17. Concerns are raised as to whether the existing trees located near at the entrance to the
basement are able to be retained with the excavation proposed. Further detailed plans are to
be provided demonstrating the proposed levels and cut required for the driveway and tree
location.
Response
Refer attached amended Traffic engineering report and section 5.2 which provides concept design
and section of the driveway entry in relation to the existing trees. The Arborist Report lodged with
the initial application material indicates that the driveway will be constructed using a suspended
slab design which avoids impacts to the trees located near the entrance (refer Table 6.4.2 of the
Arborist Report).
Issue - Zoning
The southern portion of the site is included in the Environmental Management and Conservation
Zone and the proposal plan indicate earthworks, sheet piling and a rapid infiltration swale within
this zone ALTA Engineering Plan A676922PEW01. The assessment table for the zone indicates
that a Resort is an inconsistent use in the zone, and the proposed works are not considered
appropriate or consistent with the zone. The area is to be retained for dense landscaping and
screening.
The plan also indicated earthworks and sheet piling occurring within Councils reserve which is not
permitted.
Information Required
18. Provide amended plans that remove the sheet piling and rapid infiltration swales from the
Environmental Management and Conservation zone.
Response
Refer attached amended proposal plans, preliminary earthworks plans and stormwater
management plan. These plans remove the sheet piling and rapid infiltration swales from the
Environmental Management and Conservation zone. No works are proposed within the
Environmental Management and Conservation zone area.
19. Remove any details of works within Councils reserve. All reports and plans are to be amended
to remove these works from the reserve.
Response
Refer attached amended proposal plans and preliminary earthworks plans. These plans remove all
works within Councils reserve.
Issue Transport - Ferry
The Sustainability Strategy lodged with the application indicates that the hotel will provide a shuttle
boat to ferry people to and from Hastings Street. No information has been provided about the
frequency of service or where the ferry will be moored noting that the jetty is a public facility.
Information Required
20. Provide further information regarding the ferry including:
20.1. Frequency of service