Skip to the record
The only place to find full transcripts.

Original source · versioned page text

Minor Change Application

Attached to the e-mail RE_ MCU23_0085 - Mitton - Request for Minor Change to a Development Approval - 7 Ashdown Court_ Tinbeerwah QLD 4563.

of 38

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 13, section 1. The text section number identifies this passage in the reader.

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       THIS DRAWING IS SUBJECT TO COPYRIGHT LAWS AND
                                                                                                                                                                                                                      9.6 ROOFS (INCLUDING PENETRATIONS, EAVES, FASCIAS AND GABLES,
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       MAY NOT BE COPIED WITHOUT THE WRITTEN PERMISSION
                                                                                                                                                                                                                      AND GUTTERS AND DOWNPIPES)                                                                                                                                                                                                                                       OF ANNA PAROZ DESIGN AND DRAFTING                        ©
                                                                                                                                                                                                                      9.6.1 General
                                                                                                                                                                                                                      The following applies to all types of roofs and roofing systems:
                                                                                                                                                                                                                      (a) The roof/wall and roof/roof junction shall be sealed either by the use of fascia and
                                                                                                                                                                                                                      eaves linings or by sealing between the top of the wall and the underside of the roof
                                                                                                                                                                                                                      and between the rafters at the line of the wall. They shall also be protected in
                                                                                                                                                                                                                      accordance with Clause 3.6.
                                                                                                                                                                                                                      (b) Roof ventilation openings, such as gable and roof vents, shall be fitted with ember
                                                                                                                                                                                                                      guards made of non-combustible material or a mesh or perforated sheet conforming
                                                                                                                                                                                                                      with Clause 3.6 and made of corrosion-resistant steel or bronze.
                                                                                                                                                                                                                      (c) Roof-mounted evaporative coolers are not permitted in BAL—FZ.
                                                                                                                                                                                                                      Appendix H provides two generic systems for skillion, hipped and gabled roofs which are
                                                                                                                                                                                                                      deemed to satisfy Clause 9.6 (BAL—FZ).
G:\_UserData (CURRENT)\Documents\1. Desktop from Old Computer (CURRENT)\Desktop (Current)\ANNA'S Comp SD (Current)\2025 Current Design Jobs\Mitton Cameron, Karen Tinbeerwah 2025\Mitton 2 Shed House.rte




                                                                                                                                                                                                                                                                                                                              9.6.5 Roof penetrations
                                                                                                                                                                                                                                                                                                                              The following applies to roof penetrations:
                                                                                                                                                                                                                                                                                                                              (a) Roof penetrations, including aerials, vent pipes and supports for solar collectors or
                                                                                                                                                                                                                    APPENDIX H                                                                                                the like, shall be sealed with mineral fibre at the roof to prevent gaps. The material
                                                                                                                                                                                                                                                                  APPENDIX H
                                                                                                                                                                                                                                                                                                                              used to seal the penetration shall be non-combustible.
                                                                                                                                                                                                                                                                                                                              NOTE: As a general principle, the service penetration should not significantly compromise
                                                                                                                                                                                                                                                                                                                              the performance of the element of construction it penetrates nor should it be a means to allow
                                                                                                                                                                                                               9.6.3 Sheet roofs                                                                                              the passage
                                                                                                                                                                                                               Sheet roofs shall conform with—
                                                                                                                                                                                                               (a) Appendix H; (As above diagram Figure H2))

