Approved Plans - MCU18-0097 · MCU18/0097

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                 GOOD SHEPHERD LUTHERAN COLLEGE                                                              ODYSSEY CONSULTING GROUP
                 Lot 30 on SP170751                                                               Conceptual Stormwater Management Plan
                 115 Eumundi Noosa Road, Noosaville                                                                     Project No: K4277

                          Initial Construction – Bulk Earthworks:

                               Maintain construction access/exit, sediment fencing, dust fences and all other existing controls
                                as required.

                          Second Stage Construction:
                               Maintain construction access/exit, sediment fencing, dust fences and all other existing controls
                                as required;
                               Progressively revegetate finished areas where applicable; and
                               Drainage structure protection around field inlets and gully pits.

                          During construction, all areas of exposed soils allowing dust generation are to be suitably treated.
                          Treatments will include mulching the soil and watering. Road accesses are to be regularly cleaned to
                          prevent the transmission of soil on vehicle wheels and eliminate any build-up of typical road dirt and
                          tyre dusts from delivery vehicles.

                          Adequate waste disposal facilities are to be provided and maintained on the site to cater for all waste
                          materials such as litter hydrocarbons, toxic materials, acids or alkaline substances.

                          Water Quality Monitoring and Inspections
                          To ensure that the water quality objectives are being met during the construction phase of the
                          development water quality monitoring shall be conducted at a monitoring station downstream of the
                          works. Water quality monitoring shall use a calibrated probe and/or sampling and testing at a NATA
                          registered laboratory.

                          Location:           Monitoring Station downstream of the proposed works.

                          Parameters:         Site discharge criteria.

                          Frequency:          Following at least 30 mm of rainfall in a 24 hour period.

                          The contractor shall be responsible for the inspection and maintenance of all sediment and erosion
                          control devices. Additional controls and review of existing controls shall be undertaken in response to
                          the results of the above-mentioned monitoring program.

                          Reporting
                          An inspection report shall be written by a suitably qualified and experienced scientist/engineer
                          following each water quality monitoring episode. The report shall include at least the following
                          information.

                               Name, address and real property description for the development site;
                               Council file reference number (if known);
                               Monitoring locations;
                               Performance criteria;
                               Results for each monitoring location, identifying any breaches of performance criteria, and
                               Recommended corrective actions to be taken and additional sediment and erosion controls, if
                                required.

                          Inspection reports shall be provided to the contractor for their action and compilation in an on-site
                          register. If the above-mentioned performance criteria are exceeded and results from the downstream
                          monitoring stations show significant deterioration from upstream results (if applicable), the
                          contractor shall implement all recommendation of the inspection report within (1) working day of
                          receipt of the report.




                 K4277-0002-E                                            18 June 2019                                       Page 11 of 14
Document Set ID: 20894174
Version: 1, Version Date: 03/07/2019

Used in these records

About this file

File size
3.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Approved Plans - MCU18-0097.pdf · 3.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.