Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

2019-11-18 General Committee Agenda

of 38

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA   18 NOVEMBER 2019


                                                        Attachment 3




                                        Page 18 of 38

GENERAL COMMITTEE MEETING AGENDA                                                                                      18 NOVEMBER 2019

                                                                                                                                                                                                                   Attachment 3
                     Noosa Shire Council
                     2019/20 Capital Budget Review 2 - Capital Program
                     Renewal Projects
                     La)                                   Be aia                                                                      betes Me Ba)           ea            Me)             General Rates         ares |
                     Capital Works                                                                                                   Pree ers        PS                           -$185,007    $14,721,064       IATL

                    Coastal Canals and Waterways 4        | Beach Access Shower Renewal Claude Batten Deve:                                                                                      $45 88D        $45,980 |
                    ‘Coastal Canais and Waterways         | Disaster Resiliance Fund Tide Gauges and Flood Forecasting System 0        45.00                                                      80,000)       $95,000,
                    Coastal Canalis and Waterways =        Renewal of revetment wall at O-Boats Gymple Toe                                                                                       88707          $17,707
                    ‘Community Faciiites 000              Community Factities Minor SSB ATE                                                                                                                    $184,418
                    ‘Community Facilites                Ns aville Wallace House Resting                                                                                                          885000         $85,000
                    ‘Community Facilities oo               Peregian Beach Surf Club Roof Replacement                                                                                            SAID           $164,412,
                    ‘Community Facilities ==              Sunshine Beach NAC -25m AMP Pool Renewal Program                                                                                       828000          $25,000

                    ‘Community Facilities =               Sunshine Beach NAC - Regrout/ Recaulk ang Replace Tiles (50m Poot)                                                                     88D            $65,000
                    ‘Community Facilities                 Sunnie Beach NAC - Roof Replacement                                                                                                    $228 65D      $228,650
                    ‘Community Facilities                  NAC 25m,50m and Leisure Pool Earthing System                                                                                          $150,000)     $150,000
                    ‘Community Facilities                  NAC Replacement of Lignt Pole Fittings                                                                                  858,500
                    ‘Community Facilities =             Na Lelsure Centre Replacement of Ventiation Fans 0                                                                                        80,000)       $30, 000
                    Gravel Road Network                   Shir Gravel Resheeting - Annual Program                                                                                                $410,000      $410,000
                    Loranes&Gallenes                     Cry Butter Factory Ars Centre (Tne Pottery) Louvre Replacement:                                                                         8500           $15,000
                   ioranes&Gallenes                     Ns ville Library Returbismmemt                                                                                                           880,000        $30,000

                    PublicAmenties 8                       Reregian Beach Public Amenities Renewal Comstmuction                                                                              SETS              $594,215,
                    ‘Public Transpor infrastructure       Shine Bus Smelter Disabled Compliant Program: Year 00                      SSO                                                         $250,009      $500,000
                    Sealed Roads Network                  Black Mountain Road Prionty Sectons Road Reconstruction (Hinterland Prionty) 0 SBS227E                                                  BSB         $1,918,214
                    Sealed Roads Network                  Directional Signage Walter Hay Onve Roundabouts and Reet Street                                                                         82653          $26,533,
                    ‘Sealed Roads Network                 Shire Ker & Cannel Renewal Program                                                                                                    $100,000)      $100, 000
                    ‘Sealed Roads Network                 | Damaged Guardrall Renewals (Various)                                                                                                  89,800)       $51, 800
                    ‘Stormwater Drainage                NS VITIe Gympie Terrace Stormwater Renewals                                                                                             BST           $1,184,831
                    ‘Stormwater Drainage                  Shire Bloretention Basin Renewals Program:                                                                                             $80,000        $80,000
                    ‘Stormwater Drainage                  Shire Pit Structure Remewel rogram                                                                                                    $180,000       $150,000
                    ‘Streetscapes and Road Comidors =      Gorge Pearce Memorial Bench and Parkyn Hut Sign Renewal                                                                               88S            $14 15
                   ‘Transport and infrastructure Management __—__| Castaways Beach, David Low Way Safety and Comidorimprovement: 0                                                                   995        $81,995,
                    Transport and infrastructure Management _—__| Noosaville Gympie Terrace Corrddor Renewal Stage 200         888208832, $74,000
                    Transport and infrastructure Management Shire Forward Planning & Design Program Construction Ready DesigmS                                                                    800,000      $300,000
                    Transport and infrastructure Management Sunshine Seach Pacific Avenue Pathway, Pedestrian 8 Draimage                                                                       SA               $28
                    ‘Transport and infrastructure Management | Tewanttn Hilton Terrace & Ernest St Intersection Upgrade Constructon: $487 SOD        $80,000)                                  83,100,476     $3,617,976 |
                    ‘Waste Management = =| Pomona Waste Transfer Station Resurfacing:                                                                                            8 9380,000)                   $130,000

                                                                                                                                 Page 18 of 38
Log in to download the original file

2019-11-18 General Committee Agenda(PDF, 2MB).pdf · 2.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.