Skip to the record
Every meeting, every word.

Original source · versioned page text

Attachment 1 - MCU12_0133

of 30

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                                                                                       MCU12/0133

6.       APPROVED PLANS/DOCUMENTS

The approved plans and / or documents for this development approval are listed in the
following tables:

Approved Plans
Plan No.                      Rev.   Plan Name                                        Date
3286NO03 – DA-03              B      Proposed External Works Plan, prepared by 20/11/2012
                                     Fulton Trotter Architects
3286NO03 – DA-05              -      Elevations & Materiality, prepared by Fulton 7/8/2012
                                     Trotter Architects
3286NO03 – DA-06              -      Site Sections, prepared by Fulton Trotter 17/8/2012
                                     Architects

Plans Requiring Amendment
Plan No.                      Rev.   Plan Name                                        Date
Drawing Number 12- A                 Landscape plan – Vegetation Management 08-08-12
186 LP-01                            Plan prepared by inSite EM LA
Amendments                    A: Retention of the vegetation in the south eastern front boundary
                              setback as per the Proposed External Works Plan revision B
                              (2012-11-20) Fulton Trotter Architects

7.       REFERENCED DOCUMENTS

Referenced Document
Document No.           Rev.       Document Name                                Date
2012.167.600                      Site Based Stormwater Management Plan        8 August 2012
                                  prepared by Bligh Tanner Pty Ltd

8.       ADVISORY NOTES

The following notes are included for guidance and information purposes only and do not form
part of the assessment manager conditions:

PLANNING ASSESSMENT

         Development Compliance Inspection
1.       Prior to the commencement of the use, please contact Council's Development Audit &
         Response Unit to arrange a Development Compliance Inspection.

         Infrastructure Charges
2.       This Development Permit may trigger an ―Adopted Infrastructure Charge Notice‖ (if
         applicable) to be issued in accordance with Council’s “Adopted Infrastructure Charges
         Resolution” under the State Planning Regulatory Provision (Adopted Charges) and the
         Sustainable Planning Act 2009.




FM1509s/2-13/04/2011                                                                  Page 8 of 15
Log in to download the original file

Attachment 1 - MCU12_0133.pdf · 9.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.