Council’s Reference: RAL20/0027
Our Reference:     2822 L06 NG
Our Contact:       Nadine Gorton




19th March 2021



Chief Executive Officer
Noosa Council
PO Box 141
TEWANTIN QLD 4565

Confidential Email Transmission: [email protected]
Original in post: No

Attention: Planning Assessment


Dear Sir/Madam,

RESPONSE TO INFORMATION REQUEST
DEVELOPMENT PERMIT FOR RECOFIGURING A LOT - SUBDIVISION OF ONE EXISTING LOT TO
CREATE TO TWO NEW LOTS OVER LOT 6 ON RP216711 AND LOCATED AT 33 ROSS
CRESCENT, SUNSHINE BEACH


I refer to the above application and the information request issued by your Council and dated 26th
November 2020. This request listed 12 items that Council considers is necessary in order to complete
its assessment of the above application.

The applicant provides the following response:

Item 1: A response to the requirements of the Reconfiguring a Lot Code with regards to Performance
Outcome PO7. It should be noted that Council officers are not supportive of the creation of a new lot
which has a slope of approximately 25%.

Applicant’s Response to Item 1: PO7 of the Reconfiguration of a Lot Code states the following:

       PO7
       Development provides for a lot layout and configuration of roads and pathways that is
       responsive to:-

          a)      the setting of the site within an urban or non-urban context;
          b)      any natural environmental values present on, or adjoining the site;
          c)      any natural hazards affecting the site or adjoining land such that the number of
                  properties or persons at risk is not increased;
          d)      the terrain of the land, minimising the need for earthworks;
          e)      any places of cultural heritage significance or character areas present on, or adjoining
                  the site; and
          f)      any important landmarks, views, vistas or other areas of high scenic quality present
                  on, or able to be viewed from, the site.

The proposed subdivision creates one lot to the south of the existing dwelling. The size and shape of
this proposed lot is consistent with the surrounding development in the area which includes lots with
areas of 600m2 opposite the site.


[OCR of page images]
Council's Reference: RAL20/0027
Our Reference: 2822 LO6 NG
Our Contact: Nadine Gorton

19!" March 2021

Chief Executive Officer
Noosa Council

PO Box 141
TEWANTIN QLD 4565

Confidential Email Transmission: [email protected]
Original in post: No

Attention: Planning Assessment

Dear Sir/Madam,

RESPONSE TO INFORMATION REQUEST

 

aer
‘a =.
martoo

consu us

+ SUNSHINE COAST OFFICE
13/6-12 BOTTLEBRUSH AVE
NOOSA HEADS
PO BOX 1684
NOOSA HEADS Q 4567

- 07 5447 2550
- 07 5455 3322
[email protected]

+ GYMPIE OFFICE
38 NASH STREET
GYMPIE
PO BOX 391
GYMPIE Q 4570
- 07 5482 7440
- 07 5482 4952
[email protected]

+ www.martooconsulting.com

DEVELOPMENT PERMIT FOR RECOFIGURING A LOT - SUBDIVISION OF ONE EXISTING LOT TO
CREATE TO TWO NEW LOTS OVER LOT 6 ON RP216711 AND LOCATED AT 33 ROSS

CRESCENT, SUNSHINE BEACH

| refer to the above application and the information request issued by your Council and dated 26th
November 2020. This request listed 12 items that Council considers is necessary in order to complete

its assessment of the above application.

The applicant provides the following response:

Item 1: A response to the requirements of the Reconfiguring a Lot Code with regards to Performance
Outcome PO7. It should be noted that Council officers are not supportive of the creation of a new lot

which has a slope of approximately 25%.

Applicant’s Response to Item 1: PO7 of the Reconfiguration of a Lot Code states the following:

PO7

Development provides for a lot layout and configuration of roads and pathways that is

responsive to:-

a) the setting of the site within an urban or non-urban context;

b) any natural environmental values present on, or adjoining the site;

Cc) any natural hazards affecting the site or adjoining land such that the number of
properties or persons at risk is not increased;

d) the terrain of the land, minimising the need for earthworks;

e) any places of cultural heritage significance or character areas present on, or adjoining
the site; and

f) any important landmarks, views, vistas or other areas of high scenic quality present
on, or able to be viewed from, the site.

The proposed subdivision creates one lot to the south of the existing dwelling. The size and shape of
this proposed lot is consistent with the surrounding development in the area which includes lots with
areas of 600m2 opposite the site.

© TOWN © URBAN © LAND © DEVELOPMENT
PLANNING DESIGN © SURVEYING MANAGEMENT
Full text of the other 10 pages

Page 2

 Page 2
Item 2: Demonstrate how the proposed reconfiguration complies with the relevant provisions within
the Noosa Plan which seek to protect the ecological values and ecological character of the site and
area.

Applicant’s Response to Item 2: No specific provisions have been detailed and therefore it is difficult
to provide an appropriate response to the item. The site is not mapped as containing any significant
vegetation (Biodiversity, Waterways and Wetlands Overlay).


Item 3: Provide a response which demonstrates how the creation of a new lot within an erosion prone
area, which will be subject to vegetation removal and future development, accords with the requirements
of the Coastal Protection and Scenic Amenity Overlay Code and the Reconfiguring a Lot Code

Applicant’s Response to Item 3: A preliminary review of the proposal against the Coastal Protection
and Scenic Amenity Overlay Code and the Reconfiguring a Lot Code is provided in the tables below:

Coastal Protection and Scenic Amenity Overlay Code
 Performance Outcomes                         Acceptable Outcomes               Proposal

 PO1                                          No acceptable outcome provided.   Site has a substantial buffer to the
 Development       allows    for   natural                                      frontal dune system and coastline.
 fluctuations of the coast and foreshores
 to occur, including allowance of climate
 change.
 PO2                                          No acceptable outcome provided.   Proposed new lot will not impact
 Development is located, designed and                                           existing frontal dune system and will be
 constructed to:                                                                in line with existing development to the
                                                                                north of the site. The proposed lot
 a) maintain dune crest heights and                                             maintains existing buffers to the
    minimise and mitigate the risk to                                           surrounding area.
    development from wave
    overtopping and storm tide
    inundation; and
 b) maintain or enhance coastal
    ecosystems and natural features
    such as coastal creeks and marine
    plants including mangroves, salt
    marshes and coastal wetlands, to
    assist in protecting and buffering
    communities and infrastructure
    from sea-level rise and coastal
    inundation impacts.

 PO3                                          No acceptable outcome provided.   No coastal building line on site.
 Where a coastal building line exists on
 a lot, all buildings, structures and
 retaining walls do not extend seaward
 of the coastal building line for the site,
 other than—

 a) uncovered and unenclosed
    cantilevered balconies that do not
    extend greater than 3 metres
    seaward of the
    coastal building line; and
 b) are setback a minimum of 6
    metres from the seaward boundary
    (see Figure 8.2.4.4).

  Editor's Note—State
  Coastal building lines are identified on
  the Coastal Protection Overlay Maps.
  State coastal building lines are
  declared under the Coastal Protection
  and Management Act 1995.
 PO4                                          No acceptable outcome provided.   Proposed lot has an average length of
 Where a coastal building line does not                                         41 metres which is more than sufficient
 exist on a lot fronting the beachfront or                                      to cater for a dwelling and required
 a reserve adjoining the beachfront, new                                        setbacks.
 buildings and structures are setback no
 less than 6 metres from the seaward
 boundary of the site.


