Decision Notice MCU170510
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
Development Permit for Operational Work
APPROVED PLANS
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
SC-7207-C005 C Construction Management Plan 21 September 2017
prepared by Empire Engineering
SC-7207-C020 C Siteworks and Drainage Plan 21 September 2017
prepared by Empire Engineering
SC-7207-C025 C Siteworks and Drainage Sections 21 September 2017
and Details Sheet 1 prepared by
Empire Engineering
SC-7207-C030 C Pavement Plan prepared by Empire 21 September 2017
Engineering
SC-7207-C040 C Signs and Linemarking Plan 21 September 2017
prepared by Empire Engineering
2016-52 11 of 14 P Landscape Plan, prepared by 21.09.17
Building Suncoast Green
2016-52 12 of 14 P Landscape Plan, prepared by 21.09.17
Building Suncoast Green
PRIOR TO COMMENCEMENT OF WORKS
Engineering
2. All necessary approvals from external service providers (eg Unitywater) and external parties
on which the development works are proposed have been obtained and a copy supplied to
Council.
3. A condition report including photographs of the frontage of the site must be completed and
submitted to Council at the prestart meeting and prior to any works commencing.
4. Certificates demonstrating currency of public liability insurance and works insurance covering
the works must be submitted to Council at the prestart meeting.
5. Council must be contacted at least 5 working days prior to any works commencing to
organise a prestart. The contact number to arrange a pre-start meeting is 5329 6245. The
pre-start meeting must include the relevant parties for the following aspects of the works:
a. Civil engineering works;
b. Landscape works;
c. Erosion and sediment control works;
d. Other relevant parties
6. A Traffic Management Plan must be submitted to Council prior to the pre-start meeting and
must specifically address the following:
Page 5 of 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.