Noosa Plan 2020: Amendment 2
Part 8 Overlays \ 8.2 Overlay codes \ 8.2.9 Regional Infrastructure Overlay Code




3
    It is recommended that blasting provisions be included in an extractive industry code (or similar).
4 For dam structures and weirs, applicants should contact the utility provider to determine the toe of the dam/weir.
5 Dam/weir height is to be taken at the maximum section of the dam/weir (from dam/weir crest to dam/weir toe).



Table 8.2.9.4 Criteria for assessable development - Gas pipeline and Major Electricity Infrastructure

 Performance outcomes                                        Acceptable outcomes                                             Comments

 Gas pipeline corridor and buffer area

 PO1                                                         AO1.1
 Development, including uses and works are                   Buildings and structures are setback a minimum of 40            Not Applicable
 constructed and operated to avoid:                          metres from a gas pipeline corridor.
 (a) compromising the viability of the gas pipeline          AO1.2
      corridor; or                                           The use does not involve the storage of flammable,
 (b) damaging or adversely affecting the existing or         explosive or other hazardous materials within 200
      future operation of a gas pipeline within the gas      metres of the gas pipeline corridor.
      pipeline corridor.                                     OR
                                                             AO1.3
                                                             Written conformation of the pipeline license holder of
                                                             Petroleum Pipeline License 32 that the setback
                                                             distance and design of the development does not
                                                             impact the future use of the gas pipeline.
                                                             Editor's note- should a lesser setback distance be
                                                             proposed, it is recommended that the applicant consult with
                                                             the relevant gas pipeline manager prior to the lodgement of a
                                                             development application to determine how compliance with
                                                             the performance outcome can be achieved.

 Performance outcomes                                        Acceptable outcomes

 Major Electricity Infrastructure

 PO2                                                         No acceptable outcome provided
 Development does not increase risk to community                                                                             Not Applicable
 health or safety, or the operation and reliability of major
 electricity infrastructure



Print Date: 09/12/2025                                                                                                                        Page 7

Log in to download the original (Town Planning Report 18 Taylor Court Cooroy Rev A (1).pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.