[OCR of page images]
@ Page 2

Item 2: Demonstrate how the proposed reconfiguration complies with the relevant provisions within
the Noosa Plan which seek to protect the ecological values and ecological character of the site and
area.

Applicant’s Response to Item 2: No specific provisions have been detailed and therefore it is difficult
to provide an appropriate response to the item. The site is not mapped as containing any significant
vegetation (Biodiversity, Waterways and Wetlands Overlay).

Item 3: Provide a response which demonstrates how the creation of a new lot within an erosion prone
area, which will be subject to vegetation removal and future development, accords with the requirements
of the Coastal Protection and Scenic Amenity Overlay Code and the Reconfiguring a Lot Code

Applicant’s Response to Item 3: A preliminary review of the proposal against the Coastal Protection

and Scenic Amenity Overlay Code and the Reconfiguring a Lot Code is provided in the tables below:

Coastal Protection and Scenic Amenity Overlay Code

 

 

fluctuations of the coast and foreshores
to occur, including allowance of climate
change.

Performance Outcomes Acceptable Outcomes Proposal
PO1 No acceptable outcome provided. Site has a substantial buffer to the
Development allows for natural frontal dune system and coastline.

 

PO2
Development is located, designed and
constructed to:

a) maintain dune crest heights and
minimise and mitigate the risk to
development from wave
overtopping and storm tide
inundation; and

6) maintain or enhance coastal
ecosystems and natural features
such as coastal creeks and marine
plants including mangroves, salt
marshes and coastal wetlands, to
assist in protecting and buffering
communities and infrastructure
from sea-level rise and coastal
inundation impacts.

No acceptable outcome provided.

Proposed new lot will not impact
existing frontal dune system and will be
in line with existing development to the
north of the site. The proposed lot
maintains existing buffers to the
surrounding area.

 

PO3

Where a coastal building line exists on
a lot, all buildings, structures and
retaining walls do not extend seaward
of the coastal building line for the site,
other than—

a) uncovered and unenclosed
cantilevered balconies that do not
extend greater than 3 metres
seaward of the
coastal building line; and

b) are setback a minimum of 6
metres from the seaward boundary
(see Figure 8.2.4.4).

Editor's Note—State

Coastal building lines are identified on
the Coastal Protection Overlay Maps.
State coastal building lines are
declared under the Coastal Protection
and Management Act 1995.

No acceptable outcome provided.

No coastal building line on site.

 

PO4

Where a coastal building line does not
exist on a lot fronting the beachfront or
a reserve adjoining the beachfront, new
buildings and structures are setback no
less than 6 metres from the seaward
boundary of the site.

 

 

No acceptable outcome provided.

 

Proposed lot has an average length of
41 metres which is more than sufficient
to cater for a dwelling and required
setbacks.

 

 

Page 3

 Page 3
 PO5                                         AO5                                        As detailed above the lot has sufficient
 Development within the Coastal              A mix of native landscaping, such as       dimensions to provide an appropriate
 Protection and Scenic Amenity Area          ground covers, shrubs and trees, is        house site and landscaping to
 is—                                         provided for a width of 5 metres from      boundaries.
                                             the seaward or rear boundary of
 a) designed to protect character and        the site to provide adequate landscape
    scenic amenity and integrate with        buffering to protect the coastal dune
    the surrounding natural landscape        system.
    and skyline vegetation (see Figure
    AP3-3A); and                             Editor's Note—Refer to the Table 3.1
 b) finished predominately in colours        & 3.2 of PSP2 Landscaping for suitable
    and hues of the surrounding              coastal species.
    natural landscape.
                                             Editor's Note The following is a useful
                                             guide for ensuring that buildings blend
                                             with the natural surrounds.

                                             External building materials that are
                                             lightweight and comprise
                                             predominantly timber or board,
                                             stainless steel, glass, and corrugated
                                             iron will generally be more in keeping
                                             with the beach/riverside character than
                                             concrete rendered block.

                                             Use external colours and roof finishes
                                             which are non-reflective and which do
                                             not cause glare. Shades that match the
                                             colours and tones of
                                             surrounding vegetation will ensure the
                                             buildings are less visually prominent
                                             from the beach or the water.

                                             Appropriate wall colours will depend on
                                             the existing native vegetation and
                                             backdrop, but may include muted
                                             earth/environmental tones that blend
                                             with the natural environment, such as–

                                                      green;
                                                      olive green;
                                                      blue green;
                                                      grey green;
                                                      green blue;
                                                      indigo;
                                                      brown;
                                                      blue grey; and
                                                      green yellow.

 PO6                                         AO6.1                                      Proposal able       to   comply    with
 Rear fences adjacent to the beachfront      Rear fences adjacent to the beachfront     requirements.
 within the Coastal Protection Area are      within the Coastal Protection Area
 designed and sited to be sympathetic        incorporate the following—
 with the visual amenity of the beachfront
 and do not degrade the natural                   a)   height of no more than 1.2
 beachfront character.                                 metres; and
                                                  b)   open construction (ie at least
                                                       50% transparent);
                                                  c)   lightweight materials (eg.
                                                       timber); and
                                                  d)   dark colours to blend with the
                                                       natural landscape.

                                             AO6.2
                                             Gates are not installed in fences as
                                             direct access to the beachfront does not
                                             occur.

                                             AO6.3
                                             Only beach access points for use by the
                                             community are constructed.

Reconfiguring a Lot Code
 Performance Outcomes                        Acceptable Outcomes                        Proposal


[OCR of page images]
@ Page3

 

POS

Development within the Coastal
Protection and Scenic Amenity Area
is—

a) designed to protect character and
scenic amenity and integrate with
the surrounding natural landscape
and skyline vegetation (see Figure
AP3-3A); and

6) finished predominately in colours
and hues of the surrounding
natural landscape.

AOS

A mix of native landscaping, such as
ground covers, shrubs and trees, is
provided for a width of 5 metres from
the seaward or rear boundary of

the site to provide adequate landscape
buffering to protect the coastal dune
system.

Editor's Note—Refer to the Table 3.1
& 3.2 of PSP2 Landscaping for suitable
coastal species.

Editor's Note The following is a useful
guide for ensuring that buildings blend
with the natural surrounds.

External building materials that are
lightweight and comprise
predominantly timber or board,
stainless steel, glass, and corrugated
iron will generally be more in keeping
with the beach/riverside character than
concrete rendered block.

Use external colours and roof finishes
which are non-reflective and which do
not cause glare. Shades that match the
colours and tones of

surrounding vegetation will ensure the
buildings are less visually prominent
from the beach or the water.

Appropriate wall colours will depend on
the existing native vegetation and
backdrop, but may include muted
earth/environmental tones that blend
with the natural environment, such as—

green;

olive green;
blue green;
grey green;
green blue;
indigo;

brown;

blue grey; and
green yellow.

As detailed above the lot has sufficient
dimensions to provide an appropriate
house site and landscaping to
boundaries.

 

PO6

Rear fences adjacent to the beachfront
within the Coastal Protection Area are
designed and sited to be sympathetic
with the visual amenity of the beachfront
and do not degrade the natural
beachfront character.

 

AO6.1

Rear fences adjacent to the beachfront
within the Coastal Protection Area
incorporate the following—

a) height of no more than 1.2
metres; and

b) open construction (ie at least
50% transparent);

c) _ lightweight materials (eg.
timber); and

d) dark colours to blend with the
natural landscape.

AO6.2
Gates are not installed in fences as
direct access to the beachfront does not
occur.

AO6.3
Only beach access points for use by the
community are constructed.

