PAVEMENT DETAILS

 

 

150 THICK N32 CONCRETE
_ SL82 MESH 60 TOP COVER

150mm THICK GRAVEL
" MIN CBR 15

 

 

 

 

 

 

 

 

PAVEMENT OEPTHS MAY BE VARIED BY THE SUPERINTENDENT
FOLLOWING SUBGRAQE TESTING.

PAC TANDA’

ROADWORKS TO 3¢0mm BELOW SUBGRADE 98% STANDARO
ROADWORKS WITHIN 300mm OF SUBGRADE 100% STANOARD
LOT FILL 98% STANDARD
SUB BASE GRAVEL 400% STANDARD
BASE GRAVEL 100% STANDARD

CONCRETE TYPES

STORMWATER STRUCTURES N32
FOOTPATHS N2S
DRIVEWAY PAVEMENT INCLUDING

ROLL UP KERB N32
NOTES

PROVIDE SUBSOIL DRAINS UNDER ALL KERB AND CHANNEL AND
GTHER KERBS AND PAVEMENT EDGING.

PROVIDE 100% HEAVY QUTY CONDUITS 200mm AND EXTEND
UNDER CONCRETE DRIVEWAYS WHERE CONDUIT LOCATIONS
REQUIRED.

NOTIFY ALL RELEVANT AUTHORITIES PRIOR TO COMMENCEMENT
OF WORK WITHIN EXISTING ROAD RESERVES,

THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL
EXISTING SERVICES WITHIN THE SITE PRIOR TO COMMENCING
WORK. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY
DAMAGE TQ EXISTING SERVICES WHETHER SHOWN ON THE
DRAWINGS OR NOT.

ALL WORK SHALL CONFORM WITH THE RELEVANT LOCAL
AUTHORITY'S SPECIFICATIONS AND REQUIREMENTS.

 

 

 

1 EARTHWORKS AND PAVEMENT CONSTRUCTION ARE TQ BE CARRIEO QUT IN
ACCORDANCE WITH AS 3798 WITH GEOTECHNICAL SUPERVISION TO LEVEL

2. THE CONTRACTOR SHALL PROVIDE CERTIFICATION THAT THE WORK AND
GEOTECHNICAL SUPERVISION COMPLIES WITH AS 3798.

 

THE CONTRACTOR SHALL REFER TO GEOTECHNICAL INVESTIGATION REPORT.

SITE PREPARATION:

 

a. STRIP TOPSOIL MIN 150 OR MORE AS REQUIRED TO REMOVE ALL
VEGETABLE MATTER TO THE BASE OF THE SUB GRADE.

b. FURTHER EXCAVATE IF REQUIREO TO BOX OUT TO MINIMUM
PAVEMENT THICKNESS. REMOVE AND RECOMPACT FILL AS PER
GEOTECHNICAL REPORT NOTE ON THIS DRAWING.

c. COMPACT SUBGRADE TO A MIN RELATIVE DENSITY RATIO OF 98%
STANDARD COMPACTION AS DEFINED IN AS 1289 IN THE TOP 200.

d. EXCAVATE AND REPLACE WITH STRUCTURAL FILL ANY SOFT
SPOTS OR HEAVING SUBGRADE AREAS, STRUCTURAL FILL SHALL BE
APPROVED GRANULAR FILL (100mm MAXIMUM PARTICLE SIZE,

 

 

 

 

t 300
+ TOP_OF RUK

SNVERT OF 80K, \———

 

:

SS rT rte oS

 

 

x _ Nf Z|

 

 

 

100

 

ROUNDING

ELEVATION

 

3| 300
ANVERT OF RUK

 

ee

ft
EOGE OF RUK

PLAN
AN: N

SCALE 1: 2

@ TRANSITIONS ARE LOCATEO AT ALL
START AND FINISHES OF RUK AS
DENOTED ON PLANS AS “T”

 

NOTE:

 

10

 

 

RUK

mo ee eee INDICATES
LOCATION OF ROLL UP KERB

 

 

py

Zz
A

 

= Tee aT

     

 

c oo ee

VISQUEEN VAPOUR J
BARRIER

ROLL_UP KERB DETAIL

 

