GOOD SHEPHERD LUTHERAN COLLEGE ODYSSEY CONSULTING GROUP
Lot 30 on SP170751 Conceptual Stormwater Management Plan
115 Eumundi Noosa Road, Noosaville Project No: K4277
Table 2: Pre Development Coefficients of Runoff
Catchment 2 5 10 20 100
A 0.60 0.67 0.70 0.74 0.84
Time of Concentration
To calculate the time of concentration for the internal catchment the Friends Equation (tc =
(107nL0.333)/S0.2) from QUDM has been applied for overland sheet flow with the remaining distance
calculated as concentrated flow. Please refer to Table 3 for the calculated time of concentration.
Table 3: Pre Development Time of Concentration
Time of concentration
Catchment Catchment Concentrated
Catchment Overland flow flow
Area (m2) Properties Total tc
Friend’s Equation QUDM Figure
4.09
Open Horton’s (n) =
Space/parks – 0.045
A 5,014 Light cover L = 90 m n/a 12.50 min
bushland / poor Slope = 4.38%
grass cover t = 12.5 min
Design Flow Rates
Design storm flow rates have been calculated for standard storms with an ARI of 2, 5, 10, 20, 50 and
100 years for the pre development case using design rainfall intensities from the Bureau of
Meteorology Rainfall IFD Data System. The Rational Method (Q = 2.78 x 10-3 CIA) has been used to
calculate the required design flow rates for the subject site. The calculated pre development peak
flows for the subject site are presented in Table 4.
Table 4: Catchment A - Pre Development Internal Catchment Peak Flow Rates
Average Recurrence
ARI 2 5 10 20 100
Interval
Coefficient of Runoff C 0.60 0.67 0.70 0.74 0.84
Average Rainfall Intensity
I 114.91 142.10 157.53 178.98 228.29
(mm/h)
Area of Catchment (ha) A 0.501 0.501 0.501 0.501 0.501
Peak Flow Rate (m3/s) Q 0.095 0.132 0.154 0.183 0.267
3.3 Post Development
Catchment Definition and Lawful Point of Discharge
The post development scenario consists of three internal catchments that convey the stormwater to
the south and west of the site. Catchment A & Catchment B will discharge into existing Council
stormwater infrastructure on Walter Hay Drive on the southern corner of the site. Catchment C will
remain mostly unchanged due to the existing vegetation and will continue to discharge to Council
stormwater infrastructure on Walter Hay Drive. These discharge points represent the Lawful Points of
Discharge (LPOD) for the site.
The post development catchment areas and lawful points of discharge are shown on the Odyssey
Consulting Group, Post Development Catchment Plan (Ref: K4277/P006/E) included as Appendix D.
K4277-0002-E 18 June 2019 Page 4 of 14
Document Set ID: 20894174
Version: 1, Version Date: 03/07/2019
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approved Plans - MCU18-0097.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.