 

Proposal able to with

requirements.

comply

 

Reconfiguring a Lot Code

 

Performance Outcomes

 

 

Acceptable Outcomes

 

Proposal

 

 

Page 4

 Page 4
 O1                                                                                        Site located within urban boundary
 Urban residential development:                  No acceptable outcome provided

  a) is confined to land within the Urban
      boundaries;
  b) provides a mix of lot sizes and
      configurations to cater for variety in
      housing choice;
  c) contributes to efficient use of land and
      infrastructure;
  d) increases residential densities and
      reduces lot sizes in close proximity to
      public transport and centre zones;
  e) provides appropriate buffer areas
      between sensitive land
      uses, ecologically important
      areas and conflicting uses;
  f) contributes positively to the amenity
      and landscape value of the local area.
 PO2                                                                                       Not applicable
 Rural residential development is confined to    No acceptable outcome provided
 land within the Rural Residential zone and
 included within either the Urban Footprint or
 Rural Living designations of the South East
 Queensland Regional Plan.
 PO3                                             AO3                                       Not applicable
 Development of land for business and            Development of land:
 employment functions occurs within the
 activity centres and the industrial zones.       a) at the Noosa Business Centre is to
                                                     be generally in accordance
                                                     with Figure 7.2.4.5 (Noosa Business
                                                     Centre Framework and Character
                                                     Plan);
                                                  b) at the former Bowls site Lot 3
                                                     RP884396, Noosa Junction is to be
                                                     generally in accordance with Figure
                                                     7.2.5.4 (Noosa Junction Framework
                                                     and Character Plan).


 PO4                                                                                       Not applicable – site not detailed.
 With the exception of lots intended to be       No acceptable outcome
 used by the Council or State for community
 infrastructure, conservation purposes or
 public utilities, including road widening, no
 additional         lots      are     created:

 a) in the Rural zone unless resultant lots
    have a minimum area of 100
    hectares;
 b) in the Environmental Management
    and Conservation zone;
 c) on Noosa North Shore;
 d) in the Low density residential zone at
    Cooroibah;
 e) in the Low density residential zone
    where access is gained via:

         i.    Noosa Banks Drive,
               Tewantin;
         ii.   Golf Course Drive, Griffith
               Avenue or Carramar Street,
               Tewantin;
        iii.   Lake Entrance Boulevard,
               Noosaville;
        iv.    Lake Weyba Drive
               Noosaville, south of Eenie
               Creek Road; or
         v.    Habitat Place, Noosa Heads;
 f)   within a Water Supply Buffer Area as
      shown on Regional Infrastructure
      Overlay.
 PO5                                             AO5.1                                     Proposed lots has a proposed area of
 New lots have areas and dimensions that:        New lots are of a size and shape          744m2 and is of a regular shape that
                                                 that can accommodate the land             would accommodate a residential
                                                 uses intended by the zone.                dwelling.


[OCR of page images]
@ Page4

 

o1
Urban residential development:

a) is confined to land within the Urban
boundaries;

b) provides a mix of lot sizes and
configurations to cater for variety in
housing choice;

c) contributes to efficient use of land and
infrastructure;

d) increases residential densities and
reduces lot sizes in close proximity to
public transport and centre zones;

e) provides appropriate buffer areas
between sensitive land
uses, ecologically important
areas and conflicting uses;

f) contributes positively to the amenity
and landscape value of the local area.

No acceptable outcome provided

Site located within urban boundary

 

PO2

Rural residential development is confined to
land within the Rural Residential zone and
included within either the Urban Footprint or
Rural Living designations of the South East

No acceptable outcome provided

Not applicable

 

employment functions occurs within the
activity centres and the industrial zones.

a) atthe Noosa Business Centre is to
be generally in accordance
with Figure 7.2.4.5 (Noosa Business
Centre Framework and Character
Plan);

b) at the former Bowls site Lot 3
RP884396, Noosa Junction is to be
generally in accordance with Figure
7.2.5.4 (Noosa Junction Framework
and Character Plan).

Queensland Regional Plan.
PO3 AO3 Not applicable
Development of land for business and | Development of land:

 

PO4

With the exception of lots intended to be
used by the Council or State for community
infrastructure, conservation purposes or
public utilities, including road widening, no
additional lots are created:

a) inthe Rural zone unless resultant lots
have a minimum area of 100
hectares;

6) in the Environmental Management
and Conservation zone;

c) onNoosa North Shore;

d) inthe Low density residential zone at
Cooroibah;

e) inthe Low density residential zone
where access is gained via:

i Noosa Banks Drive,
Tewantin;
ji. Golf Course Drive, Griffith
Avenue or Carramar Street,
Tewantin;
iii. | Lake Entrance Boulevard,
Noosaville;
iv. Lake Weyba Drive
Noosaville, south of Eenie
Creek Road; or
v. Habitat Place, Noosa Heads;
f) within a Water Supply Buffer Area as
shown on Regional Infrastructure
Overlay.

No acceptable outcome

Not applicable — site not detailed.

 

PO5
New lots have areas and dimensions that:

 

 

AO5.1

New lots are of a size and shape
that can accommodate the land
uses intended by the zone.

 

Proposed lots has a proposed area of
744m2 and is of a regular shape that
would accommodate a_ residential
dwelling.

 

 

Page 5

 Page 5
    a) are consistent with the purpose and         AO5.2
        overall outcomes of the applicable         In general, lots have a predominantly
        zone or zones;                             regular, rectangular shape.
    b) are consistent with the size and
        character of surrounding lots;             Editor's note-topographical
    c) can accommodate land uses that              constraints or environmental values
        are consistent with the purpose and        may call for irregular property
        overall outcomes of the applicable         boundaries.
        zone;
   1. allow for siting and construction of         AO5.3
        buildings, structures, access ways         In residential zones, lots are
        and car parking while:-                    generally arranged so that:
        a) retaining ecologically important
             areas and ecological linkages;         a) there are no more than five lots with
        b) minimising risk of soil erosion,            a frontage width of less than 15
             landslide, flooding and bushfire;         metres grouped in a row;
        c) minimising earthworks or                 b) there are no more than three lots
             retaining walls associated with           with a frontage width of 7.5 metres
             construction on sloping sites;            or less in a row unless serviced by a
                                                       rear lane;
        d) retaining the scenic amenity
             and vegetated character of the         c) lots with a frontage width of less than
             landscape;                                15 metres are not located opposite
                                                       other lots with a frontage width of
        e) retaining culturally significant
                                                       less than 15 metres
             features and protecting views
             to culturally significant features;
                                                   AO5.4
        f) minimising detrimental impacts
                                                   In activity centres and industry zones, new
             of effluent disposal or storm
                                                   lots contribute to a mix of lot sizes that cater
             water runoff; including open
                                                   for varied commercial and industrial
             space for landscaping;
                                                   enterprises,             such               that:
             ensuring safe vehicular
             manoeuvring areas without
                                                    a) smaller lots intended for intensive
             concentration of driveways in
                                                       development are clustered near
             one space; and
                                                       centres;
        g) where not in a water or
                                                    b) new lots adjacent to sensitive land
             sewerage service area, allow
                                                       uses include sufficient area for
             for water storage tanks and
                                                       buffering of incompatible land uses;
             suitable effluent disposal.
                                                       and
 2. except where otherwise specified in a
                                                    c) lot reconfiguration provides for
      local area code, comply with the
                                                       shared access arrangements
      minimum lot size specified in Table
                                                       wherever possible.
      9.5.1.4 Minimum Lot Size and
      Dimensions
 PO6                                                                                                   Regular shaped lot proposed
 Development provides for irregular shaped         No acceptable outcome provided
 lots to be created only where:

