287 Gympie Terrace
                                            must not be used for deliveries to the site and must remain available
                                            for deliveries to local businesses. Please note Council may permit the
                                            private use of the 2 on-street spaces in the frontage of the site for the
                                            duration of the works. A separate application Road and Footpath
                                            Permit is required.
                                       vi. No queuing of trucks is permitted on residential streets, especially prior to
                                             7.00am. Further parked trucks must have engines turned off.
                              b.       Maintenance and protection of water quality and existing drainage lines
                                       through the construction site through the implementation of appropriate
                                       erosion and sediment control measures
                              c.       Works programme identifying key components of the works and their
                                       respective durations
                              d.       Establishment of a communication protocol with the general public, adjoining
                                       owners, emergency services and local businesses to advise of agreed
                                       construction times, impacts on traffic and services and other relevant issues
                              e.       identification of complaint management procedures including:
                                       i. contact details for the on-site manager
                                       ii. dispute resolution procedures
                              f.       For haulage operations involving significant volumes of fill material or
                                       excavated material being transported onto or off the site: details on the
                                       location of external fill sites/sources, the haulage route, type of vehicle to be
                                       utilised during filling operations and frequency of usage. NB any damage to
                                       the existing road system as a result of haulage operations shall be fully
                                       repaired at the applicant’s expense
                      5.      Tree protection fencing must be installed under the supervision of the Project
                              Arborist. (Refer to Retention of Existing Trees Conditions)




                                                                                                                Page 3 of 14


Document Set ID: 20003332
Version: 1, Version Date: 22/12/2015                                                                  Print Date: 22 December 2015, 3:18 PM

Used in these records

About this file

File size
4.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

15010_Noosa Council_Decision Notice_221215.pdf · 4.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.