Lot 2
4.3. levels and grades of the proposed access
4.4. any retaining structures..
Applicant’s Response to Item 4: The applicant advises that this matter can be considered as part of
any future operational works application. Existing vegetation will be retained where possible.
Item 5: Provide a site specific geotechnical investigation and report for proposed Lot 2. The report
must include recommendations for the future development of the site and include comment on the
suitability of on-site infiltration of stormwater
Applicant’s Response to Item 5: The applicant considers that these matters can be addressed as
part of any future operational works application and would not be a determining factor in the assessment
of the application.
Item 6: Provide a preliminary design for stormwater management for a concept for future residential
development on proposed Lot 2. The design must include indicative locations and volumes of the
required on-site infiltration system.
Applicant’s Response to Item 6: Refer item 5 above.
Item 7: The geotechnical report and the stormwater management plan must be consistent in their
recommendations
Applicant’s Response to Item 7: Refer item 5 above.
Item 8: Provide a plan of the location of the existing services for proposed Lot 1 (sewer, water, electrical,
telecommunications and stormwater)
Applicant’s Response to Item 8: The applicant indicates that the site is connected or able to be
connected to existing services in the area.
Item 9: Provide preliminary advice from Unitywater in regard to the sewer system (connection, private
pump system etc) for proposed Lots 1 and 2.
Applicant’s Response to Item 9: The applicant indicates that this matter will be able to be considered
as part of any future operational works applications.
The applicant considers that they have now responded to Council’s information request. The Decision
Making Period has therefore commenced and we request that your Council proceeds with its
assessment of the application as soon as possible in accordance with the Planning Act 2016.
Please contact our Sunshine Coast office if you require any further information and/or clarification.
Yours faithfully,
Nadine Gorton
Senior Planner
martoo consulting pty. ltd
[OCR of page images]
@ Page 11
Lot 2
4.3. levels and grades of the proposed access
4.4. any retaining structures..
Applicant’s Response to Item 4: The applicant advises that this matter can be considered as part of
any future operational works application. Existing vegetation will be retained where possible.
Item 5: Provide a site specific geotechnical investigation and report for proposed Lot 2. The report
must include recommendations for the future development of the site and include comment on the
suitability of on-site infiltration of stormwater
Applicant’s Response to Item 5: The applicant considers that these matters can be addressed as
part of any future operational works application and would not be a determining factor in the assessment
of the application.
Item 6: Provide a preliminary design for stormwater management for a concept for future residential
development on proposed Lot 2. The design must include indicative locations and volumes of the
required on-site infiltration system.
Applicant’s Response to Item 6: Refer item 5 above.
Item 7: The geotechnical report and the stormwater management plan must be consistent in their
recommendations
Applicant’s Response to Item 7: Refer item 5 above.
Item 8: Provide a plan of the location of the existing services for proposed Lot 1 (sewer, water, electrical,
telecommunications and stormwater)
Applicant’s Response to Item 8: The applicant indicates that the site is connected or able to be
connected to existing services in the area.
Item 9: Provide preliminary advice from Unitywater in regard to the sewer system (connection, private
pump system etc) for proposed Lots 1 and 2.
Applicant’s Response to Item 9: The applicant indicates that this matter will be able to be considered
as part of any future operational works applications.
The applicant considers that they have now responded to Council's information request. The Decision
Making Period has therefore commenced and we request that your Council proceeds with its
assessment of the application as soon as possible in accordance with the Planning Act 2016.
Please contact our Sunshine Coast office if you require any further information and/or clarification.
Yours faithfully,
Nadine Gorton
Senior Planner
martoo consulting pty. Itd
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Noosa Council Information Request.pdfRelated documentApplication case desk ↗
About this file
- File size
- 586 KB (small file)
- File type
No other editions are linked here.