Skip to the record
The only place to find full transcripts.

Original source · versioned page text

2019-11-18 General Committee Agenda

of 38

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA   18 NOVEMBER 2019




                                        Page 19 of 38

GENERAL COMMITTEE MEETING AGENDA                                                                   18 NOVEMBER 2019

    aa                                  ee ag                                                                       Grants  ExtemaiFunds   Levy Reserves Other Reserves  cere el)              arr
  Other Capital                                                                                                                                                              pre Bla      tye el

 Fieet-PlantReplacement                Council Fieetand Plant Replacement Program                                                                                           51 255.088     $1.254,088
  eet                                                                                                            yee               $30,000                     Se           ieee!         $19,375,837

  Upgrade, New and Expansion Projects
 Item                                     oe ale                                                                    Grants  ExtemaiFunds   Levy Reserves OtherReserves   General Rates         afer
  ee                                                                                                             ras ess)         $200,000      bra               ars        ea            $9,258,403
‘Commercial Land & Property —=S*«éeregian Beach S Rufous St Redevelopment Stage 3Consiructon +...        | $igi3638                    |                             |     $4,759,109     $9,372,746
 Holday Parks —S*~*~*~*~*SCN                NOI Shoe BeCNONt Campground Redevelopment    .+=—=~=~*~S~*é=“‘“‘*~*S*S*S*S”S”S”S™S™*C™*™*C~C‘“~*‘“‘“‘*;*‘“*‘“*‘“‘*“*S*™SSSTSTSSCSCSC‘“s*é“*~*‘“‘“*SC*S CBDR S*«*SD BS
__ Libraries & Galleries             Cry Butter Factory Roof & Gutter Upgrage                                                                                                 8880           $88,000
 ‘Parks & Playgrounds                Crain Pioneer Park Facilities Upgrate                                                                                                   8ST             $65,000
 ‘Parks & Playgrounds                Cry Hinteriand Playgroum                                                SS                                                               ES            $321,527
 ‘Parks & Playgrounds                  Lak Macdonald Botanic Garden Shade House                                                  800                                         $167,602       $ 367,602
 ‘Parks & Playgrounds                    regan Beach Town Square Upgrade Planning & Design                                                                                    $05,890)       $13,890
 ‘Pathways & Boardwaiks                NO   ville Sea Eagle Drive & Shire Drive Pathway Upgrades                   KOO                                                       $920,000       $174,000
 ‘Pathways & Boardwaiks 0               Teewantin, Hilton Terrace CNLGGP Shared Patoway                                                                                        8078          $18,074
 ‘Pathways & Boardwaiks              Naa Districts Sports Complex Internal Road and Pathway Network                                                                           880,009        $50,000
 ‘Sealed Roads Network                Breen Point Tewah St Gravel Road Seat                                                                                                  $280,000       $250,000
 ‘Sealed Roads Network                Breen Point, Hector Street Road widening amd SC                                                                                          887000        $87,000
 Sealed Roads Network                  Pomona, Ambulance Street Sealing of Gravel Section:                                                                                   $200,000)      $200,000
 ‘Stormwater Drainage                Ns aville Project Ave Stormwater Drainage Easement Upgrade                                                                               880,000        $50,000
 ‘Transport and infrastructure Management _—_—_| Beckman's Road Interchange Upgrade                                                                                            80,000        $50,000
 ‘Waste Management =                   N00 Heads “The Woods" Bin Storage Enclosure,                                                                            89108,000                    $100,000
 ‘Waste Management  =                NS ville Eurnundi Rd Transfer Station Sealing of Gravel Road                                                             8885000                       $135,000
 Waste Management.                     Ns ville Eurnundll Road Landfill Design Stormwater Controts tor Cem 23     OOOO                          eH                                         822802
  Other Capital                                                                                                    yore)                                                     Terr s        ye> ETF)
 Information Technology =               Technology One Cl Anywhere Systems implementation:                                                                                   $908,797       $906,717
 ‘PianningScneme                         imate Change Adaptation Plan Develomentand implementation: 0             SBS SOD                                                   8S $252,905
 ‘Planning Seneme                    N88 Rr Hyer                                                                                                                              $ID            $34,910
 PianningScneme                       Sire Planning Scneme Comsumancy                                                                                                        $1862          $136,142
 ‘PianningScneme                       Shire Project Place Based Approach - Placemaking Pilot Programm                                                                        900,000)      $100,000
‘PianningScheme                       Sire Project Team Materials 8 Services                                                                                                 $6852           $46,952
 PianningScheme                        She Project Team Resources forNew Planning Scheme                                                                                     888048)        $581,048
 Planning Scheme                       Stormwater Backflow Climate Change Vulnerability Assessment                                                                             55287          $5,287
  Grand Total                                                                                                    SAE eA           $200,000      $200,000       $508,020      $7,568,976   $11,496,764

                                                                                                              Page 19 of 38
Log in to download the original file

2019-11-18 General Committee Agenda(PDF, 2MB).pdf · 2.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.