GOOD SHEPHERD LUTHERAN COLLEGE ODYSSEY CONSULTING GROUP
Lot 30 on SP170751 Conceptual Stormwater Management Plan
115 Eumundi Noosa Road, Noosaville Project No: K4277
Table 19: Bio-retention Basin Maintenance Schedule
Bio-retention Basin Maintenance Checklist
Inspection Frequency: 3 Monthly Date of Visit:
Location:
Description:
Site Visibility:
Action Required
Inspection Items Yes No
(Details)
Sediment accumulation at inflow points?
Litter basin?
Erosion at inlet or other key structures (e.g. crossovers)?
Traffic damage present?
Evidence of dumping (Building waste, oils etc)?
Vegetation condition satisfactory (density, weeds etc)?
Replanting required?
Mowing required?
Clogging of drainage points (sediment or debris)?
Evidence of ponding?
Damage/vandalism to structures present?
Surface clogging visible?
Drainage system inspected?
Resettling of system required?
Comments:
7.0 CONCLUSIONS
Odyssey Consulting Group has been commissioned by Good Shepherd Lutheran College to prepare a
Conceptual Stormwater Management Plan (CSWMP) for the Proposed Carpark at 115 Eumundi Noosa
Road, Noosaville.
This CSWMP details the conceptual planning, layout and design of the stormwater management
infrastructure for both the construction and operational phases of this development.
Hydraulic analysis demonstrated that the development will result in an increase in peak runoff as
compared with the pre development scenario. A detention tank with 100 m3 of volume is proposed to
mitigate the increase in flows from the development.
A combination of two bio-retention basins, 34 m2 and 13m2 respectively is proposed for the
operational phase of the development to treat stormwater runoff. Permeable pavement has also
been provided around existing tree drip zones, although, the permeable pavement will not contribute
towards water quality outcomes. A sediment and erosion control plan has been provided for the
construction phase of the development and shall be implemented by the contractor and developer.
K4277-0002-E 18 June 2019 Page 14 of 14
Document Set ID: 20894174
Version: 1, Version Date: 03/07/2019
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approved Plans - MCU18-0097.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.