Damage to Services and Assets
40. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the
development.
Any repair work which proposes to alter the alignment or level of existing services
and assets must first be referred to the relevant service authority for approval.
Signage
41. Proposed signage for the premises is to be in accordance with Council’s signage
policy.
42. Any proposed signs must be integrated into the building design. A signage plan must
be submitted with an application for Operational works detailing the proposed
location, size and number of signs.
43. Only 1 pylon sign is permitted for the subject site.
Landscaping Works
44. The development site must be landscaped. The works must be undertaken in
accordance with an Operational Works approval and the Planning Scheme Policy 3
Landscaping Plants and Guidelines for that specific area and must include in
particular:
a. the works shown on the approved Ground Floor Plan;
b. Advanced tree species, shrubs and grounds covers to the frontage of the
development to provide visual screening the bulk of the building including:
i. A minimum of 8 x 100L trees that are of local native species;
ii. landscaping must provide for local native shade trees suitable for the area
to reduce solar reflection and provide local amenity;
iii. landscaping must provide a range of ground covers and shrubs to soften
the bulk of the buildings and provide visual disruption of continuous walls
and facades;
iv. Landscape gardens beds must be of sufficient depth, area and growing
media to promote good plant growth.
c. vegetated screening of any electrical transformers, retaining walls, bin storage
areas, ancillary pump facilities and the like from the road frontage.
45. All landscape works must be established and maintained in accordance with the
approved design for the life of the development, and in a manner that ensures
healthy, sustained and vigorous plant growth. All plant material must be allowed to
grow to full form and be refurbished when its life expectancy is reached.
46. All landscape works must be maintained generally in accordance with the approved
design for the life of the development.
Stormwater Management
47. In conjunction with submission of any development application for Operational Works,
provide a revised Stormwater Management Plan, relevant modelling, and revised site
drainage design which achieves the following:
Page 9 of 48
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.