NOOSA COUNCIL IDAS Development Application Decision Notice 17
120. The transportation of all materials to and from the site shall be undertaken in a manner such that no
particle matter escapes onto a public road. All vehicles carrying materials either to or from the site shall
be covered to prevent materials including dust being windblown from the vehicle.
Building
121. To meet the needs of people across a range of abilities and ages and be adaptable for the changing
needs of people over time, at least 3 dwelling units shall include the following:
121.1. All doors to habitable rooms, kitchen, laundry and bathrooms are a minimum of 870mm wide; and
121.2. Hallways are a minimum of 1.2m wide; and
121.3. All entries into the dwelling unit and internal doorways, have no more than a 10mm change in level,
other than access to balconies where building code sill weatherseal is to be maintained. A ramp
can be retrofitted to provide access in accordance with Australian Standards 1428.1 – 1993 Design
for Access and Mobility Chapter 7 Doorways, Doors and Circulation Space at Doorways – Ramped
Threshold; and
121.4. Has an accessible toilet and bathroom, complete with reinforced walls, that can be reached along
an accessible path; and
121.5. A sliding door or window, no higher than 600mm from the floor is provided in at least 1 bedroom to
allow for a seated person to look out of and open and close the sliding door or window; and
121.6 A minimum of one power point to each habitable room is placed up from the floor (minimum
600mm) and out from the corner (minimum 500mm) to facilitate disabled access.
122. The following shall be complied with the development of the site:
122.1. There is to be no uncontrolled discharge of water onto the slope;
122.2. Stripping of vegetation for construction purposes should be minimised. If vegetation is destroyed it
should be reinstated immediately after construction is completed;
122.3. The recommendations of all Golder Associates Pty Ltd reports on slope stability over the Settlers
Cove site are to be adhered to for the design, construction and supervision of the development;
122.4. Additional load due to fill, construction equipment or stockpiled materials should not be located on
the dune slope;
122.5. Vibration monitoring shall be carried out by the geotechnical engineer and appropriate action taken
should vibration effects be a concern.
122.6. A condition survey is to be carried out of adjoining buildings, structures and services prior to any
demolition works or construction works taking place on site. If distress already exists, a
photographic survey shall be undertaken, the distress measured and a plan to monitor changes to
distress shall be implemented. A copy of this report is to be submitted to Council within 5 business
days of survey and prior to construction work proceeding;
122.7. Deleted.
122.8. A RPEQ shall be engaged by the client to oversee any piling works;
122.9. The construction of the whole of the foundations is to be carried out in accordance with the
recommendations of the applicant’s consulting Geotechnical engineer, including any on-site
supervision required by these recommendations. Such works shall only be carried out during dry
weather conditions and if there is a risk of sand movement occurring, all work shall be suspended
until such steps, approved by the applicant’s Geotechnical engineer have been taken to ensure
that no further slippage will result.
SEP o:\database\onestop\decision.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
23117 DA COMPILED Decision Notice [As Published]Related documentApplication case desk ↗
0015CF9F.001.pdfRelated documentPublic source context ↗
About this file
- File size
- 87 KB (small file)
- File type
No other editions are linked here.