OPW15/0172 e. Other relevant parties 4. A Construction Management Plan must be submitted to Council for approval a minimum of 5 working days prior to the pre-start meeting and must specifically address the following: a. Traffic Management during all aspects of the construct phase including: i. A Traffic Management Control Plan in accordance with Manual of Uniform Traffic Control Devices (MUTCD) detailing all temporary signage and traffic control measures prior to construction ii. Maintenance of safe pedestrian access across the frontage of the site both during daily construction and after daily construction has ceased iii. Proposed fencing to the site during the construction phase of the development iv. Adequate parking arrangements for construction workers. The carparking spaces on the river side of Gympie Terrace must not be used by construction workers. v. Adequate parking arrangements for the deliveries to the site. The adjacent “Loading Zone” in the frontage of No 287 Gympie Terrace must not be used for deliveries to the site and must remain available for deliveries to local businesses. Please note Council may permit the private use of the 2 on-street spaces in the frontage of the site for the duration of the works. A separate application Road and Footpath Permit is required. vi. No queuing of trucks is permitted on residential streets, especially prior to 7.00am. Further parked trucks must have engines turned off. b. Maintenance and protection of water quality and existing drainage lines through the construction site through the implementation of appropriate erosion and sediment control measures c. Works programme identifying key components of the works and their respective durations d. Establishment of a communication protocol with the general public, adjoining owners, emergency services and local businesses to advise of agreed construction times, impacts on traffic and services and other relevant issues e. identification of complaint management procedures including: i. contact details for the on-site manager ii. dispute resolution procedures f. For haulage operations involving significant volumes of fill material or excavated material being transported onto or off the site: details on the location of external fill sites/sources, the haulage route, type of vehicle to be utilised during filling operations and frequency of usage. NB any damage to the existing road system as a result of haulage operations shall be fully repaired at the applicant’s expense 5. Tree protection fencing must be installed under the supervision of the Project Arborist. (Refer to Retention of Existing Trees Conditions) Page 3 of 14 Document Set ID: 20003332 Version: 1, Version Date: 22/12/2015 Print Date: 22 December 2015, 3:18 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
15010_Noosa Council_Decision Notice_221215.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.