NOOSA COUNCIL IDAS Development Application Decision Notice                                                           16


         Any changes required by Council’s Solicitor must be corrected immediately.
Earthworks

108.     Plans and details outlining the extent of earthworks required on site and any trees to be retained shall be
         submitted to Council for approval prior to obtaining a Development Permit for Operational Works.

109.     All major excavations (including the basement and driveways) shall be shored to prevent batters
         extending into areas and vegetation that are to be retained. All trees to be retained should be adequately
         tagged to Council’s satisfaction and enclosed with a barrier fence to the drip line to prevent damage.

110.     It is recommended that the applicant employ the services of a Geotechnical Engineer to supervise and
         certify the earthworks required on site and measures to ensure stability of adjoining land and structures.

111.     Earthworks shall not cause the ponding of water on any adjoining lands or the blockage of, or interference
         with, any natural watercourses or overland flow path.
Erosion and Sediment Control

112.     Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site
         control measures such as silt fencing, controlled gravel access to the site, controlled disposal of waste,
         catch drains, and temporary infiltration or sump pump-outs will be necessary.
         Plans detailing the methods of controlling erosion and sediment are required to be submitted to the
         Council for approval prior to obtaining a Development Permit for Operational Works. The applicant is
         advised that a simple silt fence by itself is unlikely to meet the objectives of best practice for Erosion &
         Sediment Control.
Construction Issues

113.     A Construction Management Plan addressing all construction phases, including traffic management, shall
         be prepared and submitted to Council for approval prior to obtaining a Development Permit for
         Operational Works.

         The report should aim to address every foreseeable problem that could occur during the construction
         process and include recommendations on how these can be overcome or minimised. The report shall be
         to the reasonable satisfaction of the Manager Land Development.

Community Management Statement Requirements

114.     The Applicant and all future owners of the site shall comply with the Environmental Management Plan
         (EMP) for Settlers Cove Development 23118 DA and compliance with the EMP shall be referenced in any
         community management statement over the site.

115.     The Fire Management Plan is to be implemented by the Developer and future owners of the site and is to
         be referenced in any community management statement.

116.     The owners of the allotment shall not object to the construction of a boardwalk along Noosa Inlet beside
         allotment 4 for the purpose of providing public access. Any Community Management Statement
         established over any allotment shall also detail that the body corporate will not object to the provision of a
         boardwalk as detailed above.
General

117.     A Registered Professional Engineer of Queensland shall certify engineering drawings and specifications
         for all engineering works, which shall be submitted in conjunction with an application for a Development
         Permit for Operational Works.

118.     Any damage caused to any public utility during the course of construction shall be repaired to Council’s
         standards and at no cost to Council.

119.     Any alteration of any public utility or other facilities necessitated by the development of the land or
         associated construction works external to the site shall be at no cost to Council.




SEP o:\database\onestop\decision.doc

Used in these records

About this file

File size
87 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

23117 DA COMPILED Decision Notice [As Published].pdf · 87 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.