Council archive · source document
08/0831 - Operational Works - Landscaping, Frontage Works, Roadworks, Stormwater, Drainage, Water Supply and Sewerage, Sediment and Erosion Controls and Earthworks[As Published] · 142008.831
ne SRE o
LEGEND
meme mm PROPOSED CATCHMENTS
PA LALAT]
I
——
225 Cl2
SS
Oy
RUS [ERI 89%
sTUS
\
600 x 600
FOX BGPCT. \)
cS
og Pltt.225 ¢
\e
we RL AT ”
RUK
HATCHING INDICATE!
PAVEMENT REFI
BUILDING 1
‘FFL 1.40
——— —atou FLOW PATH ———
f xulae re = em: — RLT.35 ~
j|—| = eS SE FS 9
: i
| 1 | Il | : ~
Py ola Uy 8
' we?
| | | | i |
i | i
oot po |
: 4 RLN3e
t 238 2
; L115 (SES sm PB 115 + RLIL22
/ B 600 x 4, \ ——
f / FOX BGPCT. |
BUILDING 2
FFL 10.80
NOTE:
REFER TO HYDRAULIC CONSULTANTS
DRAWINGS FOR BASEMENT ORAINAGE DETAILS.
EXISTING SEWER CONNECTION
TO BE TERMINATED
NC)
ea
~~)
300 CL2
EG
\
. « “= CONSTRUCT COMMERCIAL ACCESS Lo ACCORDANCE .
WIFH N.S.C STD. ORG, 9602
STORMWATER LAYOUT PLAN.
EXISTING SEWER MANHOLE
g
450 x 454 FIELD INLET.
INLET.
NEW CONCRETE
EXISTING PAVEMENT
STORMWATER PIPE
EXISTING PIT
EXISTING WATER MAIN
BUILDING 3
FFL 10.20
450 x 650
FEILD INLET. \ i nl
\ q
I TITLE: PROJECT: Tate MARCH 20t8 | SCALE AS SHOWN
: STORMWATER LAYOUT PLAN | PROPOSED OFFICE DeSKKED 7H | sraven
DEVELOPMENT at DAVID LOW | = «
: WAY, PEREGIAN BEACH a EC T-SUBSET Sa REVISION
tat A aT for MORGAN & BREIERS PROJECT =a
TA SSO FOR OPERATIONAL WORKS APPROVAL Baal ee CORE ARCHITECTS
Bote JeyiNe Amendment Date eee | Ph: (07) S446 4511 Fax: 107) S464 4969 M3087 - COS A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0831 - Operational Works - Landscaping, Frontage Works, Roadworks, Stormwater, Drainage, Water Supply and Sewerage, Sediment and Erosion Controls and Earthworks[As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.