                                                                                      MCU12/0133

         Rainwater Harvesting
28.      Operating rainwater collection tank/s must be provided for the development. The
         tank/s must be provided in accordance with an Operational Works approval and must
         include in particular:
         (a)       A minimum total tank capacity of 20000 litres
         (b)       re-use of harvested rainwater for internal non-potable uses and outdoor uses.

29.      Certification must be submitted to Council from a qualified person* which certifies that
         the rainwater collection tank/s and associated reticulation has been installed in
         accordance with the requirements of this Decision Notice.


UNITYWATER

Water & Sewer
30.      Construction activities must not impede the access of Unitywater or Fire Brigade
         personnel to vital infrastructure (eg. valves, fire hydrants and sewer access chambers).
31.      The fire-fighting demand on Unitywater’s water supply system from the development
         must not exceed 30 litres per second.
32.      Water meters must be located on alternative boundaries to electrical pillars.
33.      Buildings and other structures must maintain a minimum clearance of 1.5 metres from
         Unitywater sewer mains, and 1.0 metre from sewer manhole chambers and inspection
         openings.
34.      Storm water filtration/retention systems and gross pollutant traps must maintain a
         minimum clearance of 1.5 metres from Unitywater water supply and sewerage
         infrastructure.
35.      Tree plantings must maintain a minimum horizontal clearance of 1.0 metre from
         Unitywater water mains and 1.5 metres from Unitywater sewerage mains. Landscaping
         plants within these clearances must be low growing when mature and suitable
         approved varieties.
36.      Construction works undertaken in the vicinity of Unitywater water supply or sewerage
         infrastructure must not adversely affect the integrity of the infrastructure. All costs
         associated with repair, replacement or alteration of infrastructure must be met by the
         applicant.

5.       REFERRAL AGENCY CONDITIONS

The referral agencies applicable to this application are:

Referral               Referral    Agency      and Referral Trigger       Response
Status                 Address

Concurrence            Department of Transport &     State controlled    The agency provided its
                       Main Roads                     road matters        response on 2 October
                       PO Box 1600                   Public Passenger    2012 (Reference No.
                       Sunshine Plaza Postal Shop     Transport           TMR12-004078). A
                       MAROOCHYDORE QLD                                   copy of the response is
                       4558                          Railways            attached.

A copy of any referral agency conditions is attached.




FM1509s/2-13/04/2011                                                                 Page 7 of 15
Log in to download the original file

Attachment 1 - MCU12_0133.pdf · 9.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.