GOOD SHEPHERD LUTHERAN COLLEGE ODYSSEY CONSULTING GROUP
Lot 30 on SP170751 Conceptual Stormwater Management Plan
115 Eumundi Noosa Road, Noosaville Project No: K4277
The 2, 10 and 100 year ARI storm events were analysed for all standard durations ranging from 10
minutes to 180 minutes. It was determined that the 25 minute storm is the critical duration for the
peak site discharge for both the pre development and post development scenarios. The combined
peak discharge rates for the site calculated by the DRAINS model is shown below for both scenarios.
Table 13: Peak Discharge Rate for Site (m3/s)
Q2 Q10 Q100
Pre Development 0.104 0.169 0.277
Post Development (unmitigated) 0.163 0.264 0.427
As the development will increase peak discharge rates from the site, onsite detention will be required
to attenuate runoff to pre development levels.
4.3 Detention Volume
The following detention storage parameters were found to achieve the target mitigated pre
development flow rates:
Table 14: Detention Tank A Parameters
Detention Tank Base Surface Area 60 m2
Detention Tank Top Surface Area 60 m2
Detention Tank Invert Level 7.70 m
Detention Tank Height (including 300mm freeboard) 2m
Low Flow Outlet Orifice (at invert of detention tank) 240 mm
Mid Flow Orifice Diameter (at 0.63 m above invert of
120 mm
detention area)
High Flow Weir (at 1.58 m above invert of detention
1.8 m
tank)
Detention Volume (not including freeboard) 100 m3
The 25 minute design storm was the critical storm event for determining the required volume within
the tank. A comparison of the pre development, post development and mitigated flow rates based on
the above arrangement is shown in Table 15 followed by the hydrograph in Figure 3 for the critical
duration of the Q100 storm event.
Table 15: Comparison of Pre Development, Post Development and Mitigated Flow Rates for Catchment B
Average Recurrence Interval 2 10 100
DRAINS Pre Development Flow Rate m3/s 0.104 0.169 0.277
DRAINS Post Development Flow Rate
m3/s 0.163 0.264 0.427
Catchment A Q100
DRAINS Mitigated Development Flow Rate m3/s 0.104 0.168 0.274
K4277-0002-E 18 June 2019 Page 8 of 14
Document Set ID: 20894174
Version: 1, Version Date: 03/07/2019
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approved Plans - MCU18-0097.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.