Approved Plans - MCU18-0097 · MCU18/0097
Plans and drawings: the text below has words only, no drawings.
GOOD SHEPHERD LUTHERAN COLLEGE ODYSSEY CONSULTING GROUP
Lot 30 on SP170751 Conceptual Stormwater Management Plan
115 Eumundi Noosa Road, Noosaville Project No: K4277
FIGURES
Figure 1: Subject Site - Locality Plan (modified from maps.google.com.au).............................................................. 2
Figure 2: Aerial Photograph (modified from google maps.google.com.au)............................................................... 3
Figure 3: Mitigated Post Development Catchment Q100 Flow Rates (25 minute Storm) ........................................... 9
Figure 4: Music Modelling Treatment Train ............................................................................................................ 12
TABLES
Table 1: Site Description........................................................................................................................................... 1
Table 2: Pre Development Coefficients of Runoff .................................................................................................... 4
Table 3: Pre Development Time of Concentration ................................................................................................... 4
Table 4: Catchment A - Pre Development Internal Catchment Peak Flow Rates ..................................................... 4
Table 5: Post Development Catchment Impervious Properties ............................................................................... 5
Table 6: Post Development Coefficients of Runoff................................................................................................... 5
Table 7: Catchment C Time of Concentration .......................................................................................................... 5
Table 8: Catchment A Post Development Peak Flow Rates ...................................................................................... 5
Table 9: Catchment B Post Development Peak Flow Rates ...................................................................................... 6
Table 10: Catchment C Post Development Flow Rates .............................................................................................. 6
Table 11: External Catchment C ................................................................................................................................. 6
Table 12: External Catchment A Peak Flow Rates ...................................................................................................... 7
Table 13: Peak Discharge Rate for Site (m3/s) ........................................................................................................... 8
Table 14: Detention Tank A Parameters..................................................................................................................... 8
Table 15: Comparison of Pre Development, Post Development and Mitigated Flow Rates for Catchment B ........... 8
Table 16: Construction Phase Key Pollutants ........................................................................................................... 10
Table 17: Construction Phase Water Quality Performance Criteria ......................................................................... 10
Table 18: Treatment Train Effectiveness of Proposed SQID ..................................................................................... 13
Table 19: Bio-retention Basin Maintenance Schedule ............................................................................................. 14
APPENDICES
Appendix A Skyline Surveyors, Contour and Detail Survey (Ref: 21 April 2017)
Appendix B Burling Brown Architects, Carpark 1 (Ref: GSL06/SK03/P7)
Burling Brown Architects, Carpark 2 (Ref: GSL06/SK04/P7)
Appendix C Odyssey Consulting Group, Pre Development Catchment Plan (Ref: K4277/P005/B)
Appendix D Odyssey Consulting Group, Post Development Catchment Plan (Ref: K4277/P006/E)
Appendix E Odyssey Consulting Group, External Catchment Plan (Ref: K4277/P011/C)
Appendix F Odyssey Consulting Group, Stormwater Management Plan (Ref: K4277/P007/G)
Odyssey Consulting Group, Stormwater Detention and Bioretention Details (Ref: K4277/P010/E)
Appendix G Odyssey Consulting Group, Sediment and Erosion Control Plan (Ref: K4277/P008/D)
Odyssey Consulting Group, Sediment and Erosion Control Details (Ref: K4277/P009/B)
K4277-0002-E 18 June 2019 Page iii of iii
Document Set ID: 20894174
Version: 1, Version Date: 03/07/2019
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approved Plans - MCU18-0097.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.