2021-07-06 Services & Organisation Committee Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
SERVICES & ORGANISATION COMMITTEE MEETING AGENDA 6 JULY 2021
Page 35 of 42
SERVICES & ORGANISATION COMMITTEE MEETING AGENDA 6 JULY 2021
Many factors were considered when identifying project
routes including key destinations, shopping and
education hubs, tourist attractions, terrain and strategic
Bee eee caer intne | Metifedon the Department of Transport and Mar
: . alignment. Consideration was also given to routes
Roads (DTMR) Principal Cycle Network Plan (PCNP).
strategy
5 However, consistent with the strategic nature of the
Feedback included: document, only initial investigations of routes and
e Give more consideration to terrain when potential infrastructure arrangements/requirements were
planning routes (avoid hills and dales) undertaken.
e Consider a path around Noosa Hill along the
river to take people into Hastings Further planning and investigations will be completed
Street/Main Beach from behind the J. prior to any projects proceeding. Community
consultation will also be undertaken at which time
feedback regarding proposed route alignment,
treatments can be provided.
Additional routes/connections
Suggested routes included:
« Peregian Beach — between Peregian Village
and the South Peregian Beach roundabout
on David Low Way Most of these routes were identified in the strategy.
e Peregian Beach — between Peregian Village | However, two (2) additional Pomona projects have now
and the David Low Way/’Glen Eden’ been included. A description of the project as well as the
intersection project ID and its implementation plan priority banding
e Peregian Beach — between Peregian Beach | are identified below:
and Peregian Breeze Estate ° Con ae ree ae
e Pomona —from the west side of the Reserve ee) UR aerate es Wed
Street level railway crossing to the Orange We Prciect se | Band aol ie an F
: e Pomona — between Hill Street and Whistler Way
Cate/Megse SNiTe"gaeum with connections to Gerrygone Place and Friarbird
e Pomona — between the town centre and the Place: Project 392 | Band 51 to 100
Showgrounds via Exhibition Street
* Pomona —along School Street Memorial Avenue is identified as a pedestrian access
e Pomona — along Reserve Street, from street within the walking network hierarchy. It is
midway between Rifle Street and Rules envisaged that this route could be progressed as part of
Road, to Pioneer Road future development proposed by private landowners.
e Pomona — between Hill Street and Whistler
Way with connections to Gerrygone Place
and Friarbird Place
e Aroute through the rear of the Memorial
Avenue shops in Pomona.
Page 35 of 42See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.