08/0831 - Operational Works - Landscaping, Frontage Works, Roadworks, Stormwater, Drainage, Water Supply and Sewerage, Sediment and Erosion Controls and Earthworks[As Published] · 142008.831
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.2, 31 March 2008
STATE-CONTROLLED ROAD :
To ee og
awn. J
4.1.1 Is any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlted road?
No
Yes
If no, is the proposed operational work for filling or excavating listed in integrated Planning Regulation 1998,
schedule 5 and does it exceed the threshold?
EX] No - Goto a4.7.2
O Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
ME SP te EY ity
PR I Str Eddler het JE Reg
ACID SULFATE SOILS
41.2 |s any of the operational work proposed in a local government area listed** in State Planning Policy 2/02: Planning and Managing
Development Involving Acid Sulfate Soils
L] No -Gowwaa13 XX] Yes
44 purukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Caboolture, Cairns, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Coolocta, Douglas,
Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vate, Mornington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday
+
1
4
If yes, is the natural ground level of any point where work is being carried out less than 20m AHD?
L] No
Yes
If yes, does the proposed operational work involve the following?
(i) Excavating more than 1,000m* of soil or sediment at or below 5m AHD mm) i] Yes
(ii) Filling the premises with 1,000m? or more of material with an average depth of & No 0 Yes
0.5m on land, soil or sediment at or below 5m AHD
If yes to either or both (i) or (ii) above - This application must to be referred to the Departinent of Natural Resources and Water (NRW)
as Advice Agency
BP Regiaialeant soft
EASEMENTS AND SUBSTATIONS
4.1.3 Is any of the proposed operational work for filling or excavation?
(1) No -Gowaai4
IX] Yes
if yes, is the filling or excavation associated with reconfiguring a lot?
(1 Yes - GotoQ.t4
DX] No - Answer both (a) and (b) below
{a} !s any part of the premises subject to an easement in favour of a distribution entity or transmission entity under
the Electricity Act 1994?
XX] No
(Yes
{b) Is any of the operational work proposed to be located within 10m of a substation site under the Electricity
Act 19947
No [_] Yes - This application must be referred to the entity responsible for the substation as Advice Agency.
iUiai
WP Re
pte fedile 2. 13b'e 3 de
414 \s any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number 1 issued under the
Petroleum Act 1923 for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?
{X] No -Gotoa475 []j Yes
IP Re Jiao tency
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0831 - Operational Works - Landscaping, Frontage Works, Roadworks, Stormwater, Drainage, Water Supply and Sewerage, Sediment and Erosion Controls and Earthworks[As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.