    a) the creation of regular lots is
        impractical such as at a curve in the
        road or because of topographical
        constraints;
    b) safe access and visual exposure to
        and from the site can be provided,
        while not adversely impacting on
        the functionality of the surrounding
        road network;
    c) it is desirable to
        avoid clearing of vegetation and the
        fragmentation of habitat
        in ecologically important areas; and
    d) the irregular lot is demonstrably
        suitable for its intended purpose.
 Site Responsive Design                                                                                Proposed lot located above flood level.
 PO7                                               AO7.1
 Development provides for a lot layout and         If located in the Low density residential
 configuration of roads and pathways that is       zone, Medium         density     residential
 responsive to:-                                   zone, High        density        residential
                                                   zone, Tourist               accommodation
   a) the setting of the site within an            zone or Community facilities zone and
      urban or non-urban context;                  intended for a residential use, any new lot
   b) any natural environmental values             is located outside the modelled flood level
      present on, or adjoining the site;           of the 1% AEP (1:100 year ARI) water
   c) any natural hazards affecting                surface levels or where not modelled,
      the site or adjoining land such that         above the highest known flood level.
      the number of properties or persons
      at risk is not increased;                    AO7.2
   d) the terrain of the land, minimising          Flood immunity for development areas is
      the need for earthworks;                     not achieved by filling land below the


[OCR of page images]
@ Page 5

 

a)

5)

c)

are consistent with the purpose and

overall outcomes of the applicable

zone or zones;

are consistent with the size and

character of surrounding lots;

can accommodate land uses that

are consistent with the purpose and

overall outcomes of the applicable
zone;

allow for siting and construction of

buildings, structures, access ways

and car parking while:-

a) retaining ecologically important
areas and ecological linkages;

6) minimising risk of soil erosion,
landslide, flooding and bushfire;

¢) minimising earthworks or
retaining walls associated with
construction on sloping sites;

d) retaining the scenic amenity
and vegetated character of the
landscape;

e) retaining culturally significant
features and protecting views
to culturally significant features;

f) _ minimising detrimental impacts
of effluent disposal or storm
water runoff; including open
space for landscaping;
ensuring safe vehicular
manoeuvring areas without
concentration of driveways in
one space; and

g) where not in a water or
sewerage service area, allow
for water storage tanks and
suitable effluent disposal.

except where otherwise specified in a
local area code, comply with the
minimum lot size specified in Table
9.5.1.4 Minimum Lot Size and
Dimensions

AO5.2
In general, lots have a predominantly
regular, rectangular shape.

Editor's note-topographical
constraints or environmental values
may call for irregular property
boundaries.

A05.3
In residential zones, lots are
generally arranged so that:

a) there are no more than five lots with
a frontage width of less than 15
metres grouped in a row;

b) there are no more than three lots
with a frontage width of 7.5 metres
or less in a row unless serviced by a
rear lane;

¢) lots with a frontage width of less than
15 metres are not located opposite
other lots with a frontage width of
less than 15 metres

A05.4

In activity centres and industry zones, new
lots contribute to a mix of lot sizes that cater
for varied commercial and _ industrial
enterprises, such that:

a) smaller lots intended for intensive
development are clustered near
centres;

b) new lots adjacent to sensitive land
uses include sufficient area for
buffering of incompatible land uses;
and

c) lot reconfiguration provides for
shared access arrangements
wherever possible.

 

PO6

Development provides for irregular shaped

lots

a)

5)

c)

d)

to be created only where:

the creation of regular lots is
impractical such as at a curve in the
road or because of topographical
constraints;

safe access and visual exposure to
and from the site can be provided,
while not adversely impacting on
the functionality of the surrounding
road network;

itis desirable to

avoid clearing of vegetation and the
fragmentation of habitat

in ecologically important areas; and
the irregular lot is demonstrably
suitable for its intended purpose.

No acceptable outcome provided

Regular shaped lot proposed

 

Site

Responsive Design

PO7

Development provides for a lot layout and
configuration of roads and pathways that is
responsive to:-

a)
5)

c)

d)

 

the setting of the site within an
urban or non-urban context;

any natural environmental values
present on, or adjoining the site;
any natural hazards affecting

the site or adjoining land such that
the number of properties or persons
at risk is not increased;

the terrain of the land, minimising
the need for earthworks;

 

AO7.1

If located in the Low density residential
Zone, Medium density residential
Zone, High density residential
zone, Tourist accommodation
Zone or Community facilities zone and
intended for a residential use, any new lot
is located outside the modelled flood level
of the 1% AEP(1:100 year ARI) water
surface levels or where not modelled,
above the highest known flood level.

AO7.2
Flood immunity for development areas is
not achieved by filling land below the

 

Proposed lot located above flood level.

 

 

Page 6

 Page 6
   e) any places of cultural heritage            1% AEP (1:100 year ARI) flood level.
      significance or character areas
      present on, or adjoining the site;         AO7.3
      and                                        All reconfigured lots on land subject to a      Site mapped as subject to Acid Sulfate
   f) any important landmarks, views,            constraint or valuable feature identified on    soils and landslide hazard. Specific
      vistas or other areas of high scenic       an overlay map contains a building              engineering solutions are available to
      quality present on, or able to be          envelope marked         on      a plan     of   address these constraints as part of any
      viewed from, the site.                     development that demonstrates that there        future dwelling house design and
                                                 is an area sufficient to accommodate the        construction.
 Editor’s Note— Development of                   intended purpose of the lot, that is not
 land affected by constraints shown              subject to the constraint or valuable feature
 on overlay maps will be subject to              or that appropriately responds to the
 overlay codes                                   constraint      or     valuable      feature.

                                                 AO7.4                                           Site is within the urban footprint and any
                                                 New lots with a site area less than 4,000m²     future construction on the site will be
                                                 in area have a slope not exceeding:             able to address the constraint.

                                                  a) 10% side slope (crossfall); or
                                                  b) 5% lengthwise slope (longitudinal
                                                     fall).

                                                 AO7.5                                           Future operational works applications
                                                 Lot boundaries, services, utilities and         to address.
                                                 roads are aligned to avoid
                                                 traversing ecologically     important
                                                 areas and ecological         linkages.

                                                 AO7.6                                           Future operational works applications
                                                 Development does not result in                  to address. Existing vegetation will be
                                                 significant modification to natural             retained where feasible.
                                                 landform or landscape features
                                                 including:

                                                      a)    waterways and drainage lines;
                                                      b)    native vegetation or significant
                                                            character trees;
                                                      c)    understorey vegetation;
                                                      d)    slope;
                                                      e)    rock outcrops; or
                                                      f)    views.

                                                 AO7.7                                           Existing vegetation will be retained
                                                 Development retains or provides viable          where feasible.
                                                 ecological corridors for wildlife movement.

                                                 AO7.8                                           Not applicable - No stream on site
                                                 Where no riparian buffer is nominated
                                                 through the Biodiversity, Waterways and
                                                 Wetlands Overlay Map in Schedule 2, a
                                                 vegetated buffer is provided no less than
                                                 10 metres wide, measured from the
                                                 centreline    of     any     stream     .

                                                 AO7.9                                           Not applicable – no mapped ecologicall
                                                 Ecologically important areas are formally       important areas.
                                                 protected for the long term through
                                                 environmental covenant or transferal to
                                                 public ownership or through gazettal of a
                                                 nature reserve.

