1. The Operational Works (OPW)Preliminary Approval for Civil Works was applied for and
granted following a long and complex MCU approval process (see Council Approval at
Attachment 2).
2. After obtaining both the MCU Development Permit and the OPW Preliminary Approval,
the GFC in 2007-2008 and slump in property markets forced the previous landowner
into receivership at which point the current land owner moved to purchase the land.
3. This Operational Works Preliminary Approval directly relates to a parent MCU approval
for accommodation unit and multiple dwelling units. This parent MCU approval is also
the subject of an application to extend the relevant period. Where the relevant period
is extended for the MCU application it is only logical that the OPW directly relating to
that approval be granted the same relevant period.
It is on this basis that the applicant is requesting an extension to the relevant period for the
application by a period of 2 years until 15 October 2015 to align with the extension period
requested for the parent MCU approval.
!Assessmentof Relevant Sustainable Planning Act 2009 Provisions
In addition to the above facts and circumstances, Section 388 of the Sustainable Planning
Act sets out the matters which Council must have regard to in their assessment of a request
to extend the relevant period of an approval. As such we have considered and assessed each
of these matters as follows:
Section 388 Deciding Request
-
In deciding a request under section 383, the assessment manager must only have regard to:
(a)the consistency ofthe approval, including its conditions, with the current laws and policies
applying to the development, including,for example, the amount and type of infrastructure
contributions, or infrastructure charges payable under an infrastructure charges schedule;
The Preliminary Approval for OPW issued by Council on 21 April 2009 for Civil Works related
to the higher order MCU approval for Multiple Dwelling Units and Accommodation Units.
P: 0754431444
E: [email protected]
Suite 5,156-158 Alexandra Parade
Alexandra Headland Q 4572
Page 2 of4
PO Box 1043 Maroochydore Q 4558
townplanningsunshinecoast.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Request to extend relevant period - 142007.2555.04Related documentApplication case desk ↗
Request to extend relevant period - 142007.2555.04Related documentApplication case desk ↗
Request to extend relevant period - 142007.2555.04Related documentApplication case desk ↗
Request to extend relevant period - 142007.2555.04Related documentApplication case desk ↗
About this file
- File size
- 13.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.