Council archive · source document
23117 DA COMPILED Decision Notice [As Published] · 132002.220609.3
NOOSA COUNCIL IDAS Development Application Decision Notice 4
11. The developer must obtain all of the other Development Permits referred to in the Decision Notice, prior to
obtaining a Development Permit for building works.
12. The proposed development shall have all kitchen, laundry and bathroom fittings that comply with the AAA
Water Conservation Rating System as defined by the AS/NZS 6400 (Water Efficient Products – Rating
and Labelling 2003) and AS/NZS 3500 (National Plumbing and Drainage Standard Part 1.2). All tap ware
and shower roses shall not exceed a maximum flow of 9 litres per min. Dishwashers, baths, spa baths
and washing machines are excluded from this requirement.
Environmental
13. The development over the subject site shall comply with the following:
13.1. All necessary stormwater, erosion and sediment and water quality management and control
devices shall be located within the development precinct. That is, areas shown as ‘Selective
Clearing’ on the Vegetation Clearing Plan dated 23.7.04.
13.2. No clearing or removal of native vegetation (other than that specified in the Ecological Restoration
Plan) shall be undertaken within the area of ‘Retained and Enhanced Vegetation’ shown on the
Vegetation Clearing Plan dated 23.7.04.
13.3. The building set back line between the ‘Private Open Space for Conservation & Waterways
Protection’ area and any development on proposed Lot 7 of the Residential High Density
Development shall be 6.0 metres, apart from accessible open decks and balconies which shall
maintain a setback of 3.0 metres.
Management Plans
14. The Applicant shall prepare various management plans that relate to the design, construction and
operational phases of the development. These plans are to be prepared by appropriately qualified
persons to the reasonable satisfaction of Council prior to any further approvals being issued, unless any
other condition herein or in a subsequent development permit require otherwise.
The plans are to provide specific matters detailed in the conditions of this approval. The plans to be
submitted include:
14.1. Environmental Management Plan
14.2. Ecological Restoration Plan and Specifications
14.3. Fauna Management Plan
14.4. Fire Management Plan
14.5. Construction Management Plan (including Traffic Management Plan)
14.6. Sediment and Erosion Control Plan
14.7. Stormwater and Water Quality Management Plan
14.8. Acid Sulphate Soils Management Plan
Fees Payable
15. The Applicant shall pay Council all reasonable costs for the assessment of the management plans and
also the costs associated with ensuring the development complies with the requirements of this approval.
These costs shall be limited to a maximum of $30,000 including the cost of external consultants should
they be required.
16. The further approvals required to allow development to occur shall be subject to the fees contained in
Council’s Fees and Charges Schedule.
SEP o:\database\onestop\decision.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
23117 DA COMPILED Decision Notice [As Published]Related documentApplication case desk ↗
0015CF9F.001.pdfRelated documentPublic source context ↗
About this file
- File size
- 87 KB (small file)
- File type
No other editions are linked here.