Design Flow Rates
Design storm flow rates have been calculated for standard storms with an ARI of 2, 10, 20 and 100
years for the external catchments using design rainfall intensities from the Bureau of Meteorology.
The Rational Method (Q = 2.78 x 10-3 CIA) has been used to calculate the design flow rates.
The peak flows for the external catchments are presented in Table 12.
Table 12: External Catchment A Peak Flow Rates
Average Recurrence Interval ARI 2 5 10 20 100
Coefficient of Runoff C 0.60 0.67 0.70 0.74 0.84
Area of Catchment (ha) A 0.045 0.045 0.045 0.045 0.045
Average Rainfall Intensity (mm/h) I 121.1 149.7 166.0 188.6 240.5
Peak Flow Rate (m3/s) Q 0.009 0.012 0.015 0.017 0.025
External Catchment Channel Conveyance
External Catchment A
External Catchment A currently discharges stormwater through the site. Flows from External
Catchment A will be captured in a field inlet in the subject site’s north eastern corner and conveyed to
Council stormwater infrastructure on the north western boundary. For details and locations of the
proposed field inlet refer to Odyssey Consulting Group, Stormwater Management Plan (Ref:
K4277/P007/G) included as Appendix F.
4.0 STORMWATER DETENTION
The development of land will potentially increase peak flow rates from the subject site due to
increased impervious areas and a reduced critical time of concentration. The following section
provides preliminary details of an onsite detention system ensuring there will be no adverse impacts
associated with the increased runoff rate on downstream properties and infrastructure.
4.1 Objective
In accordance with Urban Stormwater Quality Planning Guidelines 2010 (DERM USQG) the following
objective has been set for stormwater discharge from the site and proposed development:
No net increase in peak flows from the subject site for all events up to the Q100 storm event
during the post developed condition.
This objective shall be achieved by detaining site runoff within a detention tank located within the
development.
4.2 Hydraulic Model
A calculation of the required detention volume to mitigate any increase in total site discharge rates
has been made using the DRAINS software programme.
DRAINS modelling has been adopted at the preliminary planning stage to ensure that the detention
tank volume is estimated with a higher degree of confidence. As finished site levels and internal pipe
levels are still approximate, this initial calculation is an estimate but is accurate enough to progress
the design with confidence.
The DRAINS model comprised of three post development Catchments. Catchment A and B flows shall
be directed towards existing stormwater infrastructure located in Walter Hay Drive via a detention
tank. Catchment C will remain unchanged and will discharge flows towards existing stormwater
infrastructure located in Walter Hay Drive.
K4277-0002-E 18 June 2019 Page 7 of 14
Document Set ID: 20894174
Version: 1, Version Date: 03/07/2019
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approved Plans - MCU18-0097.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.