Decision Notice MCU170510
a. Traffic Management during all aspects of the construct phase including:
i. A Traffic Management Control Plan in accordance with Manual of Uniform Traffic
Control Devices (MUTCD) detailing all temporary signage and traffic control measures
prior to construction
ii. Maintenance of safe pedestrian access across the frontage of the site both during daily
construction and after daily construction has ceased
iii. Adequate parking arrangements for construction workers
iv. No queuing of trucks is permitted on residential streets, especially prior to 7.00am.
Further parked trucks must have engines turned off
7. Any changes to the details associated with the supervising RPEQ or Principal Contractor
during construction, must be notified to council in writing within five business days of the
change occurring.
8. Any conflict between the development and an existing or proposed service must be referred
to the relevant service authority for determination prior to commencement of works.
Landscaping Works
9. Landscape works must be supervised, undertaken and certified by qualified persons. All
works must be completed in accordance with this Decision Notice.
10. Landscape works must be maintained in good condition for the life of the development and
include refurbishing where necessary in accordance with the approved plans.
11. Where damage occurs to any Council asset as a result of the development works, it must be
repaired immediately where it creates a hazard that presents risk to person or property. Other
damage must be repaired prior to completion of works.
12. Landscape works must:
a. Delineate all planting to grassed area interfaces with a timber edge.
b. Ensure amenity or sales signage and ancillary infrastructure is not installed within the
road reserve.
c. Ensure permanent irrigation is not installed within the road reserve.
d. Ensure mulch is aged, comprised of leaf and limb material of varying sizes, free of
foreign matter including anthropogenic waste, rock, soil/sediment contamination and is
applied to all planting areas to ensure a minimum 100mm depth once settled.
13. Street trees must:
a. Meet Specifying Trees – a guide to assessment of tree quality (NATSPEC).
b. Be located in accordance with engineering requirements for safe vehicle and
pedestrian sight lines.
14. Turfed areas must be must be free of pest, diseases and weeds and level with adjoining
surfaces.
DURING CONSTRUCTION
Engineering
15. The developer must meet any costs to repair damage to any Council asset during
construction, where damage is a result of the development works. Damage to assets must
be repaired immediately where it creates a hazard to the community. In circumstances where
the damage does not create a hazard to the community, it must be repaired immediately on
completion of the works associated with the development.
Page 6 of 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.