Noosa Plan 2020: Amendment 2
Part 8 Overlays \ 8.2 Overlay codes \ 8.2.9 Regional Infrastructure Overlay Code
Bulk water supply infrastructure - asset type Type of development Recommended separation distance minimum
Pipelines and channels (1) Buildings/Structures/Earthworks 20 metres from edge of pipe
Blasting(2,3) 200 metres from edge of pipe
Water treatment plants and water quality facilities Sensitive Land Use 250 metres from building footprint
Buildings/Structures/Earthworks 20 metres from building footprint
Blasting (2,3) 200 metres from building footprint
Reservoir facilities Buildings/Structures/Earthworks 20 metres from building footprint
Blasting (2,3) 200 metres from building footprint
Pump stations Sensitive Land Use 100 metres from building footprint
Buildings/Structures/Earthworks 20 metres from building footprint
Blasting 2,3) 200 metres from building footprint
Dam structures and weirs (4) Earthworks Dam/Weir Height(5) 0-5 meters 50 metres from the toe of the dam/weir
Earthworks Dam/Weir Height(5) 5-10 metres 100 metres from the toe of the dam/weir
Earthworks Dam/Weir Height(5) 10-15 metres 150 metres from the toe of the dam/weir
Earthworks Dam/Weir Height(5) 15-20 metres 200 metres from the toe of the dam/weir
Earthworks Dam/Weir Height(5) > 20 metres 500 metres from the toe of the dam/weir
Blasting (2,3) 500 metres from dam wall/earth embankment/weir
footprint
1 Channels are included in the pipelines and channels layer SPP IMS but are not differentiated from pipelines. Where an applicant identifies the bulk water supply
infrastructure is a channel rather than a pipe, applicants should contact the utility provider to discuss appropriate separation distances.
2 Refers to any type of development involving blasting <500 kg charge mass per delay, use of explosives, piling, and other vibratory/compaction machinery (over 20t
centrifugal force) during construction and/or operation. For blasting over 500 kg, applicants are to contact the asset owner as a greater separation zone may apply.
Print Date: 09/12/2025 Page 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Town Planning Report 18 Taylor Court Cooroy Rev A (1).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.