Original source · versioned page text
2022-04-19 General Committee Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 19 APRIL 2022
Road & Park Names
46. The proposed names of roads must be lodged with the application for a Development Permit
for Operational Works. Names are to be
a. Relevant to Australian, preferably local, history, flora, fauna, culture, landscape or
physical characteristics.
b. If used, personal names should commemorate persons who have contributed
significantly to the development of the region; demonstrated outstanding levels of civic
service; or achieved role-model status in the wider community or donated property or
funds for community benefit; and be recognised in memoriam.
c. Park names should be unique within the locality.
d. Approval will not be given to a name that may be construed as advertising, is more
than one word, understanding that a geographic relationship such as Cooroy Mountain
is permissible; is insensitive to diverse cultures and does not accord with community
standards; and is not concise, easy to pronounce and spell and be without accent
marks, apostrophes or hyphens.
e. Approval will not be given to a name that is the same or similar to the name of another
road in the Shire, or of a road in close proximity in a neighbouring Shire. Names that
are not easily pronounced, or may cause confusion to emergency services are to be
avoided.
f. All street signs on new roads (public and private) and parks shall be erected prior to
works being accepted on maintenance.
Boundary Encroachments
47. Certification must be submitted to Council from a Licensed Surveyor which certifies that:
a. the setback/s to any new boundaries for any existing buildings remaining on the site
comply with the relevant provisions of the planning scheme and the Building Act 1975,
unless varied by this Decision Notice
b. all constructed access and roadworks (including associated fill batters and retaining
walls) are fully contained within a dedicated reserve or registered easement
c. all utility services and connections (eg. electricity, telecommunications, water,
sewerage) are wholly located within the lot they serve or alternatively included within
an easement
d. all existing effluent disposal areas are wholly located within the lot they serve and
comply with the boundary setback requirements of the Plumbing and Drainage Act
2002 and associated codes and requirements
e. all dams (including ponded water, dam walls and associated spillway structures) are
wholly located within the boundaries of a single lot
f. all retaining walls and structures are fully contained within the lot they retain any fill,
including fill batters, are wholly contained within the subject site and not on adjacent
properties
External Works
48. The table drains in the verge areas in the frontage of the subject site to Glenridge Drive must
be reconstructed to be free draining. The works must be undertaken in accordance with an
Operational Works approval and must include in particular:
a. The frontage of proposed Lot 8 must be completed prior to the sealing of the survey
plan for Stage 1
Page 18 of 68
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.