GOOD SHEPHERD LUTHERAN COLLEGE ODYSSEY CONSULTING GROUP
Lot 30 on SP170751 Conceptual Stormwater Management Plan
115 Eumundi Noosa Road, Noosaville Project No: K4277
Figure 3: Mitigated Post Development Catchment Q100 Flow Rates (25 minute Storm)
Catchment A will be collected by a detention tank to mitigate flows to less than that of the pre
development scenario and will discharge to a LPOD on Walter Hay Drive. With reference to Figure 3
the detention arrangement can be seen to effectively mitigate the post development flows in all
storm events for the proposed site.
The hydraulic analysis using the DRAINS model has determined that a minimum of 100 m3 of storage
is required for runoff attenuation and is to be provided in the form of a detention tank located within
the proposed car park area. Refer to Odyssey Consulting Group, Stormwater Management Plan (Ref:
K4277/P007/G) and Odyssey Consulting Group, Stormwater Detention and Bio Retention Details (Ref:
K4277/P010/E) included as Appendix F, for details of the tank arrangement, indicative location and
preliminary stormwater layout. The final location onsite and construction levels will be determined at
detailed design stage.
A copy of the DRAINS model used in this report can be made available to Council upon request.
5.0 WATER QUALITY ASSESSMENT
5.1 Background
The development of land has the potential to increase the pollutant loads within stormwater runoff
and downstream watercourses.
During the construction phase of the development disturbance to the vegetation on the site has the
potential to significantly increase sediment loads entering downstream watercourses. The operational
phase of the development will increase the density of residential land use potentially increasing the
amount of sediments and nutrients washing from the site.
The following sections describe the predicted increase in pollutant loads generated by the proposed
development and treatment devices to mitigate the potential increases. In accordance with industry
guidelines suspended solids, nitrogen and phosphorus will be targeted for reduction during the
operational phase of the development.
5.2 Water Quality Objectives
To protect the water quality of the downstream watercourses the following water quality objective
has been applied to stormwater runoff from the site in accordance with State Planning Policy. The
following load reduction targets must be achieved when assessing the post-developed sites treatment
train (comparison of unmitigated developed case versus developed mitigated case):
K4277-0002-E 18 June 2019 Page 9 of 14
Document Set ID: 20894174
Version: 1, Version Date: 03/07/2019
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approved Plans - MCU18-0097.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.