Attachment 1 - MCU12_0133
MCU12/0133
driveway must be located generally in accordance with drawing number 3286NO03-
DA-03 revision B prepared by Fulton Trotter and varied to ensure that the construction
and use of the driveway will not adversely affect the adjacent significant vegetation.
18. The works must be undertaken in accordance with an Operational Works approval and
must include in particular:
(a) a driveway crossover in accordance with IPWEAQ standard drawing SEQ R-
051
(b) a maximum driveway width of 6 metres within the Girraween Court road
reserve and widened within the site where necessary to permit vehicles to pass
(c) suitable safety measures, including warning signage, to improve driver
awareness of pedestrians and enhance pedestrian safety.
(d) a sealed or suitable permeable surface driveway for the full length of the
access to the proposed internal boundary, including underground service
conduits for the necessary services.
Car Parking
19. A total of 9 car parking spaces must be provided and marked on the site. The works
must be undertaken in accordance with an Operational Works approval and must
include in particular:
(a) 3 staff parking spaces within the total, which are clearly marked for that
purpose
(b) 1 disabled parking space within the total
All car parking areas and access driveways must be maintained exclusively for vehicle
parking and manoeuvring and kept in a tidy and safe condition at all times.
Service Vehicles
20. Service vehicle manoeuvring and access must be provided on the site for servicing the
adjoining lot to the east. The works must be undertaken in accordance with an
Operational Works approval and in particular must include area sufficient to allow a
refuse vehicle access to the adjoining lot to the east.
Pedestrian and Bicycle Facilities
21. Pedestrian and bicycle facilities must be provided for the development. The works
must be undertaken in accordance with an Operational Works approval and must
include in particular:
(a) pedestrian pathways between the proposed car parking area and the buildings
(b) adequate separation of all specific pedestrian routes from vehicle access and
manoeuvring areas,
(c) signage and lighting at strategic locations to direct people to building entries
(d) a total of 16 bicycle parking spaces
(e) end of trip facilities involving 8 lockers, 2 male and female showers and change
rooms.
Stormwater Quality/Quantity Management
22. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge. The works must be undertaken in accordance with an Operational
Works approval and the Noosa Plans Water Sensitive Urban Design Code
requirements, and must include in particular the works described in section 5.2 -
FM1509s/2-13/04/2011 Page 5 of 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.