Skip to the record
For the highest quality transcripts.

Original source · versioned page text

ECM_16338140_v1_TPC 2851 - Town Planning Consent Permit pdf

of 4

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Town Planning Consent Permit - TPC 2851 Page 4

12.

13.

14.

15.

16.

17.

18.

19,

The developer shall provide metered water connections from the water
supply system to the proposed development, in accordance with Council's
standards and to the satisfaction of the Shire Engineer.

Roof and surface water is to be collected on site and is to be discharged
through a single underground drain line into existing drainage in Garnet
Street to the satisfaction of the Shire Engineer. A Building Approval shall
not be granted until the Shire Engineer has approved of the drainage
scheme.

Provision of approved refuse containers in accordance with the
requirements of the Refuse Management Regulations of 1983 for the
storage and collection of refuse to the satisfaction of Council's Health
Surveyor.

Any flat or unit intended to be let out for fee or reward is to be licensed
annually with Council's Health Department in accordance with the
provisions of Chapter 43 of Council's By-Laws prior to such letting.

Submission of a cash bond or trading bank guarantee to the sum of
$4000.00 to secure performance of conditions, prior to the issue of
Building Approval. The cash bond or trading bank guarantee will be
returned upon performance of the conditions of approval.

The provisions of this approval are to be effected, prior to the
commencement of the approved use. Council reserves the right to call
upon the bond or guaranteed sum referred to in this approval to effect
compliance with conditions.

The Town Planning Consent Permit may be revoked pursuant to Section
4.14 of the Local Government (Planning and Environment) Act if
commencement of erection or works have not been made in accordance
with that Permit or the rights conferred by that Permit are not exercised
within two (2) years of the date of issue of the Permit.

The Town Planning Consent Permit lapses where:-

19.1 the use or erection of a building or other structure associated with
the use, has not been commenced within four (4) years of the date
of issue of the Town Planning Consent Permit, unless application is
made and approved by Council for an extension; or

19.2 the use of any premises pursuant to the Town Planning Consent
Permit ceases for a period of twelve (12) months.
Log in to download the original file

ECM_16338140_v1_TPC 2851 - Town Planning Consent Permit pdf.pdf · 133 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.