Attachment 1 - MCU12_0133
MCU12/0133
Flooding impacts downstream of the site of the Stormwater Management Plan (Bligh
Tanner Pty Ltd, Site Based Stormwater Management Plan, Job No. 2012.167.600, 8
August 2012) listed in this Decision Notice.
23. A stormwater quality treatment system must be provided for the development. The
works must be undertaken in accordance with an Operational Works approval and
must include in particular provision of stormwater quality treatment devices including
rainwater storage tanks of a size and location in accordance with those described and
shown in the Stormwater Management Plan (Bligh Tanner Pty Ltd, Site Based
Stormwater Management Plan, Job No. 2012.167.600, 8 August 2012) listed in this
Decision Notice.
Earthworks and Retaining Walls
24. All fill and associated batters must be must be undertaken in accordance with an
Operational Works approval, and contained entirely within the subject site unless
written permission from the respective landowner(s) is provided to Council.
Damage to Services and Assets
25. Any damage caused to existing services and assets above or below the ground must
be repaired:
(a) where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
(b) where otherwise, upon completion of the works associated with the
development.
Any repair work which proposes to alter the alignment or level of existing services and
assets must first be referred to the relevant service authority for approval.
HYDRAULICS AND WATER QUALITY
Stormwater Quality/Quantity Management
26. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge. The works must be undertaken in accordance with an Operational
Works approval and the Noosa Plans Water Sensitive Urban Design Code
requirements, and must include in particular:
(a) the works described in section 5.2 - Flooding impacts downstream of the site of
the Stormwater Management Plan (Bligh Tanner Pty Ltd, Site Based
Stormwater Management Plan, Job No. 2012.167.600, 8 August 2012) listed in
this Decision Notice.
27. A stormwater quality treatment system must be provided for the development. The
works must be undertaken in accordance with an Operational Works approval and
must include in particular:
(a) Provision of stormwater quality treatment devices including rainwater storage
tanks of a size and location in accordance with those described and shown in
the Stormwater Management Plan (Bligh Tanner Pty Ltd, Site Based
Stormwater Management Plan, Job No. 2012.167.600, 8 August 2012) listed in
this Decision Notice.
FM1509s/2-13/04/2011 Page 6 of 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.