Town Planning Report 18 Taylor Court Cooroy Rev A (1)
Attached to the e-mail Fw_ Email 3 of 3 - DA lodgement - 18 Taylor Ct Cooroy Lot 2SP197518 - Combined MCU_ OPW_ RAL under CTS (Pt 3).msg.
Noosa Plan 2020: Amendment 2
Part 8 Overlays \ 8.2 Overlay codes \ 8.2.9 Regional Infrastructure Overlay Code
3
It is recommended that blasting provisions be included in an extractive industry code (or similar).
4 For dam structures and weirs, applicants should contact the utility provider to determine the toe of the dam/weir.
5 Dam/weir height is to be taken at the maximum section of the dam/weir (from dam/weir crest to dam/weir toe).
Table 8.2.9.4 Criteria for assessable development - Gas pipeline and Major Electricity Infrastructure
Performance outcomes Acceptable outcomes Comments
Gas pipeline corridor and buffer area
PO1 AO1.1
Development, including uses and works are Buildings and structures are setback a minimum of 40 Not Applicable
constructed and operated to avoid: metres from a gas pipeline corridor.
(a) compromising the viability of the gas pipeline AO1.2
corridor; or The use does not involve the storage of flammable,
(b) damaging or adversely affecting the existing or explosive or other hazardous materials within 200
future operation of a gas pipeline within the gas metres of the gas pipeline corridor.
pipeline corridor. OR
AO1.3
Written conformation of the pipeline license holder of
Petroleum Pipeline License 32 that the setback
distance and design of the development does not
impact the future use of the gas pipeline.
Editor's note- should a lesser setback distance be
proposed, it is recommended that the applicant consult with
the relevant gas pipeline manager prior to the lodgement of a
development application to determine how compliance with
the performance outcome can be achieved.
Performance outcomes Acceptable outcomes
Major Electricity Infrastructure
PO2 No acceptable outcome provided
Development does not increase risk to community Not Applicable
health or safety, or the operation and reliability of major
electricity infrastructure
Print Date: 09/12/2025 Page 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Town Planning Report 18 Taylor Court Cooroy Rev A (1).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.