Skip to the record
Accept no imitations.

Original source · versioned page text

ECM_16338140_v1_TPC 2851 - Town Planning Consent Permit pdf

of 4

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Town Planning Consent Permit - TPC 2851 Page 3

10.

il.

8.2 Payment may be deferred to a date:-

8.2.1 prior to Council sealing plans of the development for
titling purposes;

8.2.2 prior to the issue of a Certificate of Classification for
any building approved under this application; or

8.2.3 prior to commencement of the approved use at the
relevant premises;

whichever is the sooner. Payment of deferred headworks
contributions shall also be subject to the following requirements:-

8.2.4 Submission of a trading bank guarantee to the value of
headworks assessed at the time prescribed by the Local
Government (Planning and Environment) Act 1990, plus
20%, prior to Building Approval;

8.2.5 Headworks shall be calculated as the value of headworks
assessed at the time prescribed by the Local Government
(Planning and Environment) Act 1990, plus interest
charged at the rate set by the Queensland Treasury
Corporation for Local Government borrowings as they
apply to Noosa Shire. The interest rate used shall be the
rate current at the "time prescribed" above;

8.2.6 Should the contributions not be paid at the due time,
Council shall call upon the security lodged; and

8.2.7 in the case of a building permit, if a permit expires the
securities held will be returned.

The footpath across the Garnet Street frontage of the site is to be upgraded
by the provision of a 1.2 metres wide concrete footpath and the forming,
grassing and topsoiling of the remaining area to the standards and
requirements of the Shire Engineer. The applicant is to contact Council's
Engineering Department to determine the footpath alignment prior to the
commencement of any works.

The developer shali bear the cost of alteration of any public utility or
other facilities necessitated by the development of the land or associated
construction works external to the site.

Connection to Council's existing water supply and sewerage reticulation
systems at the developer's expense to the standards and requirements of
Council's Shire Engineer.
Log in to download the original file

ECM_16338140_v1_TPC 2851 - Town Planning Consent Permit pdf.pdf · 133 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.