Original source · versioned page text
ECM_16338140_v1_TPC 2851 - Town Planning Consent Permit pdf
Town Planning Consent Permit - TPC 2851 Page 3 10. il. 8.2 Payment may be deferred to a date:- 8.2.1 prior to Council sealing plans of the development for titling purposes; 8.2.2 prior to the issue of a Certificate of Classification for any building approved under this application; or 8.2.3 prior to commencement of the approved use at the relevant premises; whichever is the sooner. Payment of deferred headworks contributions shall also be subject to the following requirements:- 8.2.4 Submission of a trading bank guarantee to the value of headworks assessed at the time prescribed by the Local Government (Planning and Environment) Act 1990, plus 20%, prior to Building Approval; 8.2.5 Headworks shall be calculated as the value of headworks assessed at the time prescribed by the Local Government (Planning and Environment) Act 1990, plus interest charged at the rate set by the Queensland Treasury Corporation for Local Government borrowings as they apply to Noosa Shire. The interest rate used shall be the rate current at the "time prescribed" above; 8.2.6 Should the contributions not be paid at the due time, Council shall call upon the security lodged; and 8.2.7 in the case of a building permit, if a permit expires the securities held will be returned. The footpath across the Garnet Street frontage of the site is to be upgraded by the provision of a 1.2 metres wide concrete footpath and the forming, grassing and topsoiling of the remaining area to the standards and requirements of the Shire Engineer. The applicant is to contact Council's Engineering Department to determine the footpath alignment prior to the commencement of any works. The developer shali bear the cost of alteration of any public utility or other facilities necessitated by the development of the land or associated construction works external to the site. Connection to Council's existing water supply and sewerage reticulation systems at the developer's expense to the standards and requirements of Council's Shire Engineer.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.