 Climate          Responsive          Design
 PO8                                             AO8.1                                           Complies
 The street design and lot orientation           The lot design maximises the number of
 facilitates the construction of energy          lots where the longest axis of the lot has a
 efficient buildings that respond to the local   general east-west orientation.
 climate              conditions           by:
                                                 AO8.2                                           Not applicable – no new streets
 a) maximising solar access to the north;        The street pattern maximises the number
 b) minimising solar access to the west;         of streets running in a general north-south
 c) proportioning lots                           direction.
    and building envelopes to
    accommodate energy                           AO8.3                                           Complies
    efficient building orientation;              For development within the Low density
 d) maximising access to any prevailing          residential zone each lot contains a
    summer breezes; and                          rectangular house site area where the
                                                 long axis faces true north or is no more


[OCR of page images]
@ Page6é

 

e) any places of cultural heritage
significance or character areas
present on, or adjoining the site;
and

f) any important landmarks, views,
vistas or other areas of high scenic
quality present on, or able to be
viewed from, the site.

Editor’s Note— Development of
land affected by constraints shown
on overlay maps will be subject to
overlay codes

1% AEP (1:100 yearARI) flood level.

AO7.3

All reconfigured lots on land subject to a
constraint or valuable feature identified on
an overlay map contains a building
envelope marked on aplan_— of
development that demonstrates that there
is an area sufficient to accommodate the
intended purpose of the lot, that is not
subject to the constraint or valuable feature
or that appropriately responds to the
constraint or valuable feature.

AO7.4
New lots with a site area less than 4,000m?
in area have aslopenot exceeding:

a) 10% side slope (crossfall); or
b) 5% lengthwise slope (longitudinal

fall).
AO7.5
Lot boundaries, services, utilities and
roads are aligned to avoid
traversing ecologically important
areas and ecological linkages.
AO7.6

Development does not result in
significant modification to natural
landform or landscape features
including:

a) waterways and drainage lines;
b) _ native vegetation or significant

character trees;
c) understorey vegetation;
d) slope;
e) _ rock outcrops; or
f) views.

AO7.7
Development retains or provides viable
ecological corridors for wildlife movement.

AO7.8

Where no riparian buffer is nominated
through the Biodiversity, Waterways and
Wetlands Overlay Map in Schedule 2, a
vegetated buffer is provided no less than
10 metres wide, measured from the
centreline of any stream

AO7.9

Ecologically important areas are formally
protected for the long term through
environmental covenant or transferal to
public ownership or through gazettal of a
nature reserve.

Site mapped as subject to Acid Sulfate
soils and landslide hazard. Specific
engineering solutions are available to
address these constraints as part of any
future dwelling house design and
construction.

Site is within the urban footprint and any
future construction on the site will be
able to address the constraint.

Future operational works applications
to address.

Future operational works applications
to address. Existing vegetation will be
retained where feasible.

Existing vegetation will be retained
where feasible.

Not applicable - No stream on site

Not applicable — no mapped ecologicall
important areas.

 

Climate
Pos

The street design and lot orientation
facilitates the construction of energy
efficient buildings that respond to the local
climate conditions by:

Responsive Design

a) maximising solar access to the north;
6) minimising solar access to the west;
¢) proportioning lots
and building envelopes to
accommodate energy
efficient building orientation;
d) maximising access to any prevailing
summer breezes; and

 

 

AO8.1

The lot design maximises the number of
lots where the longest axis of the lot has a
general east-west orientation.

AO8.2

The street pattern maximises the number
of streets running in a general north-south
direction.

A08.3

For development within the Low density
residential zone each lot contains a
rectangular house site area where the
long axis faces true north or is no more

 

Complies

Not applicable — no new streets

Complies

 

 

Page 7

 Page 7
 e) minimising exposure to prevailing           than 20 degrees off true north and has
    winter winds.                               minimum dimensions of 10 metres x 15
                                                metres.
 Neighbourhood                      Design                                                     Complies
 PO9                                            AO9.1
 Development provides for a lot layout, land    Lots are arranged to front streets
 use and infrastructure configuration that:     and public open space.

    a) provides for an efficient land use       AO9.2
         pattern;                               Development maximises opportunities for
    b) creates compact and walkable             casual surveillance and avoids areas of
         neighbourhoods that are well           concealment by ensuring pathways
         connected to centres, employment,      and public open space have defined
         education facilities, community        edges and are visually exposed to
         services, open space and               roadways.
         recreation facilities;
    c) creates useable and interconnected       AO9.3                                          Not applicable – no new roads or
         movement and open space                Neighbourhoods (including roads,               pathways
         networks;                              pathways and open space) are designed
    d) effectively connects and integrates      with a high degree of legibility with public
         the site with existing or planned      spaces and corridors easy to find and
         development on adjoining sites;        recognise.
    e) provides for moderate and large
         size developments to have
         multiple access points;
    f) promotes a sense of community
         identity and belonging;
    g) promotes a variety of streetscapes;
    h) provides for a high level of amenity,
         having regard to potential noise,
         dust, odour and lighting nuisance
         sources;
    i) integrates prominent site features
         including landmarks,
         native vegetation and views into the
         design;
    j) discourages crime or antisocial
         behaviour by facilitating casual
         surveillance of streets, paths
         and public open space;
    k) avoids the sporadic or out-of-
         sequence creation of lots; and
    l) protects and enhances ecologically
         important areas and provides for
         the clustering of lots into cleared
         areas.
 Infrastructure                                                                                New lot able to comply
 PO10                                           No acceptable outcome provided
 Development accommodates and provides
 for the efficient and timely delivery of
 infrastructure appropriate to the site’s
 setting and intended use.
 PO11                                                                                          Not applicable - no new road or
 Roadway and pathway layout are                 No acceptable outcome provided                 pathway proposed
 predominantly rectilinear with a high
 degree of permeability.

 Editor’s Note— Further detail on traffic
 and the road network is addressed in Part
 9.4.8 Transport Code
 PO12                                           AO12.1                                         Proposal able to comply
 New lots are located, sized and configured     All lots are connected to power
 so as to ensure each lot is capable of         supply and telecommunications
 being serviced by appropriate levels of        services and where located within the
 infrastructure including:                      Urban boundaries, power supply and
                                                communications infrastructure are
   a)   power supply;                           provided               underground.
   b)   telecommunications; and
   c)   where within Local Plan Areas           AO12.2
   d)   reticulated water supply;               If located in a water service area each
   e)   reticulated sewerage; and               new lot can be connected to
   f)   stormwater drainage.                    Unitywater’s water supply network.

                                                AO12.3
                                                If located in a sewerage service area
                                                each new lot can be connected to
                                                Unitywater’s sewerage network.


[OCR of page images]
@ Page7

 

e) minimising exposure to prevailing

than 20 degrees off true north and has

 

winter winds. minimum dimensions of 10 metres x 15
metres.
Neighbourhood Design Complies
Pog AO9.1

Development provides for a lot layout, land
use and infrastructure configuration that:

a) provides for an efficient land use
pattern;

b) creates compact and walkable
neighbourhoods that are well
connected to centres, employment,
education facilities, community
services, open space and
recreation facilities;

c) creates useable and interconnected
movement and open space
networks;

d) effectively connects and integrates
the site with existing or planned
development on adjoining sites;

e) provides for moderate and large
size developments to have
multiple access points;

f) promotes a sense of community
identity and belonging;

g) promotes a variety of streetscapes;

h) provides for a high level of amenity,
having regard to potential noise,
dust, odour and lighting nuisance
sources;

i) integrates prominent site features
including landmarks,
native vegetation and views into the
design;

j) discourages crime or antisocial
behaviour by facilitating casual
surveillance of streets, paths
and public open space;

k) avoids the sporadic or out-of-
sequence creation of lots; and

|) protects and enhances ecologically
important areas and provides for
the clustering of lots into cleared
areas.

