Approved Plans - MCU18-0097 · MCU18/0097
Plans and drawings: the text below has words only, no drawings.
GOOD SHEPHERD LUTHERAN COLLEGE ODYSSEY CONSULTING GROUP
Lot 30 on SP170751 Conceptual Stormwater Management Plan
115 Eumundi Noosa Road, Noosaville Project No: K4277
TABLE OF CONTENTS
1.0 INTRODUCTION .................................................................................................................................................. 1
1.1 Background ................................................................................................................................................ 1
1.2 Scope .......................................................................................................................................................... 1
2.0 DESCRIPTION OF SUBJECT SITE ........................................................................................................................... 2
2.1 Location...................................................................................................................................................... 2
Site Topography.......................................................................................................................... 2
Vegetation and Land Use ........................................................................................................... 2
2.2 Proposed Development.............................................................................................................................. 3
3.0 SITE HYDROLOGY AND HYDRAULICS ................................................................................................................... 3
3.1 Background ................................................................................................................................................ 3
3.2 Predevelopment ......................................................................................................................................... 3
Catchment Definition and Lawful Point of Discharge ................................................................. 3
Coefficient of Runoff ................................................................................................................... 3
Time of Concentration ................................................................................................................ 4
Design Flow Rates ...................................................................................................................... 4
3.3 Post Development ...................................................................................................................................... 4
Catchment Definition and Lawful Point of Discharge ................................................................. 4
Coefficient of Runoff ................................................................................................................... 5
Time of Concentration ................................................................................................................ 5
Design Flow Rates ...................................................................................................................... 5
3.4 External Catchments .................................................................................................................................. 6
Catchment Definition.................................................................................................................. 6
Coefficient of Runoff ................................................................................................................... 6
Time of Concentration ................................................................................................................ 6
Design Flow Rates ...................................................................................................................... 7
External Catchment Channel Conveyance .................................................................................. 7
4.0 STORMWATER DETENTION ................................................................................................................................. 7
4.1 Objective .................................................................................................................................................... 7
4.2 Hydraulic Model ......................................................................................................................................... 7
4.3 Detention Volume ...................................................................................................................................... 8
5.0 WATER QUALITY ASSESSMENT ........................................................................................................................... 9
5.1 Background ................................................................................................................................................ 9
5.2 Water Quality Objectives ........................................................................................................................... 9
5.3 Construction Phase .................................................................................................................................. 10
Common Pollutants .................................................................................................................. 10
Performance Criteria ................................................................................................................ 10
Sediment and Erosion Controls ................................................................................................. 10
Water Quality Monitoring and Inspections .............................................................................. 11
Reporting .................................................................................................................................. 11
5.4 Operational Phase .................................................................................................................................... 12
Stormwater Quality Improvement Devices ............................................................................... 12
Design Parameters of the Stormwater Quality Improvement System ...................................... 12
Post Development Modelling Results - Mitigated .................................................................... 13
6.0 OPERATIONAL PHASE MAINTENANCE REQUIREMENTS ......................................................................................13
6.1 Bio-retention Basin Maintenance ............................................................................................................ 13
7.0 CONCLUSIONS ...................................................................................................................................................14
K4277-0002-E 18 June 2019 Page ii of iii
Document Set ID: 20894174
Version: 1, Version Date: 03/07/2019
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approved Plans - MCU18-0097.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.