Council archive · source document
Response to Noosa Council Information Request · RAL20/0027
Page 10
Part 4 such as:
a) children’s play facilities catering for
various ages including a soft fall
surface where required and a shade
cover over play equipment;
b) seating;
c) picnic table/s with seats; and
d) landscaping.
Editor’s Note— Further detail on
Landscaping is addressed in
Part 9.4.5 Landscaping Code
PO19 AO19.1 Not applicable – no parkland required
Land provided for active recreation areas is Active parkland is of a usable shape free
of a physical standard and condition of irregular boundaries.
suitable for the intended uses and is not
subject to physical or other constraints AO19.2
including contamination, environmental or Active parkland is located on land that is
biophysical constraints or legislative exclusive of—
protection that would encumber its use.
a) flood inundation below the
20% AEP (1:5 year ARI level);
b) land affected by stormwater or
overland flow discharge from
adjacent allotments;
c) drainage reserves and detention
basins, which cannot be shown to
safely and effectively contribute to
the network of parks and open
space areas;
d) land with a slope, or subject to cut or
fill with a batter slope, that exceeds
a slope of 15%;
e) areas of land less than 15 metres
wide, such as access and service
and utility easements;
f) land required to serve primarily as a
buffer area to any existing
development or major transport
corridor; and
g) power easements.
AO19.3
At least 10% of the total open space
provision for active parkland is exclusive of
flood inundation below the 1% AEP (1:100
year ARI level or the highest recorded
flood level), whichever is the greatest.
PO24 Future application for operational works
Development provides for the effective No acceptable outcome provided will be able to demonstrate compliance.
drainage of lots and roads in a manner
that:-
a) maintains the natural flow regime;
b) effectively manages stormwater
quality and quantity; and
c) ensures no adverse impacts on
receiving waters and surrounding
land.
Editor’s Note— Requirements for
the design and construction of
stormwater management
infrastructure are addressed in Part
9.4.9 Water Quality and Drainage
code
Item 4: Provide additional detail and preliminary plans of the access (vehicle and pedestrian) to
proposed Lot 2. The plans must be prepared by a suitably qualified person and include but not be limited
to;
4.1. existing vegetation and infrastructure in the road reserve
4.2. existing surface levels within the road reserve and the adjacent areas of proposed
[OCR of page images]
@ Page 10
Part 4 such as:
a) children’s play facilities catering for
various ages including a soft fall
surface where required and a shade
cover over play equipment;
b) seating;
c) picnic table/s with seats; and
d) landscaping.
Editor’s Note— Further detail on
Landscaping is addressed in
Part 9.4.5 Landscaping Code
PO19
Land provided for active recreation areas is
of a physical standard and condition
suitable for the intended uses and is not
subject to physical or other constraints
including contamination, environmental or
biophysical constraints or _ legislative
protection that would encumber its use.
AO19.1
Active parkland is of a usable shape free
of irregular boundaries.
A019.2
Active parkland is located on land that is
exclusive of—
a) _ flood inundation below the
20% AEP (1:5 year ARI level);
b) _ land affected by stormwater or
overland flow discharge from
adjacent allotments;
c) drainage reserves and detention
basins, which cannot be shown to
safely and effectively contribute to
the network of parks and open
space areas;
d) land with a slope, or subject to cut or
fill with a batter slope, that exceeds
a slope of 15%;
e) areas of land less than 15 metres
wide, such as access and service
and utility easements;
f) land required to serve primarily as a
buffer area to any existing
development or major transport
corridor; and
g) power easements.
A019.3
At least 10% of the total open space
provision for active parkland is exclusive of
flood inundation below the 1% AEP (1:100
year ARI level or the highest recorded
flood level), whichever is the greatest.
Not applicable — no parkland required
PO24
Development provides for the effective
drainage of lots and roads in a manner
that:-
a)maintains the natural flow regime;
b)effectively manages stormwater
quality and quantity; and
c) ensures no adverse impacts on
receiving waters and surrounding
land.
Editor’s Note— Requirements for
the design and construction of
stormwater management
infrastructure are addressed in Part
9.4.9 Water Quality and Drainage
code
No acceptable outcome provided
Future application for operational works
will be able to demonstrate compliance.
Item 4: Provide additional detail and preliminary plans of the access (vehicle and pedestrian) to
proposed Lot 2. The plans must be prepared by a suitably qualified person and include but not be limited
to;
4.1. existing vegetation and infrastructure in the road reserve
4.2. existing surface levels within the road reserve and the adjacent areas of proposed
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Noosa Council Information Request.pdfRelated documentApplication case desk ↗
About this file
- File size
- 586 KB (small file)
- File type
No other editions are linked here.