GOOD SHEPHERD LUTHERAN COLLEGE ODYSSEY CONSULTING GROUP
Lot 30 on SP170751 Conceptual Stormwater Management Plan
115 Eumundi Noosa Road, Noosaville Project No: K4277
5.4 Operational Phase
The following sections provide details of the stormwater quality improvement devices (SQID’s)
proposed for the operational phase of the development. Odyssey Consulting Group, Stormwater
Management Plan (Ref: K4277/P007/G) and Odyssey Consulting Group, Stormwater Detention and
Bioretention Details (Ref: K4277/P010/E) included as Appendix F illustrates the size and location of
the proposed SQID’s.
MUSIC Version 6.3.0 has been used for modelling of the proposed treatment train.
Stormwater Quality Improvement Devices
Site runoff from Catchment A and B will be directed into bio-retention basins located at the West
(basin A) and South (basin B) of the site respectively. Catchment C will remain unchanged and will
bypass treatment and discharge direct to Council stormwater infrastructure. For further details see
Odyssey Consulting Group, Stormwater Management Plan (Ref: K4277/P007/G) included in Appendix
F. The proposed treatment train for the development is shown in Figure 4.
Figure 4: Music Modelling Treatment Train
Design Parameters of the Stormwater Quality Improvement System
Detailed design of the stormwater treatment train shall be in accordance with the WSUD, Technical
Design Guidelines for South East Queensland – Version 1 (June 2006).
BIO-RETENTION BASINS
A bio-retention basin is designed to pond stormwater allowing it to percolate through a layer of filter
media, typically sandy loam. Runoff passing through the filter media is collected with perforated pipe
discharging to the downstream drainage infrastructure. The Bio-retention basins shall be located to
treat all stormwater from development area.
The bio-retention basins have been modelled with the following properties:
Filter media Sandy Loam;
5 – 10% Organic Content in accordance with
AS1289.4.1.1;
Average D50 0.45 mm;
Ksat 180 mm/hr;
TN Content = 400 mg/kg
Orthophosphate Content = 20 mg/kg
Filter media depth 0.40 m;
Drainage layer 0.20 m;
Extended detention depth 0.15 m;
Seepage 0 mm/hr;
Filter Area Basin A: 34m2, Basin 2: 13m2;
Surface Area Basin B: 55m2, Basin 2: 25m2.
K4277-0002-E 18 June 2019 Page 12 of 14
Document Set ID: 20894174
Version: 1, Version Date: 03/07/2019
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approved Plans - MCU18-0097.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.