PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 8 OCTOBER 2019
Electricity and Telecommunication Services
30. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits and
pipes to accommodate the future connection of optic fibre technology
telecommunications.
31. Certification must be submitted to Council from all relevant service providers which
certifies that the development has met the requirements of this Decision Notice and
all applicable legislation at the time of construction.
Easements
32. The existing access easement that extends through the site must be modified to
encompass the proposed traffic movements and be generally in accordance with
Change to Carparking & Proposed Easements plan, Reference no. D-02391.01-C,
dated 12.09.2019.
33. An easement for carparking purposes must be registered in favour of the adjoining
property (Lot 5 on SP264847) against the title of the subject site. The easement must
be of sufficient dimensions to fully encompass the proposed parking space indicated
on Change to Carparking & Proposed Easements plan, Reference no. D-02391.01-C,
dated 12.09.2019. The terms of the easement must be submitted to Council for
approval as part of the subsequent plan sealing application and be registered prior to
the issue of any Operational Works approval.
34. An easement for sight line purposes must be registered in favour of the subject
property against the title of the adjoining property (Lot 5 on SP264847). The
easement must be of sufficient dimensions to fully encompass the necessary sight
lines indicated on Change to Carparking & Proposed Easements plan, Reference no.
D-02391.01-C, dated 12.09.2019. This must be in accordance with AS\NZS2890. The
terms of the easement must be submitted to Council for approval as part of the
subsequent plan sealing application and be registered prior to the issue of any
Operational Works approval.
35. Unless otherwise agreed in writing by the relevant service provider, any public or third
party infrastructure located on the subject site must be placed within an easement
registered against the title of the property.
36. All easements must be designed in accordance with the planning scheme and
granted at no cost to the Grantee. Where the Grantee is Council or a service
authority, the easement documentation must be in accordance with the Grantee’s
standard easement terms. Draft easement documentation must be submitted to
Council for endorsement.
37. All works must be kept clear of any existing or proposed easements on the subject
land, unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
38. All earthworks and associated retaining structures/batters/anchors must be
undertaken in accordance with an Operational Works approval, and contained
entirely within the subject site unless written permission from the respective
landowner(s) is provided to Council.
39. All retaining walls must be designed and constructed in accordance with the planning
scheme and must be certified by an RPEQ where exceeding 1.0m in height. All
retaining walls that are publicly accessible and exceed 1.0m in height must be fitted
with a commercial grade safety fence.
Page 8 of 48
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.