Lots are arranged to front streets
and public open space.

AO9.2

Development maximises opportunities for
casual surveillance and avoids areas of
concealment by ensuring pathways

and public open space have defined
edges and are visually exposed to
roadways.

AO9.3

Neighbourhoods (including roads,
pathways and open space) are designed
with a high degree of legibility with public
spaces and corridors easy to find and
recognise.

Not applicable —- no new roads or
pathways

 

Infrastructure

PO10

Development accommodates and provides
for the efficient and timely delivery of
infrastructure appropriate to the site's
setting and intended use.

No acceptable outcome provided

New lot able to comply

 

PO11

Roadway and pathway layout are
predominantly rectilinear with a high
degree of permeability.

Editor’s Note— Further detail on traffic
and the road network is addressed in Part

No acceptable outcome provided

Not applicable - no new road or

pathway proposed

 

9.4.8 Transport Code

PO12 AO12.1 Proposal able to comply
New lots are located, sized and configured | All lots are connected to power

so as to ensure each lot is capable of supply and telecommunications

being serviced by appropriate levels of
infrastructure including:

a) power supply;

b) telecommunications; and

c) where within Local Plan Areas
d) reticulated water supply;

e) reticulated sewerage; and

f) _ stormwater drainage.

 

 

services and where located within the
Urban boundaries, power supply and
communications infrastructure are
provided underground.

AO12.2

Iflocated in a water service area each
new lot can be connected to
Unitywater’s water supply network.

AO12.3

If located in a sewerage service area
each new lot can be connected to
Unitywaters sewerage _ network.

 

 

 

Page 8

 Page 8
                                                AO12.4
                                                If located in a Local plan area lots can
                                                be      connected       to    Council’s
                                                stormwater       drainage      network.

                                                AO12.5
                                                If not in a sewerage service area
                                                each lot has sufficient area and other
                                                attributes to ensure efficient and
                                                effective on-site sewerage disposal.
 PO13                                           AO13.1                                         Future access will be able to comply
 Each lot is provided with safe and             Vehicular access for the development is        with Council requirements.
 convenient vehicle access                      consistent with the function and design of
                                                the      road      it    takes access from.

                                                AO13.2
                                                Development does not require new or
                                                changed access to a state-controlled road
                                                that is a limited access road unless in
                                                accordance with the limited access policy
                                                for    the   state-controlled   road     .

                                                AO13.3
                                                Access easements are in appropriate
                                                locations for safe access and egress, and
                                                supply appropriate widths and levels of
                                                service for the number of vehicles that will
                                                utilise them as per the requirements of
                                                Council’s Planning Scheme Policy PSP6
                                                Engineering design standards – Roads,
                                                drainage           and        earthworks.

                                                Editor's note- Reference should be made
                                                to the Queensland Government's
                                                Development       Assessment      Mapping
                                                System to confirm which are state-
                                                controlled roads or limited access roads.
 Traffic                                                                                       Infill development. Existing road system
 PO14                                           No     acceptable     outcome       provided   able to cater for the one additional lot.
 Traffic generated by the development is
 within the acceptable capacity of external
 roads and does not have an adverse
 impact upon the functioning of the road
 network.

 Editor’s Note— Further detail on traffic
 and the road network is addressed in Part
 9.4.8 Transport Code
 Roads            and           Pathways                                                       Infill development - No new road or
 PO15                                           AO15.1                                         pathways proposed.
 Development involving the creation of new      Where involving the construction of a new
 roads       and    pathways       ensures      road, road planning and design supports
 infrastructure—                                the hierarchy and functional aspects
                                                identified in Council’s Planning Scheme
 a)     provides convenient, safe and           Policy PSP6 on Engineering design
        efficient movement for all modes of     standards – Roads, drainage and
        transport between land use              earthworks.
        activities;
 b)     prioritises pedestrian movement         Editor’s Note— Further detail on road
        and bicycle use over vehicle            and pathway networks is provided in Part
        movements;                              9.4.8 Transport Code
 c)     facilitates efficient, safe and
        accessible bus services that            AO15.2
        connect to existing and future public   The street layout is generally rectilinear
        passenger transport facilities;         and does not rely on culs-de-sac, or
 d)     provides through roads and              where the use of a cul-de-sac is
        minimises the use of culs-de-sac;       unavoidable because of the natural
 e)     minimises the extent of earthworks      features of the site, it does not exceed a
        required by being sympathetic to        length of 200 metres.
        the terrain;
 f)     allows for unimpeded and                AO15.3
        practical access to each proposed       Pathways and pedestrian routes are
        lot; and                                planned to provide clear, safe connections
                                                between residential, open space, transit
 g)     provides for mature street trees.
                                                stops and retail areas, and are located
                                                along, or are visible from, streets or other
                                                public spaces.


[OCR of page images]
@ Page 8

 

AO12.4
If located in a Local plan area lots can

be connected to Council's
stormwater drainage _ network.
AO12.5

If not in a sewerage service area
each lot has sufficient area and other
attributes to ensure efficient and
effective on-site sewerage disposal.

 

 

 

PO13 A013.1 Future access will be able to comply
Each lot is provided with safe and | Vehicular access for the development is | with Council requirements.
convenient vehicle access consistent with the function and design of
the road it takes access from.
A013.2
Development does not require new or
changed access to a state-controlled road
that is a limited access road unless in
accordance with the limited access policy
for the state-controlled road
A013.3
Access easements are in appropriate
locations for safe access and egress, and
supply appropriate widths and levels of
service for the number of vehicles that will
utilise them as per the requirements of
Council's Planning Scheme Policy PSP6
Engineering design standards — Roads,
drainage and earthworks.
Editor's note- Reference should be made
to the Queensland Government's
Development Assessment Mapping
System to confirm which are state-
controlled roads or limited access roads.
Traffic Infill development. Existing road system
PO14 No acceptable outcome provided | able to cater for the one additional lot.
Traffic generated by the development is
within the acceptable capacity of external
roads and does not have an adverse
impact upon the functioning of the road
network.
Editor’s Note— Further detail on traffic
and the road network is addressed in Part
9.4.8 Transport Code
Roads and Pathways Infill development - No new road or
PO15 AO15.1 pathways proposed.
Development involving the creation of new | Where involving the construction of anew
roads and pathways ensures | road, road planning and design supports
infrastructure— the hierarchy and functional aspects

a) provides convenient, safe and
efficient movement for all modes of
transport between land use
activities;

b) __ prioritises pedestrian movement
and bicycle use over vehicle
movements;

c) facilitates efficient, safe and
accessible bus services that
connect to existing and future public
passenger transport facilities;

d) provides through roads and
minimises the use of culs-de-sac;

e) minimises the extent of earthworks
required by being sympathetic to
the terrain;

f) allows for unimpeded and
practical access to each proposed
lot; and

Qg) provides for mature street trees.

 

 

identified in Council's Planning Scheme
Policy PSP6 on Engineering design
standards — Roads, drainage and
earthworks.

Editor’s Note— Further detail on road
and pathway networks is provided in Part
9.4.8 Transport Code

AO15.2

The street layout is generally rectilinear
and does not rely on culs-de-sac, or
where the use of a cul-de-sac is
unavoidable because of the natural
features of the site, it does not exceed a
length of 200 metres.