NOT TO SCALE

DANLEY DOWELMASTER KJ/DM ——
150/20/250 WITH RIP-A-STRIP
CAPPING (GREY! BAR SPACING 450mm

 

-MESH AS SPECIFIED

3 PAVEMENT THICKNESS
AS SPECIFIED

L 1500

MOUNTABLE, SEMI-MOUNT ABLE

4ERB 2& CHANKEL OR INVERT CROSSING

TO BE RECONSTRUCTED AND REINFORCED.
t

fl 2000 L VARIES

WS tin.

van 6 NOE

1
L constaucnion J01KT in 6 Hoy,

RFT? HESH
ICENTRALI

 

asta n

ECTION C4

©

S000 ! wee

            
 

 

PROPERTY BOUNDARY

 

PROPERTY

 

3501

1500

EXISTING KERB

 

    

ee TAPER

BOUNDARY

CONSTRUCTION ONT

KERB TAPER
!

  

YOSTING KERB

 

 

 

 

 

 

 

 

 

 

 

 

N16 TRIMMER,
Simm TO OOWEL EACH SIDE
CENTRE 4
t __|
i
f
yy
Tones
ped
DOWELED CONTROL JOINT
NOT TO SCALE
\ VARIES
— CONCRETE ORIVEWAY SLAB AS SPECIFIED.
REFER TO ARCHITECTURAL AND LANOSCAPE
PLANS FOR FIWSHES AND FEATURE PAVING
LOKATIONS.
VARES S% MAX, : VARS SY MAX.
t
oe

 

 

CROSSOVER - COMMERCIAL .»

7000

 

(
PLAN

 

2 No.25 DIAMETER SPIKING HOLES {TO

SUIT SPIKES 20 DIAMETRE x 300
MINIMUM LENGTH) —

 

WHEELSTOP_ DETAIL

 

NOT TO SCALE
HUMES TYPICAL WHEELSTOP OR
APPROVED SIMILAR.

18a re

 

 

 

 

 

 

 

 

 

 

 

 

MINIMUM SOAKED CBR = 15 PLACED IN LAYERS NOT EXCEEDING TANTS OFF
200mm AND COMPACTED TO ACHIEVE NOT LESS THAN 98 PERCENT ‘
MAXIMUM RELATIVE ORY DENSITY {STANDARD}, OR 70 PERCENT ORY suncnade fo fe corm acto 10 —
DENSITY INDEX IN ACCORDANCE WITH AS 1289. SITE FILLING X Se MAN 10 BE
MATERIAL ANO COMPACTION UNDER THE PAVING AND BUILDING snacn, “10
SHALL BE AS ABOVE,
YPICAL DRIVEWAY IL
NOT TO SCALE
7 TES. TITLE: PROJECT: pete MARCH 2008 SCaLe AS SHOWN
NOTES: : os
| ‘Ts is the property of 7 BARLOW GREGG Wong | STANDARO DETAILS - GENERAL | PROPOSED OFFICE vesicnen a | ereoven
1 4 Ts is the properly of the engnerr, and may aet BARLOW 28 bee
i be used, copizs, or repraduced wbally, of in part B tak Fyn a5y3e1_Agw tt $575 DEVELOPMENT at DAVID LOW
wtheut Ihe express peressica of the engneer. ; . ORCKED Bees
ee eee | Ge RESET RENE WAY, PEREGIAN BEACH a
t 1. Fagced mercons tebe pretedence aver scaled. C7” Seine ORAL COAST ASSOCIATED COMSLTANES for MORGAN & BREIERS
A] SU FOR OPERATIONAL WORKS APPROVAL 73708 | 3, Verity all dacasmas 9 ste. ra yen tks 04 rasagey twst CORE ARCHITECTS M3087 - C04 A
No. Amendment Date |By|No. Amendment Date [ay cotacey gest! Parana [Ph (07) 5444 4511 Fax: (07) S444 4969

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Used in these records

About this file

File size
4.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0831 - Operational Works - Landscaping, Frontage Works, Roadworks, Stormwater, Drainage, Water Supply and Sewerage, Sediment and Erosion Controls and Ear.pdf · 4.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