15010_Noosa Council_Decision Notice_221215 · OPW18/0022

Attached to the e-mail Operational Works Application OPW18/0022 - 279 Gympie Terrace, Noosaville.

of 25

Text shows just the words. Original shows the document exactly as it was published.

Original PDF page 4, section 1. The text section number identifies this passage in the reader.

                                                                                                     OPW15/0172


                      6.      All necessary approvals from external service providers (eg Unitywater) and
                              external parties on which the development works are proposed have been
                              obtained and a copy supplied to Council.
                      7.      A condition report including photographs of the frontage of the site must be
                              completed and submitted to council at the prestart meeting / prior to any works
                              commencing.
                      8.      Certificates demonstrating currency of public liability insurance and works
                              insurance covering the works must be submitted to Council at the prestart meeting.
                      9.      Any changes to the details associated with the supervising RPEQ or Principal
                              Contractor during construction, must be notified to council in writing within five
                              business days of the change occurring.
                      10.     Any conflict between the development and an existing or proposed service must be
                              referred to the relevant service authority for determination prior to commencement
                              of works.
                      DURING CONSTRUCTION
                              Engineering
                      11.     The developer must meet any costs to repair damage to any Council asset during
                              construction, where damage is a result of the development works. Damage to
                              assets must be repaired immediately where it creates a hazard to the community.
                              In circumstances where the damage does not create a hazard to the community, it
                              must be repaired immediately on completion of the works associated with the
                              development.
                      12.     All works must be supervised by a Registered Professional Engineer of
                              Queensland (RPEQ) who is independent of the Developer and Principal
                              Contractor, and they must certify that all works conform to the Operational Works
                              permit. Where municipal works are involved, such confirmation must be submitted
                              for the respective hold points prior to any site inspection by Council Officers.
                      13.     All works must be constructed and work procedure undertaken in accordance with:
                              a.       The approved plans/documents and conditions detailed in this Decision
                                       Notice
                              b.       The relevant conditions of the higher order Material Change of Use approval
                                       viz. MCU15/0014 to which this approval relates
                              c.       All relevant Noosa Council Planning Scheme Policies, standard drawings,
                                       standard specifications and guidelines
                              d.       The latest version of the Healthy Waterways document “Water Sensitive
                                       Urban Design Technical Design Guidelines for South East Queensland” for
                                       all water quality devices to be constructed on site
                              Pavement Design and Construction
                      14.     Pavement design for privately owned works must be undertaken in accordance
                              with the relevant standards. Structural integrity of the driveway and car park areas
                              will remain the responsibility of the property owner/developer and must be certified
                              by an RPEQ.




                                                                                                           Page 4 of 14


Document Set ID: 20003332
Version: 1, Version Date: 22/12/2015                                                             Print Date: 22 December 2015, 3:18 PM

Used in these records

About this file

File size
4.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

15010_Noosa Council_Decision Notice_221215.pdf · 4.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.