A015.3

Pathways and pedestrian routes are
planned to provide clear, safe connections
between residential, open space, transit
stops and retail areas, and are located
along, or are visible from, streets or other
public spaces.

 

 

 

Page 9

 Page 9
                                               AO15.4
                                               Sufficient space and soil depth is provided
                                               for the planting of street trees for shade,
                                               amenity and habitat purposes.
 PO16                                          AO16                                          Site able to comply with relevant
 The subdivision layout is designed to         If within 1 kilometre of the Pathways         requirements.
 facilitate pedestrian and cyclist linkages    Network identified in the Local
 with adjoining sites in the immediate area.   Government Infrastructure Plan located in
                                               Part 4, the subdivision design and layout
                                               includes pathways:

                                                a) located in accordance with the
                                                   Pathways Network identified in
                                                   the Local Government Infrastructure
                                                   Plan; or
                                                b) linking to the Pathways Network
                                                   identified in the Local Government
                                                   Infrastructure Plan.
 PO17                                                                                        Not applicable – not an activity centre
 Development on land within activity           No acceptable outcome provided
 centres with active frontages are
 provided with access from a rear lane
 or other access streets to reduce
 potential conflicts with pedestrians
 and cyclists.
 PO18                                          AO18.1                                        No active parkland or open space
 Development provides for parks, drainage      Active parkland or open space which           required for the proposed additional lot.
 reserves and open space infrastructure        links to active parkland is provided in
 that:-                                        accordance with the Council’s
                                               infrastructure network planning;
   a) provides for a range of passive and
      active recreation settings, offering a   OR
      range of informal and formal
      experiences to the community;            AO18.2
   b) accommodates adequate facilities         Park contributions    are paid in
      to meet the needs of the community       accordance with       the applicable
      and is designed to maximise use by       infrastructure            instrument.
      the community it serves;
   c) provides opportunities for all age       AO18.3
      groups and levels of mobility;           Land intended for public open
   d) is well distributed and contributes to   space complements            existing
      the legibility and character of the      adjacent and surrounding open
      specific town, village or locality;      space areas and physical linkages to
   e) creates attractive settings and focal    these    areas    are      provided.
      points for the community, designed
      as attractive and enjoyable,             AO18.4
      functional and safe places to meet       Open space is provided adjacent to
      and recreate;                            waterways, with roads servicing the
   f) benefits the amenity of adjoining        linear parkland and lots located on
      land uses;                               the opposite side of the road to the
                                               waterways.
   g) facilitates the retention and
      protection of ecologically important
                                               AO18.5
      areas, wetlands, waterways,
                                               A park has direct road frontages of a
      drainage lines and native habitat
                                               minimum       of    25%     of     the
      areas, their associated
                                               total allotment boundary              of
      buffers, ecological linkages and
                                               the park to                   provide
      other natural and cultural features;
                                               physical access and          visibility.
   h) incorporates appropriate measures
      for stormwater and flood                 AO18.6
      management;                              Public open space has good
   i) is cost effective to maintain; and       connectivity for users via pedestrian
   j) is dedicated as public land in the       and            cycle          paths.
      early stages of the subdivision.
                                               AO18.7
                                               Landscaping is designed to create
                                               aesthetically pleasing open space
                                               areas and to suit the type, setting and
                                               purpose of the particular park.

                                               AO18.8
                                               Active parkland in all areas other than
                                               the Low      impact       industry zone
                                               and Medium impact industry zone
                                               will contain embellishment in
                                               accordance        with        the Local
                                               Government Infrastructure Plan in


[OCR of page images]
@ Page9

 

AO15.4

Sufficient space and soil depth is provided
for the planting of street trees for shade,
amenity and habitat purposes.

 

PO16

The subdivision layout is designed to
facilitate pedestrian and cyclist linkages
with adjoining sites in the immediate area.

AO16

If within 1 kilometre of the Pathways
Network identified in the Local
Government Infrastructure Plan located in
Part 4, the subdivision design and layout
includes pathways:

a) located in accordance with the
Pathways Network identified in
the Local Government Infrastructure
Plan; or

b) linking to the Pathways Network
identified in the Local Government
Infrastructure Plan.

Site able to comply with relevant

requirements.

 

PO17

Development on land within activity
centres with active frontages are
provided with access from a rear lane
or other access streets to reduce
potential conflicts with pedestrians
and cyclists.

No acceptable outcome provided

Not applicable — not an activity centre

 

PO18

Development provides for parks, drainage
reserves and open space infrastructure
that:-

a) provides for a range of passive and
active recreation settings, offering a
range of informal and formal
experiences to the community;

b) accommodates adequate facilities
to meet the needs of the community
and is designed to maximise use by
the community it serves;

c) provides opportunities for all age
groups and levels of mobility;

d) is well distributed and contributes to
the legibility and character of the
specific town, village or locality;

e) creates attractive settings and focal
points for the community, designed
as attractive and enjoyable,
functional and safe places to meet
and recreate;

f) benefits the amenity of adjoining
land uses;

g) facilitates the retention and
protection of ecologically important
areas, wetlands, waterways,
drainage lines and native habitat
areas, their associated
buffers, ecological linkages and
other natural and cultural features;

h) incorporates appropriate measures
for stormwater and flood
management;

i) _ is cost effective to maintain; and

j) is dedicated as public land in the
early stages of the subdivision.

 

 

A018.1

Active parkland or open space which
links to active parkland is provided in
accordance with the Council's

infrastructure network __ planning;
OR

A018.2

Park contributions are paid in

accordance with the applicable

infrastructure instrument.
A018.3

Land intended forpublic open
space complements existing

adjacent and surrounding open
space areas and physical linkages to
these areas are __ provided.

A018.4

Open space is provided adjacent to
waterways, with roads servicing the
linear parkland and lots located on
the opposite side of the road to the
waterways.

A018.5
A park has direct road frontages of a
minimum of 25% of the

total allotment boundary of
the park to provide
physical access and visibility.
A018.6

Public open  spacehas good
connectivity for users via pedestrian
and cycle paths.
A018.7

Landscaping is designed to create
aesthetically pleasing open space
areas and to suit the type, setting and
purpose of the particular park.

A018.8

Active parkland in all areas other than
the Low impact __ industry zone
and Medium impact industry zone
will contain embellishment — in
accordance with the Local
Government Infrastructure Plan in

 

No active parkland or open space
required for the proposed additional lot.

 

 

Page 10

 Page 10
                                                Part         4         such          as:

                                                 a) children’s play facilities catering for
                                                    various ages including a soft fall
                                                    surface where required and a shade
                                                    cover over play equipment;
                                                 b) seating;
                                                 c) picnic table/s with seats; and
                                                 d) landscaping.

                                                Editor’s Note— Further detail on
                                                Landscaping is addressed in
                                                Part 9.4.5 Landscaping Code
 PO19                                           AO19.1                                           Not applicable – no parkland required
 Land provided for active recreation areas is   Active parkland is of a usable shape free
 of a physical standard and condition           of irregular boundaries.
 suitable for the intended uses and is not
 subject to physical or other constraints       AO19.2
 including contamination, environmental or      Active parkland is located on land that is
 biophysical constraints or legislative         exclusive of—
 protection that would encumber its use.
                                                a)     flood inundation below the
                                                       20% AEP (1:5 year ARI level);
                                                b)     land affected by stormwater or
                                                       overland flow discharge from
                                                       adjacent allotments;
                                                c)     drainage reserves and detention
                                                       basins, which cannot be shown to
                                                       safely and effectively contribute to
                                                       the network of parks and open
                                                       space areas;
                                                d)     land with a slope, or subject to cut or
                                                       fill with a batter slope, that exceeds
                                                       a slope of 15%;
                                                e)     areas of land less than 15 metres
                                                       wide, such as access and service
                                                       and utility easements;
                                                f)     land required to serve primarily as a
                                                       buffer area to any existing
                                                       development or major transport
                                                       corridor; and
                                                g)     power easements.