                                                                                                                                                                                                               9.6.4 Veranda, carport and awning roof

                                                                                                                                                                                                               (ii) Timber rafters lined on the underside with fibre-cement sheet a minimum of 6
                                                                                                                                                                                                               mm in thickness, or with material conforming with AS 1530.8.2;                                                  9.6.6 Eaves linings, fascias and gables
                                                                                                                                                                                                                                                                                                                               The following applies to eaves linings, fascias and gables:
                                                                                                                                                                                                               9.6.4 Veranda, carport and awning roof -                                                                        (b) Fascias and bargeboards shall conform with AS 1530.8.2.
                                                                                                                                                                                                               Compliant with...                                                                                               (c) Eaves linings shall be—
                                                                                                                                                                                                               • Cemential Cladding Sheet 6mm with H-Mould or SoffitLine, fixed over 13mm                                      (i) a system with an FRL of –/30/30; or
                                                                                                                                                                                                               Fyrchek MR                                                                                                      (ii) a system conforming with AS 1530.8.2; or
                                                                                                                                                                                                               OR                                                                                                              (iii) a combination of Items (i) and (ii).
                                                                                                                                                                                                               • James Hardie                                                                                                  (d) Eaves penetrations shall be protected the same as for roof penetrations, as specified in
                                                                                                                                                                                                                                                                                                                               Clause 9.6.5.
                                                                                                                                                                                                                                                                                                                               (e) Eaves ventilation openings shall be fitted with ember guards in accordance with                        AS 1530.8.2:2018
                                                                                                                                                                                                                                                                                                                               Clause 3.6 made of corrosion-resistant steel or bronze.                                                    The methods for fire tests on building materials, components and structures, Part 8.2: Tests on
                                                                                                                                                                                                                                                                                                                               (f) Joints in eaves linings, fascias and gables may be sealed with plastic joining strips or               elements of construction for buildings exposed to simulated bushfire attack — Large flaming sources
                                                                                                                                                                                                                                                                                                                               timber storm moulds.                                                                                       This Standard provides methods for determining the performance of external construction
                                                                                                                                                                                                                                                                                                                                                                                                                                          elements when exposed to direct flame impingement from the fire front.

                                                                                                                                                                                                                                                                                                                                                   CLIENT:                                                            JOB                                                            DRAWN BY:     DATE DRAWN: CHECKED BY:          APPROVED FOR
                                                                                                                                                                                                            NOTES:                                                                                                                                                                                                    DESCRIPTION :                                                                                                 CONSTRUCTION:
                                                                                                                                                                                                            PLEASE NOTE: DETAILS SHOWN ON THESE PLANS ARE                                                                                          CAMERON & KAREN MITTON                                                                                                                 AP          08.04.25
                                                                                                                                                                                                            INTENDED
                                                                                                                                                                                                                                                                                                                                                                                                                      CUSTOM DESIGN - BAL FZ
                                                                                                                                                                                                            TO BE ACCURATE - HOWEVER INFORMATION WRITTEN INTO                                56 OYSTER BANK ROAD,                                  SITE ADDRESS:                                                      NOT FOR CONSTRUCTION                                            COUNCIL AREA:                SCALE:
                                                                                                                                                                                                            INDIVIDUAL CONTRACTS WILL TAKE PRECEDENCE OVER PLANS                             BLI BLI, QLD 4560                                     RP186535                                                                                                                          NOOSA SHIRE
                                                                                                                                                                                                                                                                                                                                                                                                                      PROGRESSION STAGE : WORKING DRAWINGS 1
                                                                                                                                                                                                            * ALL DIMENSIONS ARE IN MILLIMETRES                                              TELEPHONE : 0412 105 174
                                                                                                                                                                                                            * DO NOT SCALE - USE WRITTEN DIMENSIONS                                                                                                7 ASHDOWN COURT, TINBEERWAH                                        DRAWING TITLE:                                                  JOB No:                      DRWG No:              ISSUE:
                                                                                                                                                                                                                                                                                             EMAIL : [email protected]
                                                                                                                                                                                                            * ALL DIMENSIONS ARE TO STRUCTURAL FRAMES ONLY                                                                                         QLD, 4563                                                                                                                          A0068724                              2.5                 Lr
                                                                                                                                                                                                               EXCLUDING FINISHED (EXISTING) SURFACES                                        Building Design Licence no. 1269235 (Low Rise)                                                                           BAL FZ CONSTRUCTION. Pg.3
Log in to download the original file

Minor Change Application.pdf · 7.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.