Council archive · source document
08/0831 - Operational Works - Landscaping, Frontage Works, Roadworks, Stormwater, Drainage, Water Supply and Sewerage, Sediment and Erosion Controls and Earthworks[As Published] · 142008.831
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.2, 31 March 2008
B Does the proposal involve development, other than development mentioned in the integrated Planning Act 1997 Schedule 9
(development that is exempt from assessment against a planning scheme). that is intended to be carried out on a place entered
in a Local Heritage Register under Part 7B of the Queensland Heritage Act 1992?
& No - Goto 01.2 oO Yes - (Complete Form 1, Part C,) This application requires assessment by the relevant local government against the IDAS
Code in the Queensland Heritage Regulation 2003. if the development involves building work and the focat
government is not the Assessment Manager for the application, the local government has jurisdiction as Concurrence
Agency.
Spt bmw se pega
REMOVING QUARRY MATERIAL; WILD RIVER AREA
1.2 Does the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?
XJ No-Gotoar3 (_] Yes
JP Reguiauens schedute 2, table 2. dem 11 IP Regulation, schoduic 2}. Biter? (abd river ace), Water Act 2000,
elton 434
ENVIRONMENTALLY RELEVANT ACTIVITY: WILD RIVER AREA
ti
13 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?
[IX] No-Gotoars ((j Yes
PR oh Cape) ter dBA
ints 7 detay 7 ard 45, Fray
WITHIN THE LUMITS ‘OF Al PORT
14 Is any part of the premises within the limits of a port under the Transport Infrastructure Act 1990?
IX] No - Gotoa15
Yes
1 Regunaion,
DECLARED FISH HABITAT AREA
1.5 Does any part of the premises adjoin a declared fi sh habitat area under the Fisheries Act 19907
0X] No -Gotoar6
oO Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule
8, this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). If DPI&F is not the
Assessment Manager for the application the agency has jurisdiction as Advice Agency.
D table 2. i
‘COMMUNITY INFRASTRUCTURE
sent ne auenes sme cess Meena Sieeee gyi casey tee ge ee ones oe
1.6 Is any part of the premises designated for community infrastructure?
X] No - Gato Q1.7
C Yes
Here
FM, SeDh Cites af, Ld
WASTE WATER MANAGEMENT .
17 Does the proposal involve the establishment or expansion of a waste water disposal system?
{J No - End of Section? {_] Yes
ei 2. lobhe oem S
S ECTI O N 4. Section 4 must be compicied when the apptcaton seeks S approval to carry out o) operational work,
eae a mite na wpe PMU Seam settee srctanie wee ame 7
PLANNING SCHEM iE
44 Is any of the proposed operational work assessable under a planning scheme?
J No - Go 10 04.2 DX] Yes - (Complete Form i, Part E) Answer Qs4.1.1 - 4.1.7 below.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0831 - Operational Works - Landscaping, Frontage Works, Roadworks, Stormwater, Drainage, Water Supply and Sewerage, Sediment and Erosion Controls and Earthworks[As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.