                                                AO19.3
                                                At least 10% of the total open space
                                                provision for active parkland is exclusive of
                                                flood inundation below the 1% AEP (1:100
                                                year ARI level or the highest recorded
                                                flood level), whichever is the greatest.
 PO24                                                                                            Future application for operational works
 Development provides for the effective         No      acceptable     outcome       provided    will be able to demonstrate compliance.
 drainage of lots and roads in a manner
 that:-

   a) maintains the natural flow regime;
   b) effectively manages stormwater
      quality and quantity; and
   c) ensures no adverse impacts on
      receiving waters and surrounding
      land.

 Editor’s Note— Requirements for
 the design and construction of
 stormwater             management
 infrastructure are addressed in Part
 9.4.9 Water Quality and Drainage
 code




Item 4: Provide additional detail and preliminary plans of the access (vehicle and pedestrian) to
proposed Lot 2. The plans must be prepared by a suitably qualified person and include but not be limited
to;
    4.1. existing vegetation and infrastructure in the road reserve
    4.2. existing surface levels within the road reserve and the adjacent areas of proposed


[OCR of page images]
@ Page 10

 

Part 4 such as:

a) children’s play facilities catering for
various ages including a soft fall
surface where required and a shade
cover over play equipment;

b) seating;

c) picnic table/s with seats; and

d) landscaping.

Editor’s Note— Further detail on
Landscaping is addressed in
Part 9.4.5 Landscaping Code

 

PO19

Land provided for active recreation areas is
of a physical standard and condition
suitable for the intended uses and is not
subject to physical or other constraints
including contamination, environmental or
biophysical constraints or _ legislative
protection that would encumber its use.

AO19.1
Active parkland is of a usable shape free
of irregular boundaries.

A019.2
Active parkland is located on land that is
exclusive of—

a) _ flood inundation below the
20% AEP (1:5 year ARI level);

b) _ land affected by stormwater or
overland flow discharge from
adjacent allotments;

c) drainage reserves and detention
basins, which cannot be shown to
safely and effectively contribute to
the network of parks and open
space areas;

d) land with a slope, or subject to cut or
fill with a batter slope, that exceeds
a slope of 15%;

e) areas of land less than 15 metres
wide, such as access and service
and utility easements;

f) land required to serve primarily as a
buffer area to any existing
development or major transport
corridor; and

g) power easements.

A019.3

At least 10% of the total open space
provision for active parkland is exclusive of
flood inundation below the 1% AEP (1:100
year ARI level or the highest recorded
flood level), whichever is the greatest.

Not applicable — no parkland required

 

PO24

Development provides for the effective
drainage of lots and roads in a manner
that:-

a)maintains the natural flow regime;

b)effectively manages stormwater
quality and quantity; and

c) ensures no adverse impacts on
receiving waters and surrounding
land.

Editor’s Note— Requirements for
the design and construction of
stormwater management
infrastructure are addressed in Part
9.4.9 Water Quality and Drainage
code

 

 

No acceptable outcome provided

 

Future application for operational works
will be able to demonstrate compliance.

 

Item 4: Provide additional detail and preliminary plans of the access (vehicle and pedestrian) to
proposed Lot 2. The plans must be prepared by a suitably qualified person and include but not be limited

to;

4.1. existing vegetation and infrastructure in the road reserve
4.2. existing surface levels within the road reserve and the adjacent areas of proposed

 

Page 11

 Page 11
    Lot 2
    4.3. levels and grades of the proposed access
    4.4. any retaining structures..

Applicant’s Response to Item 4: The applicant advises that this matter can be considered as part of
any future operational works application. Existing vegetation will be retained where possible.


Item 5: Provide a site specific geotechnical investigation and report for proposed Lot 2. The report
must include recommendations for the future development of the site and include comment on the
suitability of on-site infiltration of stormwater

Applicant’s Response to Item 5: The applicant considers that these matters can be addressed as
part of any future operational works application and would not be a determining factor in the assessment
of the application.


Item 6: Provide a preliminary design for stormwater management for a concept for future residential
development on proposed Lot 2. The design must include indicative locations and volumes of the
required on-site infiltration system.

Applicant’s Response to Item 6: Refer item 5 above.


Item 7: The geotechnical report and the stormwater management plan must be consistent in their
recommendations

Applicant’s Response to Item 7: Refer item 5 above.


Item 8: Provide a plan of the location of the existing services for proposed Lot 1 (sewer, water, electrical,
telecommunications and stormwater)

Applicant’s Response to Item 8: The applicant indicates that the site is connected or able to be
connected to existing services in the area.


Item 9: Provide preliminary advice from Unitywater in regard to the sewer system (connection, private
pump system etc) for proposed Lots 1 and 2.

Applicant’s Response to Item 9: The applicant indicates that this matter will be able to be considered
as part of any future operational works applications.


The applicant considers that they have now responded to Council’s information request. The Decision
Making Period has therefore commenced and we request that your Council proceeds with its
assessment of the application as soon as possible in accordance with the Planning Act 2016.

Please contact our Sunshine Coast office if you require any further information and/or clarification.


Yours faithfully,




Nadine Gorton
Senior Planner
martoo consulting pty. ltd


[OCR of page images]
@ Page 11
Lot 2
4.3. levels and grades of the proposed access
4.4. any retaining structures..

Applicant’s Response to Item 4: The applicant advises that this matter can be considered as part of
any future operational works application. Existing vegetation will be retained where possible.

Item 5: Provide a site specific geotechnical investigation and report for proposed Lot 2. The report
must include recommendations for the future development of the site and include comment on the
suitability of on-site infiltration of stormwater

Applicant’s Response to Item 5: The applicant considers that these matters can be addressed as

part of any future operational works application and would not be a determining factor in the assessment
of the application.

Item 6: Provide a preliminary design for stormwater management for a concept for future residential
development on proposed Lot 2. The design must include indicative locations and volumes of the
required on-site infiltration system.

Applicant’s Response to Item 6: Refer item 5 above.

Item 7: The geotechnical report and the stormwater management plan must be consistent in their
recommendations

Applicant’s Response to Item 7: Refer item 5 above.

Item 8: Provide a plan of the location of the existing services for proposed Lot 1 (sewer, water, electrical,
telecommunications and stormwater)

Applicant’s Response to Item 8: The applicant indicates that the site is connected or able to be
connected to existing services in the area.

Item 9: Provide preliminary advice from Unitywater in regard to the sewer system (connection, private
pump system etc) for proposed Lots 1 and 2.

Applicant’s Response to Item 9: The applicant indicates that this matter will be able to be considered

as part of any future operational works applications.

The applicant considers that they have now responded to Council's information request. The Decision
Making Period has therefore commenced and we request that your Council proceeds with its
assessment of the application as soon as possible in accordance with the Planning Act 2016.

Please contact our Sunshine Coast office if you require any further information and/or clarification.

Yours faithfully,

Nadine Gorton

Senior Planner
martoo consulting pty. Itd

Used in these records

About this file

File size
586 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Response to Noosa Council Information Request.pdf · 586 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.