GOOD SHEPHERD LUTHERAN COLLEGE ODYSSEY CONSULTING GROUP
Lot 30 on SP170751 Conceptual Stormwater Management Plan
115 Eumundi Noosa Road, Noosaville Project No: K4277
Initial Construction – Bulk Earthworks:
Maintain construction access/exit, sediment fencing, dust fences and all other existing controls
as required.
Second Stage Construction:
Maintain construction access/exit, sediment fencing, dust fences and all other existing controls
as required;
Progressively revegetate finished areas where applicable; and
Drainage structure protection around field inlets and gully pits.
During construction, all areas of exposed soils allowing dust generation are to be suitably treated.
Treatments will include mulching the soil and watering. Road accesses are to be regularly cleaned to
prevent the transmission of soil on vehicle wheels and eliminate any build-up of typical road dirt and
tyre dusts from delivery vehicles.
Adequate waste disposal facilities are to be provided and maintained on the site to cater for all waste
materials such as litter hydrocarbons, toxic materials, acids or alkaline substances.
Water Quality Monitoring and Inspections
To ensure that the water quality objectives are being met during the construction phase of the
development water quality monitoring shall be conducted at a monitoring station downstream of the
works. Water quality monitoring shall use a calibrated probe and/or sampling and testing at a NATA
registered laboratory.
Location: Monitoring Station downstream of the proposed works.
Parameters: Site discharge criteria.
Frequency: Following at least 30 mm of rainfall in a 24 hour period.
The contractor shall be responsible for the inspection and maintenance of all sediment and erosion
control devices. Additional controls and review of existing controls shall be undertaken in response to
the results of the above-mentioned monitoring program.
Reporting
An inspection report shall be written by a suitably qualified and experienced scientist/engineer
following each water quality monitoring episode. The report shall include at least the following
information.
Name, address and real property description for the development site;
Council file reference number (if known);
Monitoring locations;
Performance criteria;
Results for each monitoring location, identifying any breaches of performance criteria, and
Recommended corrective actions to be taken and additional sediment and erosion controls, if
required.
Inspection reports shall be provided to the contractor for their action and compilation in an on-site
register. If the above-mentioned performance criteria are exceeded and results from the downstream
monitoring stations show significant deterioration from upstream results (if applicable), the
contractor shall implement all recommendation of the inspection report within (1) working day of
receipt of the report.
K4277-0002-E 18 June 2019 Page 11 of 14
Document Set ID: 20894174
Version: 1, Version Date: 03/07/2019
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approved Plans - MCU18-0097.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.