Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

2022-04-19 General Committee Meeting Agenda

of 68

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA                                                     19 APRIL 2022


      b.   comprise feature vegetation (either existing or planted) in preference to built forms
      c.   integrate with the landscape design of the balance of the estate
      d.   be constructed of durable and low maintenance materials
      e.   be treated with a graffiti resistant coating
      f.   not restrict pedestrian access
      g.   Any estate entrance works must be undertaken in accordance with an Operational
           Works approval.
      Easements
39.   A 20 metre wide continuous easement for fire break trail purposes must be registered against
      the title of each new lot. The easement must be:
      a. In favour of Council and Fire Services
      b.   Located over the land area defined by ‘Firebreak fire trail’ on the subject site identified
           on the Fire Break Trail Specification within the approval plans
      c.   Located outside of the proposed covenant area;
      d.   Have no fencing between lots;
      e.   A continuous alignment through the lots.
40.   The Grantor is responsible for all maintenance and costs associated with the 20 metre wide
      easement.
41.   All easements must be designed in accordance with the planning scheme and granted at no
      cost to the Grantee. Where the Grantee is Council or a service authority, the easement
      documentation must be in accordance with the Grantee’s standard easement terms. Draft
      easement documentation must be submitted to Council for endorsement.
      Bushfire Management – Reconfiguration Requirements
42.   All reconfiguration works must be carried out in accordance with the approved Bushfire
      Hazard Assessment and Management Plan.
      *(Refer Advisory Note)
43.   Certification must be submitted to Council from a qualified person* which certifies that the
      development has been constructed in accordance with the bushfire management conditions
      of this Decision Notice.
      *(Refer Advisory Note)
44.   The following clauses must be included in the contract of sale for all Lots which requires:
      a.   future dwellings to be constructed within the building envelopes shown on the
           Approved Plans AND in accordance with the approved Bushfire Hazard Assessment
           and Management Plan.
      b.   the trafficable fire break trail to be maintained, include unlocked 4m wide gates allowing
           access to Council and Fire Services and ensure compliance with the QLD SPP
           Bushfire 2019 firebreak trail specifications.
      c.   All future dwellings are to provide a dedicated 10,000 litre water supply for firefighting
           purposes .
45.   A Landholder Bushfire Information Kit is to be provided to all new owners detailing the
      performance requirements of the trafficable firebreak fire trails




                                                                                      Page 17 of 68
Log in to download the original file

2022-04-19 General Committee Meeting Agenda(PDF, 5MB).pdf · 5.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.