Skip to the record
For the highest quality transcripts.

Council archive · source document

Approved Plans - MCU18-0097 · MCU18/0097

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                 GOOD SHEPHERD LUTHERAN COLLEGE                                                                                                       ODYSSEY CONSULTING GROUP
                 Lot 30 on SP170751                                                                                                        Conceptual Stormwater Management Plan
                 115 Eumundi Noosa Road, Noosaville                                                                                                              Project No: K4277


                 FIGURES
                 Figure 1:             Subject Site - Locality Plan (modified from maps.google.com.au).............................................................. 2
                 Figure 2:             Aerial Photograph (modified from google maps.google.com.au)............................................................... 3
                 Figure 3:             Mitigated Post Development Catchment Q100 Flow Rates (25 minute Storm) ........................................... 9
                 Figure 4:             Music Modelling Treatment Train ............................................................................................................ 12



                 TABLES
                 Table 1:              Site Description........................................................................................................................................... 1
                 Table 2:              Pre Development Coefficients of Runoff .................................................................................................... 4
                 Table 3:              Pre Development Time of Concentration ................................................................................................... 4
                 Table 4:              Catchment A - Pre Development Internal Catchment Peak Flow Rates ..................................................... 4
                 Table 5:              Post Development Catchment Impervious Properties ............................................................................... 5
                 Table 6:              Post Development Coefficients of Runoff................................................................................................... 5
                 Table 7:              Catchment C Time of Concentration .......................................................................................................... 5
                 Table 8:              Catchment A Post Development Peak Flow Rates ...................................................................................... 5
                 Table 9:              Catchment B Post Development Peak Flow Rates ...................................................................................... 6
                 Table 10:             Catchment C Post Development Flow Rates .............................................................................................. 6
                 Table 11:             External Catchment C ................................................................................................................................. 6
                 Table 12:             External Catchment A Peak Flow Rates ...................................................................................................... 7
                 Table 13:             Peak Discharge Rate for Site (m3/s) ........................................................................................................... 8
                 Table 14:             Detention Tank A Parameters..................................................................................................................... 8
                 Table 15:             Comparison of Pre Development, Post Development and Mitigated Flow Rates for Catchment B ........... 8
                 Table 16:             Construction Phase Key Pollutants ........................................................................................................... 10
                 Table 17:             Construction Phase Water Quality Performance Criteria ......................................................................... 10
                 Table 18:             Treatment Train Effectiveness of Proposed SQID ..................................................................................... 13
                 Table 19:             Bio-retention Basin Maintenance Schedule ............................................................................................. 14



                 APPENDICES
                 Appendix A            Skyline Surveyors, Contour and Detail Survey (Ref: 21 April 2017)
                 Appendix B            Burling Brown Architects, Carpark 1 (Ref: GSL06/SK03/P7)
                                       Burling Brown Architects, Carpark 2 (Ref: GSL06/SK04/P7)
                 Appendix C            Odyssey Consulting Group, Pre Development Catchment Plan (Ref: K4277/P005/B)
                 Appendix D            Odyssey Consulting Group, Post Development Catchment Plan (Ref: K4277/P006/E)
                 Appendix E            Odyssey Consulting Group, External Catchment Plan (Ref: K4277/P011/C)
                 Appendix F            Odyssey Consulting Group, Stormwater Management Plan (Ref: K4277/P007/G)
                                       Odyssey Consulting Group, Stormwater Detention and Bioretention Details (Ref: K4277/P010/E)
                 Appendix G            Odyssey Consulting Group, Sediment and Erosion Control Plan (Ref: K4277/P008/D)
                                       Odyssey Consulting Group, Sediment and Erosion Control Details (Ref: K4277/P009/B)




                 K4277-0002-E                                                                   18 June 2019                                                                        Page iii of iii

Document Set ID: 20894174
Version: 1, Version Date: 03/07/2019

Used in these records

About this file

File size
3.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Approved Plans - MCU18-0097.pdf · 3.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.